{"id":164595,"date":"2025-09-23T23:36:14","date_gmt":"2025-09-23T23:36:14","guid":{"rendered":"https:\/\/www.newsbeep.com\/au\/164595\/"},"modified":"2025-09-23T23:36:14","modified_gmt":"2025-09-23T23:36:14","slug":"commonwealth-avenue-bridge-upgrade-likely-to-cause-commuter-chaos","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/au\/164595\/","title":{"rendered":"Commonwealth Avenue Bridge upgrade likely to cause commuter chaos"},"content":{"rendered":"<p class=\"paragraph_paragraph__iYReA\">It&#8217;s one of Canberra&#8217;s most important pieces of infrastructure, connecting the capital&#8217;s north and south.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Thousands drive, cycle and walk across Commonwealth Avenue Bridge every day, but major work addressing its structural safety will soon get underway, starting two years of significant traffic disruption.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The bridge has not undergone any significant upgrades since it opened to traffic in 1963, but work to strengthen it is now required.<\/p>\n<p><img decoding=\"async\" alt=\"Commonwealth Avenue Bridge in the 1960s\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/09\/d22b149c64dbe2cdc6b5f6555d398643\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">The Commonwealth Avenue Bridge was opened more than six decades ago. (Richard Clough, National Library of Australia.)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;These works are to ensure that it remains a useful asset that reflects the growth of Canberra and the needs of community,&#8221; National Capital Authority (NCA) chief executive Karen Doran said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;This work will safeguard it for the next 60 years for the Canberra community.<\/p>\n<p>&#8220;It will cause some disruption, but it&#8217;s essential works that need to be done.&#8221;<\/p>\n<p class=\"paragraph_paragraph__iYReA\">While the $137.5 million project focuses on strengthening the bridge, the shared pathways will also be widened, new lighting will be installed and safety barriers will be replaced.<\/p>\n<p><img decoding=\"async\" alt=\"A woman with chin-length brown hair stands smiling on a playing field.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/09\/54ab584d47d4965639509dea8d5f5036\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Karen Doran says the strengthening will safeguard Commonwealth Avenue Bridge for the next 60 years. (ABC News: Harry Frost)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Work will be completed in two stages: first the western span of the bridge, impacting the northbound lanes, followed by the eastern span, impacting southbound lanes.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">It means only one side of the bridge will be open at a time, seeing its six lanes shrink to three to accommodate traffic, pedestrians and cyclists travelling in both directions.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Construction is anticipated to begin later this year, with each stage to take around 12 months to complete.<\/p>\n<p>&#8220;I acknowledge that is a long time and we will have issues of disruption for the community which we&#8217;re looking to manage,&#8221;  Ms Doran said.What will the impact on public transport be?<img decoding=\"async\" alt=\"A man wearing a yellow high-vis vest over a black suit and tie stands in front of a blue bus speaking into two microphones.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/09\/5d37399137d9c3ce6b64a8df513b4ac6\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Chris Steel says there will be a temporary reduction in the frequency of weekday bus services. (Facebook: Chris Steel MLA)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Almost 1,400 Transport Canberra bus services cross the bridge every day during the week.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Transport Minister Chris Steel says the works will have a cascading and unavoidable impact across the entire bus network and there will be a direct impact on the frequency of bus services.<\/p>\n<p>&#8220;All of those buses \u2014 including general traffic \u2014 will now be squeezing into half the road space once bridge works commence,&#8221;  Mr Steel said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;To deliver a reliable bus service that takes into account the impact of the NCA&#8217;s bridge works, this unfortunately means the frequency of bus services on weekdays will need to be reduced temporarily during construction.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;There will be a range of mitigations that we can put in place, but we can&#8217;t fully mitigate the impacts of this.&#8221;<\/p>\n<p><img decoding=\"async\" alt=\"Two pedestrians walking northbound across a three-lane road bridge with a pedestrian path over a lake.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/09\/79791529d859dab1a0f9c3b6cbd1e70e\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">The works will see shared pathways widened, new lighting installed, and safety barriers replaced. (ABC News: Joel Wilson)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The exact number of bus services that will be impacted is not yet clear, but Mr Steel said the ACT government was working closely with the NCA.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The NCA has been undertaking a traffic management assessment and once that&#8217;s finalised, it will provide a clearer idea on the impact on travel times and will allow the government to release a new bus timetable.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Options to prioritise public transport are being considered by the NCA, but no decisions have been made yet about what that will look like.<\/p>\n<p>&#8220;We have been considering options around having dedicated lanes for buses and how we run the three available lanes to traffic to reflect the peak flows,&#8221;  Ms Doran said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;As soon as we know the option we are going to be pursuing, we are going to be communicating that with the public.&#8221;<\/p>\n<p>Are the works connected to light rail?<img decoding=\"async\" alt=\"A drawing of a light rail vehicle crossing an up upgraded Commonwealth Avenue Bridge. \" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/09\/778638d419b404b7a7c3b0fd7773d3db\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Light rail Stage 2B will see a new bridge built between the two spans of Commonwealth Avenue Bridge. (Supplied: ACT government)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The works aren&#8217;t connected with the plan to extend light rail across Lake Burley Griffin.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">That project is still in the planning and approval stage, and <a class=\"Link_link__kR0xA Link_link__5eL5m ScreenReaderOnly_srLinkHint__OysWz Link_showVisited__C1Fea Link_showFocus__ALyv2\" href=\"https:\/\/www.abc.net.au\/news\/2025-07-07\/act-government-unveils-details-for-light-rail-stage-2b\/105502204\" data-component=\"Link\" data-uri=\"coremedia:\/\/article\/105502204\" rel=\"nofollow noopener\" target=\"_blank\">involves building a new bridge in between the existing two spans of Commonwealth Avenue Bridge<\/a>.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Mr Steel said even if the government wanted to progress its light rail expansion plans at the same time as the NCA works, that would not have been possible.<\/p>\n<p>&#8220;Light rail stage 2B works to build a new bridge over Lake Burley Griffin can&#8217;t be constructed concurrently with the bridge strengthening project as there would be a direct conflict between the two projects,&#8221;  he said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">But if light rail&#8217;s extension to Woden is eventually approved, there&#8217;ll be more traffic chaos well after the NCA&#8217;s works are complete.<\/p>\n","protected":false},"excerpt":{"rendered":"It&#8217;s one of Canberra&#8217;s most important pieces of infrastructure, connecting the capital&#8217;s north and south. Thousands drive, cycle&hellip;\n","protected":false},"author":2,"featured_media":164596,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[2666,64,63,108369,2667,108374,108368,108373,11758,4217,108372,78712,2289,2668,108375,108376,44,108370,9493,88931,108371,13807,1191,4207,108377],"class_list":["post-164595","post","type-post","status-publish","format-standard","has-post-thumbnail","category-australia","tag-act","tag-au","tag-australia","tag-bridge","tag-canberra","tag-chaos","tag-commonwealth-avenue","tag-commute","tag-construction","tag-infrastructure","tag-lanes","tag-light-rail","tag-local-news","tag-local-stories","tag-national-capital-authority","tag-nca","tag-news","tag-reinforce","tag-road","tag-six","tag-strengthening","tag-three","tag-traffic","tag-upgrade","tag-widening"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts\/164595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/comments?post=164595"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts\/164595\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/media\/164596"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/media?parent=164595"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/categories?post=164595"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/tags?post=164595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}