The board said it had engaged with the PCB and local authorities and assured the players that adequate security arrangements were in place before directing the team to proceed with the scheduled fixtures. There was, however, a change to the original schedule. The second and third ODIs were moved to November 14 and 16, from the original dates of 13th and 15th. The tri-series, which was to start on November 17, was moved to 18th.