{"id":413990,"date":"2026-01-16T22:02:09","date_gmt":"2026-01-16T22:02:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/413990\/"},"modified":"2026-01-16T22:02:09","modified_gmt":"2026-01-16T22:02:09","slug":"one-step-closer-to-the-moon-artemis-2-rocket-ready-for-the-pad","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/413990\/","title":{"rendered":"One step closer to the Moon: Artemis 2 rocket ready for the pad"},"content":{"rendered":"<p>TITUSVILLE, Florida \u2014 Canada\u2019s <a href=\"https:\/\/spaceq.ca\/artemis-2\/\" rel=\"nofollow noopener\" target=\"_blank\">first human mission<\/a> to the Moon is ready to roll out early tomorrow (Jan. 17) from the iconic Vehicle Assembly Building at NASA\u2019s Kennedy Space Center in Florida.<\/p>\n<p>SpaceQ expects to be on site as one of a few Canadian media watching the Space Launch System rocket, scheduled to carry Canadian Space Agency astronaut Jeremy Hansen and NASA astronauts Reid Wiseman, Christina Koch and Victor Glover and its Orion vehicle to space. The rocket is expected to start moving at 7 a.m. EST for as long as a 12-hour journey, covering 6.5 km between the VAB and KSC\u2019s Launch Pad 39B.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1290\" height=\"2048\" data-attachment-id=\"45015\" data-permalink=\"https:\/\/spaceq.ca\/one-step-closer-to-the-moon-artemis-2-rocket-ready-for-the-pad\/55043421195_7bcac0ad95_k\/\" data-orig-file=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/01\/55043421195_7bcac0ad95_k.jpg\" data-orig-size=\"1290,2048\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;(NASA\/Aubrey Gemignani)&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;(NASA\/Aubrey Gemignani)&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"55043421195_7bcac0ad95_k\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/55043421195_7bcac0ad95_k.jpg?fit=189%2C300&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/55043421195_7bcac0ad95_k.jpg?fit=645%2C1024&amp;ssl=1\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/01\/55043421195_7bcac0ad95_k.jpg\" alt=\"NASA\u2019s Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, is seen inside the Vehicle Assembly building as preparations continue for roll out to Launch Pad 39B, Thursday, Jan. 15, 2026 at NASA\u2019s Kennedy Space Center in Florida. \" class=\"wp-image-45015\"  \/><\/p>\n<p>\t\tNASA\u2019s Artemis II SLS (Space Launch System) rocket and Orion spacecraft, secured to the mobile launcher, is seen inside the Vehicle Assembly building as preparations continue for roll out to Launch Pad 39B, Thursday, Jan. 15, 2026 at NASA\u2019s Kennedy Space Center in Florida. Credit: NASA\/Aubrey Gemignani<\/p>\n<p>The launch for the round-the-moon mission is scheduled for as soon as Feb. 6, although that date is very much subject to change as NASA completes the rollout, hooking up the rocket to ground systems, performing a wet dress rehearsal, and completing other items before launch.<\/p>\n<p>SpaceQ attended a briefing in-person at the media centre at KSC today (Jan. 16) in which NASA discussed the 10-day Moon mission, along with the major goals and science of Artemis 2 \u2014 essentially, to prove out the Orion\u2019s ability to carry people while doing observations on the Moon and the human body ahead of the first lunar landing attempt since Apollo 17 in December 1972.<\/p>\n<p>The next mission, Artemis 3, may land people on the Moon as soon as 2028 \u2014 but this is all assuming that Artemis 2 meets enough of its goals and that the next mission proceeds on schedule. With Artemis 2 expecting to launch in as little as three weeks, here are some of the main issues NASA was asked about at the briefing.<\/p>\n<p>The accelerated launch of Crew-12<\/p>\n<p>An unidentified crew member on SpaceX Crew-11 fell ill during their mission, necessitating an expedited, but non-emergency return to Earth early on Thursday so that the astronaut could be medically treated. This situation means that only one U.S. crewmember is on the International Space Station (ISS) right now, so some American science and tech work will need to be delayed until the next crew can come on board.<\/p>\n<p>How does this relate to Artemis 2? NASA is working to bring Crew-12 up to the ISS in February, at roughly the same time that Artemis 2\u2019s mission may be ongoing. At least one journalist at the briefing asked how NASA is doing in deconflicting these two missions, without introducing unnecessary risk, and whether it was feasible to bring Artemis 2 up under these conditions.