{"id":510047,"date":"2026-03-02T19:51:11","date_gmt":"2026-03-02T19:51:11","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/510047\/"},"modified":"2026-03-02T19:51:11","modified_gmt":"2026-03-02T19:51:11","slug":"major-milestone-hit-at-a-new-calgary-theatre-under-construction","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/510047\/","title":{"rendered":"Major milestone hit at a new Calgary theatre under construction"},"content":{"rendered":"<p>Calgary\u2019s art scene is getting one step closer to a major upgrade, with vertical construction now underway on the Werklund Centre.<\/p>\n<p>Crews have begun building the 1,000-seat Osten-Victor Playhouse, which is part of the 170,000 sq. ft. Werklund Centre Transformation that will add two new theatres to the downtown performing arts complex.<\/p>\n<p><img alt=\"Werklund Centre\" title=\"\" loading=\"lazy\" width=\"2048\" height=\"1365\" decoding=\"async\" data-nimg=\"1\" class=\"wp-image-2248337 size-full\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/03\/MixCollage-02-Mar-2026-10-32-AM-4762.jpg\"\/><\/p>\n<p id=\"caption-attachment-2248337\" class=\"wp-caption-text\">Calgary Municipal Land Corporation<\/p>\n<p>The expansion will also include a 200-seat studio theatre, both designed using specialized \u201cbox-within-a-box\u201d construction to limit noise and vibration from the surrounding downtown and nearby CTrain.\u00a0<\/p>\n<p>\u201cThe state-of-the-art experience Calgarians will have inside the Osten-Victor Playhouse is made possible by the careful construction of its exterior shell, designed to shield the theatre from the noise and vibration of the bustling city that surrounds it,\u201d said Alex Sarian, president and CEO of Werklund Centre, in a release.\u00a0<\/p>\n<p>The Werklund Centre Transformation, alongside the Olympic Plaza Transformation are part of a broader effort to revitalize Calgary\u2019s downtown core. Both are anticipated to be completed in 2028. The project is being delivered in partnership with the Calgary Municipal Land Corporation (CMLC).<\/p>\n<p><img alt=\"Werklund Centre\" title=\"\" loading=\"lazy\" width=\"2048\" height=\"1365\" decoding=\"async\" data-nimg=\"1\" class=\"wp-image-2248338 size-full\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/03\/MixCollage-02-Mar-2026-10-33-AM-2663.jpg\"\/><\/p>\n<p id=\"caption-attachment-2248338\" class=\"wp-caption-text\">Calgary Municipal Land Corporation<\/p>\n<p>\u201cSince construction began in January 2025, the project team has completed critical foundational work, including site excavation, secant wall construction, building foundations, and elevator shafts,\u201d said Kate Thompson, president &amp; CEO of CMLC.\u00a0<\/p>\n<p>\u201cWith the 1,000-seat theatre box rising to ground level, Calgarians can begin to see the physical form of a project that will have a lasting impact on our downtown and the city\u2019s cultural landscape.\u201d<\/p>\n<p>The second phase of the Werklund Centre Transformation, which includes the modernization of the existing Werklund Centre, is currently in the design phase and expected to start construction once funding is secured.<\/p>\n<p>You can learn more about <a href=\"https:\/\/www.calgarymlc.ca\/projects\/werklund-centre-transformation\" target=\"_blank\" rel=\"nofollow noopener\">the project online<\/a>.\u00a0<\/p>\n<p>The Werklund Centre Transformation isn\u2019t the only project the CMLC has on the go. It recently announced <a href=\"https:\/\/dailyhive.com\/calgary\/calgary-east-village-developments\" target=\"_blank\" rel=\"nofollow noopener\">big plans for Calgary\u2019s East Village<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"Calgary\u2019s art scene is getting one step closer to a major upgrade, with vertical construction now underway on&hellip;\n","protected":false},"author":2,"featured_media":510048,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194293],"tags":[49,2798,48],"class_list":{"0":"post-510047","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-calgary","8":"tag-ca","9":"tag-calgary","10":"tag-canada"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/510047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=510047"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/510047\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/510048"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=510047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=510047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=510047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}