{"id":517548,"date":"2026-03-04T06:29:12","date_gmt":"2026-03-04T06:29:12","guid":{"rendered":"https:\/\/www.newsbeep.com\/au\/517548\/"},"modified":"2026-03-04T06:29:12","modified_gmt":"2026-03-04T06:29:12","slug":"cloud-carrier-proposes-gas-fired-power-station-to-power-moss-vale-ai-data-centre","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/au\/517548\/","title":{"rendered":"Cloud Carrier proposes gas-fired power station to power Moss Vale AI data centre"},"content":{"rendered":"<p class=\"paragraph_paragraph__iYReA\">A small town in the NSW Southern Highlands is watching the AI revolution take shape in its backyard, as plans emerge to build one of the state&#8217;s largest gas-fired power stations to run a data-processing complex.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The proposal from Sydney company Cloud Carrier would see three data centres and a 700-megawatt (MW) power station built on a site six kilometres from Moss Vale.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The power plant would be made up of 21 reciprocating engines, rather than the turbines used in traditional peaking power stations, generating enough energy to run 70,000 homes<\/p>\n<p class=\"paragraph_paragraph__iYReA\">As the state prepares for more and more data centres to come online in the AI age, the project provides an insight into their enormous energy requirements.<\/p>\n<p><img decoding=\"async\" alt=\"Toby wears a colourful shirt and kneels near a robot.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2026\/03\/c3fa0cf634507216ccd0c2081459b690.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Toby Walsh, an AI expert, says the project should be rolled out in a responsible way. (ABC News: Berge Breiland)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Professor Toby Walsh is chief scientist at the University of NSW AI Institute.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;I don&#8217;t think we fully appreciate the physical size of the infrastructure that&#8217;s needed to give us AI services, to give us the digital services that we&#8217;re increasingly using,&#8221; he said.<\/p>\n<p>&#8220;If we&#8217;re not careful, this is going to be another major sink of electricity and also a use of valuable water.&#8221;<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;We&#8217;ve got to roll this out in a responsible way.&#8221;<\/p>\n<p class=\"paragraph_paragraph__iYReA\">There are already 90 data-centre projects up and running in NSW and dozens more approved or in the planning pipeline.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;NSW is really keen to see the investment and the potential in terms of data centres,&#8221; Environment Minister Penny Sharpe told Budget Estimates last week.<\/p>\n<p>&#8220;You can&#8217;t go anywhere without people talking about AI, talking about the importance of data centres.&#8221;Gas for data<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Cloud Carrier has already constructed one small data centre on the site, and hopes to have the full &#8220;campus&#8221; up and running in five to eight years.<\/p>\n<p><img decoding=\"async\" alt=\"Greg, middle-aged Caucasian, smiles, stands in front of a wall with cloud carrier logo in white, wears black shirt and glasses.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2026\/03\/9bb982cf80a620de8822fe0ec16f9351.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Greg Jackson says gas-fired generation is the company&#8217;s best option. (ABC Illawarra: Penny Burfitt)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Its lead engineer, Greg Jackson, said the company was building essential infrastructure needed for the country&#8217;s future.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;Potentially, you could support the data requirements of the federal government in this space,&#8221; he said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">He said the project would use no town water, thanks to a chip-cooling system that recycled water harvested on site on a loop.<\/p>\n<p><img decoding=\"async\" alt=\"A large stainless steel vat connected to pipes with wheels on them. its a water recycling system at a factory.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2026\/03\/3960a24e545e4003623cedbb69e1de1b.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">The data centre recycles the same water, supplied from its own harvesting on-site. (ABC News: Toby Hemmings)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">But he said the amount of power needed for the high-capacity chips used to store and process AI exceeded the grid&#8217;s capability in the area.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;For reliability and economic reasons, pipeline natural gas is a suitable fuel,&#8221; he said.<\/p>\n<p>&#8220;That is transitioning to more renewable fuels and as they become available, we will transition our plant to use those fuels.&#8221;<img decoding=\"async\" alt=\"Greg with glasses in shirt that says &quot;cloud carrier&quot; points to a map on a wall.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2026\/03\/8bf6261992944727617ea04e364aee0a.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Greg Jackson says Cloud Carrier plans to build 21 gas-fired generator halls to run their AI data centres. (ABC Illawarra: Penny Burfitt)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Mr Jackson said the company would treat its emissions and reduce the plant&#8217;s pollutants to well below the NSW Environment Protection Authority&#8217;s limits for the area.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">He said the company wanted to be &#8220;a partner in the region,&#8221; and was committed to employing from the local area.<\/p>\n<p>Energy anxiety<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Director of the University of Wollongong&#8217;s Energy Futures, Ty Christopher, said the prospect of data centres generating their own power on site was concerning.