<\/p>\n<p>\u201cWe need to do that at the right pace,\u201d said Jeff Radigan, Artemis 2 lead flight director. He said what NASA is trying to achieve is to \u201censure that both of them [both missions] are ready to go\u201d in the recognition that often, human spaceflight means dealing with technical issues or other constraints that may be delaying launch.<\/p>\n<p>The goal is to keep moving forward with launch preparations at a careful pace, he emphasized, with safety top of mind but also with the eye of preserving launch opportunities when those would be available. NASA will especially be watching moments when \u201cthe hardware is talking to us,\u201d he said, which allows agency officials to dictate the appropriate speed (or delay) that is required for mission safety requirements. Radigan also pushed back against any perception that NASA is in a \u201crush.\u201d<\/p>\n<p>John Honeycutt, Artemis 2 mission management team chair, said he has \u201ca good eye\u201d for what speed is appropriate. \u201cI\u2019ve got one job \u2014 safe crew return,\u201d he also said earlier in the press conference. \u201cWe will fly when we\u2019re ready.\u201d<\/p>\n<p>Wet dress rehearsal<\/p>\n<p>The previous mission to Artemis 2, the uncrewed Artemis 1 that flew Orion around the Moon in 2022, had numerous issues during its own wet dress rehearsals. NASA expected that given the developmental nature of the program, the new SLS rocket would take some practice to properly load hypergolics ahead of launch.<\/p>\n<p>There was a fairly extensive list of issues across four rehearsals ahead of the successful launch, which <a href=\"https:\/\/gizmodo.com\/nasa-sls-launch-unfinished-rehearsals-artemis-1-1849474140\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Gizmodo listed<\/a> as including \u201cfaulty ventilation fans on the mobile launcher, a misconfigured manual vent valve, overly cold temperatures and frost during propellant loading, a small hydrogen leak on the tail service mast umbilical, issues with the supplier of gaseous nitrogen, and a faulty helium check valve that needed to be replaced.\u201d<\/p>\n<p>Charlie Blackwell-Thompson, Artemis launch director, said as a result several modifications have been put in place ahead of Artemis 2. Changes to how engineers load hydrogen, modifications to some of the hardware, and adjustment of flow temperatures are some of the differences she listed. She emphasized, however, that rockets can be rockets. Nothing is routine, as \u201cyou can have hardware that fails at any time.\u201d<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"780\" height=\"527\" data-attachment-id=\"45025\" data-permalink=\"https:\/\/spaceq.ca\/one-step-closer-to-the-moon-artemis-2-rocket-ready-for-the-pad\/51979615973_5bf7834010_c\/\" data-orig-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/51979615973_5bf7834010_c.jpg?fit=800%2C540&amp;ssl=1\" data-orig-size=\"800,540\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;(NASA\/Joel Kowsky)&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;(NASA\/Joel Kowsky)rrFor copyright and restrictions refer to -\\u00a0http:\/\/www.nasa.gov\/multimedia\/guidelines\/index.html&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"51979615973_5bf7834010_c\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/51979615973_5bf7834010_c.jpg?fit=300%2C203&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/51979615973_5bf7834010_c.jpg?fit=780%2C527&amp;ssl=1\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/01\/51979615973_5bf7834010_c.jpg\" alt=\"Artemis I Wet Dress Rehearsal - NASA\u2019s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Complex 39B, Sunday, April 3, 2022. Credit: NASA\/Joel Kowsky\" class=\"wp-image-45025\"  \/>Artemis I Wet Dress Rehearsal \u2013 NASA\u2019s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Complex 39B, Sunday, April 3, 2022. Credit: NASA\/Joel Kowsky<\/p>\n<p>The heat shield<\/p>\n<p>NASA administrator Jared Isaacman made an overview evaluation of the heat shield one of his main priorities in the first few weeks of the job, even inviting some media to sit in on the technical briefing recently for transparency purposes \u2014 <a href=\"https:\/\/arstechnica.com\/space\/2026\/01\/nasa-chief-reviews-orion-heat-shield-expresses-full-confidence-in-it-for-artemis-ii\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Ars Technica<\/a> and the <a href=\"https:\/\/www.wsj.com\/science\/space-astronomy\/nasa-heat-shield-test-astronaut-flight-1ce26626\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Wall Street Journal<\/a>, who were allowed to catalogue the discussions without identifying the participants. Isaacman was satisfied with the discussion, which is another piece allowing Artemis 2 to continue proceeding to launch.