{"id":503598,"date":"2026-02-27T18:50:08","date_gmt":"2026-02-27T18:50:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/503598\/"},"modified":"2026-02-27T18:50:08","modified_gmt":"2026-02-27T18:50:08","slug":"nasa-moves-to-revamp-lunar-program-as-artemis-ii-undergoes-repairs","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/503598\/","title":{"rendered":"NASA moves to revamp lunar program as Artemis II undergoes repairs"},"content":{"rendered":"<p><a style=\"display:block\" href=\"https:\/\/www.theglobeandmail.com\/resizer\/v2\/M67C3YZD3BDHPM5J2A45JAGCSM.jpg?auth=dfbbd2dee3816eacf67c4369d9b94eda4e3e6ef05f24249d76a89af9ef21cad4&amp;width=600&amp;height=400&amp;quality=80&amp;smart=true\" aria-haspopup=\"true\" data-photo-viewer-index=\"0\" rel=\"nofollow noopener\" target=\"_blank\">Open this photo in gallery:<\/a><\/p>\n<p class=\"figcap-text\">NASA&#8217;s Artemis II SLS moon rocket with the Orion spacecraft rolls back toward the Vehicle Assembly Building at the Kennedy Space Center on Wednesday in Cape Canaveral, Fla.John Raoux\/The Associated Press<\/p>\n<p class=\"c-article-body__text text-pr-5\">Two days after rolling its towering SLS rocket off of the launch pad for repairs, the U.S. space agency NASA is not yet sure when the Artemis II lunar mission will be ready to launch, but it is making changes to subsequent flights to the moon in the face of harsh realities about the program\u2019s slow pace.<\/p>\n<p class=\"c-article-body__text text-pr-5\">\u201cLaunching a rocket as important and as complex as SLS every three years is not a path to success,\u201d said NASA administrator Jared Isaacman at a news briefing on Friday to discuss the program\u2019s status.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The blunt assessment comes as engineers investigate a helium flow issue in the upper stage of the SLS that was first flagged last Saturday and requiring moving the rocket back into the giant vehicle assembly building at the Kennedy Space Center in Florida. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Canada is a partner in the Artemis program. Canadian astronaut Jeremy Hansen is among four crewmembers slated to fly on Artemis II, the first human mission to fly around the moon in more than 53 years.<\/p>\n<p class=\"c-article-body__text text-pr-5\">During the Friday briefing, mission managers confirmed that repairs are underway in hopes of having the rocket back on the launch pad and ready to lift off ahead of a launch window in early April. It is not yet clear if issues with the rocket can be resolved in time.<\/p>\n<p class=\"c-article-body__text mv-16 l-inset text-pb-8\" data-sophi-feature=\"interstitial\"><a href=\"https:\/\/www.theglobeandmail.com\/world\/article-artemis-ii-launch-updates-nasa\/\" rel=\"nofollow noopener\" target=\"_blank\">NASA\u2019s Artemis II launch hits new problem, putting March date in jeopardy<\/a><\/p>\n<p class=\"c-article-body__text text-pr-5\">Mr. Isaacman pointed to the long lag time between launches as part of the reason why it is difficult to eliminate technical issues with the SLS.<\/p>\n<p class=\"c-article-body__text text-pr-5\">\u201cWhen you are launching every three years, your skills atrophy. You lose muscle memory,\u201d he said.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Mr. Isaacman outlined several changes to the program, including redirecting Artemis III from a mission to land on the lunar surface in 2028 to an intermediate step on the way to that goal. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Under the new plan, Artemis III will be a mission to low Earth orbit to test the ability to rendezvous with one or both of the lunar landers that are currently being developed by private sector partners, SpaceX and Blue Origin.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The aim would be to launch the flight next year, Mr. Isaacman said, with the possibility of up to two lunar landing attempts to follow in 2028. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Mr. Isaacman said that discussions about adjusting the program were already underway before a problem surfaced last weekend that delayed the launch of Artemis II.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The rocket was rolled out in mid-January in advance of a launch opportunity in early February. Hydrogen fuel leaks that occurred during a dress rehearsal stymied those plans. Following a second dress rehearsal, mission managers said last week that they were ready for a launch attempt beginning on March 6. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Less than 24 hours later, the helium flow problem was detected and it became clear the rocket would need to be removed from the launch pad so that engineers could access the problem.<\/p>\n<p class=\"c-article-body__text text-pr-5\">\u201cThe data were pretty clear that we were in a no-go situation,\u201d said Lori Glaze, acting associate administrator for NASA\u2019s Exploration Systems Development Mission Directorate.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Dr. Glaze added the team working on the rocket was streamlining its efforts, \u201cto give us the very best possible chance at a launch in the early April launch period.\u201d<\/p>\n<p class=\"c-article-body__text text-pr-5\">To achieve its mission, Artemis II can only launch during a limited period of time each lunar month, when the moon, Earth and Sun are correctly positioned for the flight. <\/p>\n<p class=\"c-article-body__text text-pr-5\">The April launch window runs from April 1 through April 6. If the rocket is not ready to lift off by then, the launch will slide to the next window, which opens on April 30.<\/p>\n<p class=\"c-article-body__text text-pr-5\">But the larger ripples from Friday\u2019s briefing will undoubtedly be from the \u201ccourse correction\u201d to the Artemis program, which critics have said is moving too slowly and calls for too many untested leaps from one mission to the next. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Mr. Isaacman, who stepped into his role leading NASA in December, said that contractors and government officials had been briefed on the changes to the program ahead of Friday\u2019s announcement.<\/p>\n","protected":false},"excerpt":{"rendered":"Open this photo in gallery: NASA&#8217;s Artemis II SLS moon rocket with the Orion spacecraft rolls back toward&hellip;\n","protected":false},"author":2,"featured_media":503599,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[49,48,66],"class_list":["post-503598","post","type-post","status-publish","format-standard","has-post-thumbnail","category-science","tag-ca","tag-canada","tag-science"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/503598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=503598"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/503598\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/503599"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=503598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=503598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=503598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}