{"id":304872,"date":"2025-11-24T04:50:17","date_gmt":"2025-11-24T04:50:17","guid":{"rendered":"https:\/\/www.newsbeep.com\/au\/304872\/"},"modified":"2025-11-24T04:50:17","modified_gmt":"2025-11-24T04:50:17","slug":"infuriated-inverloch-community-still-waiting-as-foi-reveals-years-of-delay-in-erosion-works","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/au\/304872\/","title":{"rendered":"Infuriated Inverloch community &#8216;still waiting&#8217; as FOI reveals years of delay in erosion works"},"content":{"rendered":"<p class=\"paragraph_paragraph__iYReA\">Standing outside Inverloch Surf Lifesaving Club, president Glenn Arnold watches with trepidation as a storm comes in.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The clubhouse sits on top of a bank of sandbags, installed to try to reduce the effects of ongoing erosion.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">But the erosion is battering the bags, and the clubhouse is on the edge.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Mr Arnold said &#8220;significant&#8221; erosion meant local lifesavers had changed how they did things by shifting their beach access points for emergency responses.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Since 2012, more than 70 metres of foreshore at Inverloch surf beach has been lost to erosion.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;Our access points aren&#8217;t where they used to be, so we&#8217;ve got to travel further, [which has] delayed [response] times,&#8221; Mr Arnold said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Sandbags have bought time for the clubhouse and the beach, but Mr Arnold said the town desperately needed a permanent solution to the erosion.\u00a0<\/p>\n<p><img decoding=\"async\" alt=\"A sign on a window that says 'no shoreline, no support, no solutions'.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/11\/bee4fbf19247eede168f3bf04df736c0\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">A sign seen at the Inverloch Surf Lifesaving Club this year. (ABC News: Danielle Kutchel)<\/p>\n<p>&#8216;Urgent&#8217; works delayed<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The Victorian Bass Coast town of Inverloch has been facing severe beach erosion for more than a decade, losing an average of about 10 metres of beach a year.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Documents released under Freedom of Information (FOI) reveal the Victorian government was aware of &#8221;an urgent&#8221; need for erosion works at Inverloch&#8217;s surf beach three years ago.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The documents show the state government identified the risk of major erosion or inundation in 2022, and said there was a need for on ground works to begin &#8220;as soon as possible&#8221;.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The 2022 documents include an application for funding under the Federal Coastal and Estuarine Risk Mitigation Program for the Victorian Cape to Cape Resilience Project on-ground works.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The application was submitted by the Victorian Department of Environment, Land, Water and Planning, now the Department of Energy, Environment and Climate Action (DEECA).<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The application said the works would &#8220;reduce disaster risk to critical infrastructure and services for the Inverloch township&#8221;.<\/p>\n<p><img decoding=\"async\" alt=\"A view from the top of sandbags looking out into a grey bay over a beach in a storm with the tide coming in.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/11\/693d1ac8b3c847dfadb9b64da57353dc\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">The view from the sandbags near the clubhouse at the Inverloch Surf Lifesaving Club. (ABC News: Danielle Kutchel)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The department applied for \u2014 and received \u2014 $3.3 million in federal funding for on-ground works &#8220;that will have significant disaster risk mitigation benefits&#8221;, the application says, such as dune management, beach renourishment, groynes and revetments.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">But the money is yet to be spent.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The application identified the economic impact of the permanent erosion of Inverloch&#8217;s surf beach as between $2 million and $80 million in lost tourism expenditure per year.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The grant application was submitted in 2022.\u00a0<\/p>\n<p class=\"paragraph_paragraph__iYReA\">It said on-ground works to mitigate erosion at the beach would need to take place within two years &#8220;to mitigate potential disaster risk if a major erosion\/inundation event were to occur&#8221;.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The application also reveals that &#8220;state and local government and agency budget constraints&#8221; meant there was no funding available to begin the on-ground works within that timeframe.<\/p>\n<p>&#8216;Still waiting&#8217;<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Mr Arnold said he felt the government had failed to act soon enough.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;It&#8217;s infuriating, quite frankly, that three years on we might see some work actually get done when this could have been resolved back when the work was requested,&#8221; he said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">He said the lifesaving club would &#8220;bend and compromise&#8221; to get the work done and ensure its survival.