<\/p>\n<p>The heat shield discussion has been ongoing for years, ever since evaluation of Artemis 1\u2019s mission showed that the Orion spacecraft showed \u201cunexpected loss of charred material during re-entry,\u201d <a href=\"https:\/\/www.nasa.gov\/news-release\/nasa-shares-orion-heat-shield-findings-updates-artemis-moon-missions\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">according to NASA<\/a>. The agency determined it will fly a modified reentry profile for Artemis 2 to lessen the heating (the Orion spacecraft\u2019s manufacturing was fairly mature when the analysis was ongoing, so NASA is using the same heat shield on Artemis 2 as it did on Artemis 1). Then the heat shield will be reconfigured for Artemis 3.<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"780\" height=\"490\" data-attachment-id=\"45027\" data-permalink=\"https:\/\/spaceq.ca\/one-step-closer-to-the-moon-artemis-2-rocket-ready-for-the-pad\/50090730713_d49837508f_c\/\" data-orig-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/50090730713_d49837508f_c.jpg?fit=799%2C502&amp;ssl=1\" data-orig-size=\"799,502\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;NASA\/Isaac Watson&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;For copyright and restrictions, refer to http:\/\/www.nasa.gov\/multimedia\/guidelines\/index.html&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"50090730713_d49837508f_c\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/50090730713_d49837508f_c.jpg?fit=300%2C188&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/spaceq.ca\/wp-content\/uploads\/2026\/01\/50090730713_d49837508f_c.jpg?fit=780%2C490&amp;ssl=1\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/01\/50090730713_d49837508f_c.jpg\" alt=\"Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, from left, technicians Kenny Leidner, Diamond ScharSenstine, Russ Novak and Darlene Beville with ASRC Federal, inspect AVCOAT block bonding on the Artemis II heat shield on July 2, 2020. Credit: NASA\/Isaac Watson\" class=\"wp-image-45027\"  \/>Inside the Neil Armstrong Operations and Checkout Building high bay at NASA\u2019s Kennedy Space Center in Florida, from left, technicians Kenny Leidner, Diamond ScharSenstine, Russ Novak and Darlene Beville with ASRC Federal, inspect AVCOAT block bonding on the Artemis II heat shield on July 2, 2020. Credit: NASA\/Isaac Watson<\/p>\n<p>NASA made these decisions following extensive analysis, which the agency discussed <a href=\"https:\/\/www.nasa.gov\/missions\/artemis\/nasa-identifies-cause-of-artemis-i-orion-heat-shield-char-loss\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">in December 2024<\/a>. When asked about the heat shield and the recent discussions around it, Honeycutt put it this way: \u201cWe have complicated problems that aren\u2019t black and white, and we do have varied opinions across the team.\u201d He added that after all this work, \u201cthe analysis and the testing shows that we\u2019re in good shape for the mission profile.\u201d<\/p>\n<p>One of the main limitations of the heat shield is it affects reentry timing, which in turn affects the launch windows for the mission. While there are fewer launch opportunities, launch director Blackwell-Thompson said NASA can keep launching Artemis 2 for a window at least once every month indefinitely, with the length of the window changing by the month. The <a href=\"https:\/\/spaceq.ca\/artemis-2-launch-windows\/\" rel=\"nofollow noopener\" target=\"_blank\">launch windows<\/a> released in February, March and April are about a week long each.<\/p>\n<p>\n\tRelated<\/p>\n","protected":false},"excerpt":{"rendered":"TITUSVILLE, Florida \u2014 Canada\u2019s first human mission to the Moon is ready to roll out early tomorrow (Jan.&hellip;\n","protected":false},"author":2,"featured_media":413991,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[58777,58760,49,48,52877,105501,6294,307,66],"class_list":["post-413990","post","type-post","status-publish","format-standard","has-post-thumbnail","category-science","tag-artemis-ii","tag-artemis-program","tag-ca","tag-canada","tag-canadian-space-agency","tag-jeremy-hansen","tag-moon","tag-nasa","tag-science"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/413990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=413990"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/413990\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/413991"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=413990"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=413990"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=413990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}