<\/p>\n<p>&#8220;Going to a direct energy supply for these data centres \u2014 directly burning gas to generate their electricity \u2014 is going to slow down that journey toward net zero for Australia,&#8221;  he said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;It&#8217;s still a fossil fuel.&#8221;<\/p>\n<p><img decoding=\"async\" alt=\"Smiling Ty, Caucasian, salt and pepper hair, in grey suit jacket and pink shirt, sits next to tablet, building behind.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2026\/03\/07629421e022d8ee1a68812528db8105.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Ty Christopher says he is concerned about data centres using gas to produce their own energy. (ABC Illawarra: Justin Huntsdale)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">A recent report from consulting firm Baringa predicted data centres would use 11 per cent of the country&#8217;s energy by 2035 and could drive up emissions nationwide by 14 per cent in the same timeframe.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;We are going to need to substantially upgrade the grid and we&#8217;re going to need to have much more generation come into the grid to supply these data centres,&#8221; Mr Christopher said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Professor Walsh said state and federal governments would need to balance stringent planning frameworks with the need for data centres onshore.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;I definitely think we should be looking to build lots of data centres,&#8221; he said.<\/p>\n<p>&#8220;We don&#8217;t necessarily want to put our sensitive data outside our sovereign borders \u2014 our sensitive medical, or security or commercial data. We want to be able to have control of that.&#8221;Communities on the front line<\/p>\n<p class=\"paragraph_paragraph__iYReA\">A NSW upper house inquiry into data centres has been announced, with hearings to commence in May.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Part of its remit is to investigate the impact data centres have on communities.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The Cloud Carrier proposal is in the early stages in the State Significant Projects pipeline.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">An Environmental Impact Statement has not been prepared yet, but the buzz around Moss Vale is beginning to grow.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Jessica Ryall, who lives about 2.5 kilometres from the Cloud Carrier site, said she was &#8220;shocked&#8217; when she saw the plans.<\/p>\n<p><img decoding=\"async\" alt=\"A dark-haired woman in glasses smiles while standing in a backyard with a clothes hoist.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2026\/03\/c7474a06fdf4c49b855fb8df1700e985.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">Jessica Ryall says she is concerned about pollutants, emissions and vibrations. (ABC Illawarra: Penny Burfitt)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;We&#8217;re fine with the data centre, it&#8217;s the gas plant attached to it that&#8217;s the issue,&#8221; she said.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">Community group Southern Highlands Matters is waiting for more information about the project to emerge, but has raised preliminary concerns about location, emissions and pollutants .<\/p>\n<p class=\"paragraph_paragraph__iYReA\">&#8220;If it&#8217;s approved here, then that sets up a precedent and it could be approved anywhere in NSW with a gas line,&#8221; Ms Ryall said.<\/p>\n<p><img decoding=\"async\" alt=\"Image of sign reading &quot;stop the na... gas plant&quot; with some letters unstuck and hanging, greenery behind.\" class=\"Image_image__5tFYM ContentImage_image__DQ_cq\"  src=\"https:\/\/www.newsbeep.com\/au\/wp-content\/uploads\/2026\/03\/b47267a75aa35c0aa9427fc9fdafd0f5.jpeg\" loading=\"lazy\" data-component=\"Image\" data-lazy=\"true\"\/><\/p>\n<p class=\"Typography_base__sj2RP FigureCaption_text__zDxQ5 Typography_sizeMobile12__w_FPC Typography_lineHeightMobile20___U7Vr Typography_regular__WeIG6 Typography_colourInherit__dfnUx\" data-component=\"Typography\">A community member voices their opposition to the project with this sign. (ABC Illawarra: Penny Burfitt)<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The Wingecarribee Shire Council said it would wait for more details before making any submissions on the project.<\/p>\n<p class=\"paragraph_paragraph__iYReA\">The inquiry will host its first hearings in May.<\/p>\n","protected":false},"excerpt":{"rendered":"A small town in the NSW Southern Highlands is watching the AI revolution take shape in its backyard,&hellip;\n","protected":false},"author":2,"featured_media":517549,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[64,63,99,258544,1772,2572,31614,192707,155396,258545,258546],"class_list":["post-517548","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-au","tag-australia","tag-business","tag-cloud-carrier","tag-data-centres","tag-energy","tag-fossil-fuel","tag-gas-fired-power","tag-southern-highlands-matters","tag-university-of-nsw-ai-institute","tag-university-of-wollongongs-energy-futures"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts\/517548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/comments?post=517548"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/posts\/517548\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/media\/517549"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/media?parent=517548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/categories?post=517548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/au\/wp-json\/wp\/v2\/tags?post=517548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}