Refresh

2026-01-17T15:38:06.584Z
Artemis 2 rocket creeps along toward launch pad

A towering NASA Artemis 2 moon rocket with twin white side boosters being hauled toward a seaside launch pad.

NASA’s Artemis 2 SLS moon rocket on the road to the Launch Pad 39B at the Kennedy Space Center in Cape Canaveral, Florida about 3 hours after starting its daylong jouney. (Image credit: NASA TV)

NASA’s Artemis 2 moon rocket, the second-ever Space Launch System booster, is slowly making progress along the 4-mile journey to its Florida pad at Launch Complex 39B at the Kennedy Space Center in Cape Canaveral, Florida.

It’s a slow roll for the Artemis 2 SLS. NASA’s giant Crawler Transporter 2 carrier vehicle is carrying the 11 million pound stack at about 1 mile an hour. That’s it’s top speed. The massive carrier vehicle was originally built to move NASA’s Saturn V rockets in the Apollo era, and later moved space shuttles to the pad as well.

Here’s a video of the 32-story rocket as it emerged from NASA’s cavernous Vehicle Assembly Building earlier today.

2026-01-17T13:55:46.646Z
Artemis 2 moon rocket emerges from giant hangar

A giant rocket rolls out to toward the launch pad and is reflected in a lagoon for artemis 2

(Image credit: Josh Dinner/Space.com)

As we near the 2-hour mark of NASA’s up to 10-hour move of the Artemis 2 rocket to its Florida launch pad, the 322-foot-tall Space Launch System is fully visible and has exited its massive Vehicle Assembly Building hangar.

Above is an amazing image from Space.com’s Josh Dinner at the Kennedy Space Center as he’s monitoring the rollout to Pad 39B.

Here’s a video update from Josh via the Space.com TikTok channel.

“The place is basically a rocket cathedral,” Dinner says of the VAB.

Tariq Malik

Tariq Malik

Editor-in-Chief

2026-01-17T12:27:59.112Z
First motion for Artemis 2 rollout!

A giant orange and white rocket standing inside a towering rocket

(Image credit: NASA/Joel Kowsky)

NASA reports that the towering Artemis 2 Space Launch System rocket is officially on the move.

First motion for today’s rollout occurred at 7:04 a.m. EST (1204 GMT) as the huge rocket began its daylong trip to the launch pad. It is about 4 miles to Pad 39B from NASA’s 52-stroy Vehicle Assembly Building (VAB), where the SLS for Artemis 2 was stacked and assembled.

“It takes us a little while to get out of the building, but about an hour after we get that first motion, you’ll begin to see this beautiful vehicle cross over the threshold of the VAB and come outside for the world to have a look,” Artemis 2 Launch Director Charlie Blackwell-Thompson said Friday.

Here’s a look at our report from Friday’s Artemis 2 press conference:

NASA hopes to launch Artemis 2 astronauts to the moon next month, but it’s going to be tight: ‘This is not a rush’

Tariq Malik

Tariq Malik

Editor-in-Chief

2026-01-17T12:17:28.008Z
Rollout day begins for NASA’s Artemis 2

Tariq Malik

Tariq Malik

Editor-in-Chief

2026-01-16T23:25:01.908Z
How to watch NASA’s Artemis 2 rocket rollout

NASA’s Artemis II Live Views from Kennedy Space Center – YouTube
NASA's Artemis II Live Views from Kennedy Space Center - YouTube

Watch On

Now that we’re all set for rollout, this will be our final post of the day.

Thanks for joining us and we’ll see you bright an early on Saturday for rollout.

2026-01-16T22:09:22.172Z
Artemis 2 launch in February on a tight timeline

2026-01-16T18:07:06.566Z
NASA Artemis 2 rollout briefing ends

NASA’s Artemis II Rollout and Mission Overview News Conference (Jan. 16, 2026) – YouTube
NASA’s Artemis II Rollout and Mission Overview News Conference (Jan. 16, 2026) - YouTube

Watch On

Overall, it appears NASA is ready to move the 322-foot-tall Space Launch System rocket out to Pad 39B at the Kennedy Space Center in Florida on Saturday, Jan. 17, but time appears tight for the space agency’s hope to launch the four Artemis 2 astronauts to the moon in February as planned.

Artemis 2 is NASA’s first crewed Artemis mission and the first astronaut mission to the moon in over 50 years. As such, a series of tests on both the SLS rocket and Orion spacecraft for the mission must go well before it will be clear for astronauts to fly on then.

NASA has launched an SLS rocket and Orion spacecraft before, on the Artemis 1 mission in November 2022, but that was an uncrewed test flight. The Orion spacecraft on Artemis 2 is the first to include many life support systems to sustain astronuts on the 10-day mission.

NASA also wants to complete a fueling test on Feb. 2 that will help the space agency decide if it can proceed with a February launch. The February launch window is limited to a series of days between Feb. 6-10.

It took three attempts to launch Artemis 1, with fuel leaks contributing to two delays. NASA believe its has fixes in place, but needs to test them before Artemis 2 can launch.

If Artemis 2 is unable to launch in February, NASA can try again in March and April.

Artemis Launch Director Charlie Blackwell-Thompson said NASA has launch opportunities every month for Artemis 2, ranging from a few days to up to a week.

Tariq Malik

Tariq Malik

Editor-in-Chief

2026-01-16T17:51:11.736Z
Artemis 2 rocket ready for rollout, fueling test set

Tariq Malik

Tariq Malik

Editor-in-Chief

2026-01-16T17:05:09.547Z
NASA Artemis 2 rollout press conference begins

John Honeycutt, Artemis II mission management team chairCharlie Blackwell-Thompson, Artemis launch director, Exploration Ground SystemsJeff Radigan, Artemis II lead flight director, Flight Operations DirectorateLili Villarreal, landing and recovery director, Exploration Ground SystemsJacob Bleacher, chief exploration scientist, Exploration Systems Development Mission Directorate

“I will say, it really doesn’t get much better than this,” Honeycutt says in opening remarks.” This is making history.”

Tariq Malik

Tariq Malik

Editor-in-Chief

2026-01-16T15:28:50.789Z
NASA to hold press conference on Artemis 2 rollout

NASA’s Artemis II Rollout and Mission Overview News Conference (Jan. 16, 2026) – YouTube
NASA’s Artemis II Rollout and Mission Overview News Conference (Jan. 16, 2026) - YouTube

Watch On

Hello, Space Fans! NASA is one day away from its historic rollout of the Artemis 2 rocket that will carry four astronauts to the moon for the first time in over 50 years.

The Artemis 2 rocket, NASA’s second Space Launch System booster, is currently scheduled to head out to Launch Pad 39B at the Kennedy Space Center in Florida on Saturday, Jan. 17, at 7 a.m. EST (1200 GMT). It should take several hours for the towering 322-foot rocket to reach the launch pad.

Space.com’s Josh Dinner is on the scene at Kennedy Space Center for the Artemis 2 rollout, and will share insights on what the view is like there.

But first, NASA will hold a press conference today at 12 p.m. EST (1700 GMT) to discuss the Artemis 2 rollout, plans for the Feb. 6 launch of the 10-day mission around the moon.

You can watch that press conference live in the window above.

Tariq Malik

Tariq Malik

Editor-in-Chief

Please follow our community guidelines.”>

You must confirm your public display name before commenting

Please logout and then login again, you will then be prompted to enter your display name.

Logout