{"id":532555,"date":"2026-03-13T00:35:07","date_gmt":"2026-03-13T00:35:07","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/532555\/"},"modified":"2026-03-13T00:35:07","modified_gmt":"2026-03-13T00:35:07","slug":"nasa-declares-artemis-ii-ready-for-flight","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/532555\/","title":{"rendered":"NASA declares Artemis II ready for flight"},"content":{"rendered":"<p><a style=\"display:block\" href=\"https:\/\/www.theglobeandmail.com\/resizer\/v2\/ZT6IEYA46FC2DHJ2GSOTARCOCU.jpg?auth=a0d2399a93ed1c244adcdfdbdd67d02a91fdec1ff1e44c09fac9d3e3c27e0855&amp;width=600&amp;height=400&amp;quality=80&amp;smart=true\" aria-haspopup=\"true\" data-photo-viewer-index=\"0\" rel=\"nofollow noopener\" target=\"_blank\">Open this photo in gallery:<\/a><\/p>\n<p class=\"figcap-text\">NASA&#8217;s Artemis II rocket with the Orion spacecraft slowly rolls back towards the Vehicle Assembly Building at the Kennedy Space Center, in Cape Canaveral, Fla., on Feb. 25.John Raoux\/The Associated Press<\/p>\n<p class=\"c-article-body__text text-pr-5\">Artemis II is heading back to the launch pad in an effort to make a historic flight around the moon in early April, the U.S. space agency <a href=\"https:\/\/www.theglobeandmail.com\/topics\/nasa\/\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.theglobeandmail.com\/topics\/nasa\/\">NASA<\/a> said Thursday.<\/p>\n<p class=\"c-article-body__text text-pr-5\">During a news briefing at the Kennedy Space Center, mission managers said the giant SLS rocket designed to send a four-person crew on a translunar voyage could be rolled into position for launch as early as March 19, providing all final preparations are completed by then.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Currently, the next available window for a launch runs from April 1 through 6. <\/p>\n<p class=\"c-article-body__text text-pr-5\">The SLS is currently inside the Space Center\u2019s massive Vehicle Assembly Building, where it has been undergoing repairs for the past two weeks after an earlier, unsuccessful push to launch.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The decision to proceed with an April launch attempt comes after a two-day flight readiness review, during which engineering teams involved in all aspects of the mission weighed in on questions of safety and on prospects for success.<\/p>\n<p class=\"c-article-body__text mv-16 l-inset text-pb-8\" data-sophi-feature=\"interstitial\"><a href=\"https:\/\/www.theglobeandmail.com\/world\/article-nasa-moon-rocket-astronauts\/\" rel=\"nofollow noopener\" target=\"_blank\">NASA to repair Artemis II rocket after system malfunction<\/a><\/p>\n<p class=\"c-article-body__text text-pr-5\">The Artemis II crew \u2013 commander Reid Wiseman, pilot Victor Glover, mission specialist Christina Koch and Canadian astronaut Jeremy Hansen \u2013 also participated in the review online, said Lori Glaze, acting associate administrator for NASA\u2019s Exploration Systems Development Mission Directorate.<\/p>\n<p class=\"c-article-body__text text-pr-5\">\u201cHaving them join us in this review really reinforced the importance of having open, honest discussions about our path forward and about the risks that we\u2019re asking them to take,\u201d Dr. Glaze said.<\/p>\n<p class=\"c-article-body__text text-pr-5\">She added that at the conclusion of the flight readiness review \u201call the teams polled \u2018Go\u2019 to launch and fly Artemis II around the moon.\u201d <\/p>\n<p class=\"c-article-body__text text-pr-5\">Based on the current schedule, the crew will enter a prelaunch quarantine on March 18, two weeks ahead of the earliest possible flight.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Artemis II is the second mission in NASA\u2019s revived lunar program, but it will mark only the first attempt to launch the SLS, topped with the Orion crew capsule, with astronauts on board.<\/p>\n<p class=\"c-article-body__text mv-16 l-inset text-pb-8\" data-sophi-feature=\"interstitial\"><a href=\"https:\/\/www.theglobeandmail.com\/canada\/science\/article-nasa-artemis-ii-march-launch-tests-crewed-flight-moon\/\" rel=\"nofollow noopener\" target=\"_blank\">NASA looks to March launch for Artemis II after successful test<\/a><\/p>\n<p class=\"c-article-body__text text-pr-5\">Its predecessor, Artemis I, was an uncrewed 16-day lunar flight that took place in late 2022. The long gap since then \u2013 and the lack of experience with the mission hardware that this implies \u2013 has been cited as one reason why engineers have found it difficult to anticipate and eliminate technical problems with the rocket while it is on the launch pad.