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">But he added that any works on the beach would likely affect how the lifesavers ran upcoming summer programs, including the Nippers.<\/p>\n<p><img decoding=\"async\" alt=\"A building on top of a dune, at the foot of it are large sandbags. It is a sunny day.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/11\/57d561ccc5050e0b590f3a986bacac20\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Glenn Arnold says the town is still waiting for a permanent erosion fix. (ABC News: Danielle Kutchel)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">A gathering of locals in July saw overwhelming support for the installation of rock bags at the beach.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;There are solutions around not only Victoria but around the country that have worked, but they&#8217;re just not getting considered here,&#8221; Mr Arnold said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;We&#8217;ve got businesses that rely on tourism, and they&#8217;re putting all of that at risk.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;Three years on, we&#8217;re still waiting and we shouldn&#8217;t be.&#8221;<\/p>\n<p>Coastline in &#8216;imminent&#8217; danger<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The documents were obtained under Freedom of Information by Nationals MP for Eastern Victoria Melina Bath.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">She has accused the state government of sitting on the $3.3 million in funding, to the detriment of the Inverloch beach.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;The federal government provided that [money], and since then we have seen delays and no work,&#8221; she said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Ms Bath said the documents revealed the state government acknowledged that &#8220;the danger to this foreshore was imminent&#8221;.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Bass Coast Shire Council will begin extending the sandbag wall at the foot of the clubhouse at the end of this month.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The works are expected to take four to five weeks and have been funded by DEECA.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">A spokesperson for the council said prior to the 2024-25 financial year, it had spent on average $61,000 a year at Inverloch Surf Beach on coastal protection measures, including installing the sandbag wall and ongoing sand renourishment.<\/p>\n<p><img decoding=\"async\" alt=\"A view across sandbags and a beach on a partly cloudy day.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2025\/11\/54448b0eae460c795ab4263ca9d91ea3\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Bass Coast Shire Council will soon begin working on an extension of the sandbag wall. (ABC News: Danielle Kutchel)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The ABC sent a detailed list of questions to the premier for comment, but was referred to DEECA.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">DEECA did not respond to the questions directly, but did outline actions it had taken to address erosion on background.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">In September, DEECA announced that dune reconstruction works would begin at the beach in February 2026, including sand dredging and revegetation.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The project is the first to be completed under the Victorian government&#8217;s Cape to Cape Resilience Plan and will be funded by the $3.3 million federal grant.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The state government expects the works will protect the Inverloch foreshore for five to 10 years.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The Cape to Cape Resilience Plan is a long-term strategy to manage the coastline and impact of erosion between Cape Paterson and Cape Liptrap.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">It is expected to be released before the end of the year.<\/p>\n","protected":false},"excerpt":{"rendered":"Standing outside Inverloch Surf Lifesaving Club, president Glenn Arnold watches with trepidation as a storm comes in. The&hellip;\n","protected":false},"author":2,"featured_media":304873,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[64,63,17713,75,17710,69,80061,173822,173820,173823,173821,128,48995,6771,26693],"class_list":["post-304872","post","type-post","status-publish","format-standard","has-post-thumbnail","category-environment","tag-au","tag-australia","tag-beach","tag-environment","tag-erosion","tag-federal-government","tag-freedom-of-information","tag-glenn-arnold","tag-inverloch","tag-inverloch-surf-lifesaving-club","tag-melina-bath","tag-science","tag-state-government","tag-tourism","tag-victorian-government"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts\/304872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/comments?post=304872"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts\/304872\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/media\/304873"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/media?parent=304872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/categories?post=304872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/tags?post=304872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}