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Several factors are at play in determining when Artemis II will launch, including the relative positions of the Earth and the moon in relation to the sun\u2019s illumination, which is needed to power systems on the crew capsule.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Mission planners have determined that the required conditions can be met during a five- or six-day window each lunar cycle.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The SLS was first rolled out in mid-January ahead of a launch window that opened on Feb. 6. That flight opportunity was abandoned after a hydrogen leak emerged while the rocket was being fuelled as part of a dress rehearsal. Repairs were conducted on the launch pad and a second, more successful dress rehearsal took place on Feb. 19. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Less than 48 hours later, engineers detected a problem with helium flow in the rocket\u2019s upper stage. It was soon apparent that the SLS would need to be rolled back for more extensive repairs. This took the March launch window off the table.<\/p>\n<p class=\"c-article-body__text text-pr-5\">At the same time, NASA announced changes to its lunar program that related to the missions that are in still being planned for after Artemis II. <\/p>\n<p class=\"c-article-body__text mv-16 l-inset text-pb-8\" data-sophi-feature=\"interstitial\"><a href=\"https:\/\/www.theglobeandmail.com\/canada\/science\/article-nasa-lunar-program-artemis-ii\/\" rel=\"nofollow noopener\" target=\"_blank\">NASA moves to revamp lunar program as Artemis II undergoes repairs<\/a><\/p>\n<p class=\"c-article-body__text text-pr-5\">That includes making Artemis III a docking test in Earth orbit next year, instead of an attempted lunar landing, as originally planned.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Under the new program architecture, the landings will begin with Artemis IV, currently scheduled to fly in 2028.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Artemis II is the first mission in more than 50 years that is planned to take astronauts further than about 400 kilometres above Earth\u2019s surface \u2013 the orbiting altitude of the International Space Station.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Canada is one of several countries participating in the NASA-led program, with a contribution that includes Canadarm III, a robotic arm that is being developed for an orbiting lunar station called Gateway.<\/p>\n<p class=\"c-article-body__text mv-16 l-inset text-pb-8\" data-sophi-feature=\"interstitial\"><a href=\"https:\/\/www.theglobeandmail.com\/world\/article-nasa-artemis-moon-space-astronauts\/\" rel=\"nofollow noopener\" target=\"_blank\">NASA\u2019s Artemis rocket suffers fuel leak during practice countdown<\/a><\/p>\n<p class=\"c-article-body__text text-pr-5\">In response to a question about the status of Gateway, which is not mentioned in the revised architecture, Dr. Glaze said the announced changes to the Artemis program were in relation to transportation to the moon in the near term.<\/p>\n<p class=\"c-article-body__text text-pr-5\">\u201cThere\u2019s nothing in there that says anything about what is anticipated for any other parts of our program,\u201d she said.<\/p>\n<p class=\"c-article-body__text text-pr-5\">John Honeycutt, who chairs the Artemis II mission management team, raised eyebrows when he stated that, based on historic examples, the chance that something on the mission might not go according to plan was closer to 1 in 2 (50 per cent) than to 1 in 50 (2 per cent). <\/p>\n<p class=\"c-article-body__text text-pr-5\">He later stressed that \u201cI don\u2019t want people to take that as just being that we should be scared to go fly, because we\u2019re not scared to go fly. We do an outstanding job of understanding the risk, buying down the risk, mitigating the risk and putting together controls to manage the risk.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"Open this photo in gallery: NASA&#8217;s Artemis II rocket with the Orion spacecraft slowly rolls back towards the&hellip;\n","protected":false},"author":2,"featured_media":532556,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[49,48,66],"class_list":["post-532555","post","type-post","status-publish","format-standard","has-post-thumbnail","category-science","tag-ca","tag-canada","tag-science"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/532555","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=532555"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/532555\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/532556"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=532555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=532555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=532555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}