{"id":533342,"date":"2026-03-13T08:50:20","date_gmt":"2026-03-13T08:50:20","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/533342\/"},"modified":"2026-03-13T08:50:20","modified_gmt":"2026-03-13T08:50:20","slug":"oc-transpo-aiming-to-launch-lrt-east-extension-before-july","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/533342\/","title":{"rendered":"OC Transpo aiming to launch LRT east extension before July"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.cbc.ca\/a\/assets\/texttospeech.svg\" alt=\"Text to Speech Icon\" width=\"44\" height=\"44\"\/><\/p>\n<p>Listen to this article<\/p>\n<p>Estimated 4 minutes<\/p>\n<p>The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.<\/p>\n<p>The head of OC Transpo says the LRT\u2019s new link to Orl\u00e9ans is expected to open by the end of June as work on a plan to get more train cars on the rails shows promise.<\/p>\n<p>Interim general manager Troy Charter told members of council\u2019s transit committee on Thursday that &#8220;we still believe that we are on track for Q2 public service launch of the east extension.&#8221;  <\/p>\n<p><a href=\"https:\/\/www.cbc.ca\/news\/canada\/ottawa\/lrt-line-1-east-ottawa-schedule-open-9.7115903\" target=\"_blank\" rel=\"nofollow noopener\">The project has already passed a key milestone known as &#8220;substantial completion,&#8221;<\/a> but a shortage of train cars had raised questions about whether OC Transpo will be able to move on to a formal three-week testing period known as &#8220;trial running.&#8221;   <\/p>\n<p>&#8220;I think in order for people to have faith that things are going to improve, we need to move beyond the point of having 21 trains available per day,&#8221; said Alta Vista Coun. Marty Carr.<\/p>\n<p>OC Transpo needs 46 train cars to do the testing. But for weeks, <a href=\"https:\/\/www.cbc.ca\/news\/canada\/ottawa\/ottawa-lrt-line1-train-shortage-problem-9.7117551\" target=\"_blank\" rel=\"nofollow noopener\">just 21 available have been available as a stubborn bearing issue keeps most of them out of commission.<\/a><\/p>\n<p><a href=\"https:\/\/www.cbc.ca\/news\/canada\/ottawa\/ottawa-lrt-train-wheel-problem-changes-cuts-9.7063407\" target=\"_blank\" rel=\"nofollow noopener\">Metal has been flaking off inside the component that links the axles to the wheels<\/a>, prompting OC Transpo to live by a simple rule: any train with axles above 100,000 kilometres of mileage is off the rails.<\/p>\n<p>Carr asked OC Transpo about the slow progress on getting more cars into service. Charter said OC Transpo and its contractor are trying to &#8220;manage&#8221; the stockpile of those components, known as cartridge bearing assemblies.<\/p>\n<p>&#8220;It\u2019s not something that is readily available that you can purchase off the shelf,&#8221; he said.<\/p>\n<p>Transit committee chair Glen Gower said it\u2019s frustrating to see so little visible progress, but he said there is &#8220;work happening behind the scenes.&#8221;<\/p>\n<p>&#8220;It\u2019s like the metaphorical duck who on the surface of the water looks pretty calm, not doing much, but underneath those legs are flapping,&#8221; he said.<\/p>\n<p>OC Transpo &#8216;settling on details&#8217; of plan<\/p>\n<p>Chief safety officer Sabrina Pasian gave the committee an update on that behind-the-scenes   work. She pointed to progress on a solution that could allow OC Transpo to loosen or cancel the 100,000-kilometre rule.<\/p>\n<p>&#8220;Our teams have been having very productive technical meetings with RTG, Altsom and their experts,&#8221; said Pasian, referring to the city\u2019s maintenance contractor and the manufacturer of the trains.<\/p>\n<p>&#8220;We are making progress and we are now in the process of settling on details of a revised containment plan.&#8221;<\/p>\n<p>She said the plan could include acoustic and vibration monitoring that can detect bearing issues early, before they cause real problems.<\/p>\n<p>Pasian said her team is working to &#8220;finalize&#8221; technical and safety details, and make sure everything is in place before bringing more cars into service.\u00a0<\/p>\n<p>She said the first priority is restoring regular service on the existing Line 1 between Blair and Tunney\u2019s Pasture stations.<\/p>\n<p>After that, OC Transpo will &#8220;turn our energies to bringing the train fleet up to a sufficient number to proceed with trial running in the east.&#8221;<\/p>\n<p>West extension facing 6-month delay<\/p>\n<p><a href=\"https:\/\/www.cbc.ca\/news\/canada\/ottawa\/council-to-talk-potential-compensation-for-recent-bus-lrt-disruptions-9.7082967\" target=\"_blank\" rel=\"nofollow noopener\">Charter has been adamant that OC Transpo will hold RTG accountable for the service cut<\/a>, which has led to crowding as single car trains quickly fill up at rush hour.<\/p>\n<p>But on Thursday he wouldn\u2019t tell reporters how OC Transpo is doing that, including whether it\u2019s holding back monthly payments that total millions of dollars.<\/p>\n<p>He cited &#8220;potential ongoing dispute litigation,&#8221; but insisted that OC Transpo is doing everything it can under its agreement with RTG.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" alt=\"A man sits behind a name tag.\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/03\/1773391820_591_default.jpg\" style=\"aspect-ratio:1.8203883495145632\" data-cy=\"image-img\"\/>Troy Charter, now OC Transpo&#8217;s interim general manager, attends a transit committee meeting on June 29, 2023. (Jean Delisle\/CBC)<\/p>\n<p>OC Transpo also gave an update on construction of the west extension to Algonquin and Moodie stations, with rail construction director Richard Holder revealing that there has been &#8220;slippage&#8221; in the schedule.<\/p>\n<p>Contractor East-West Connectors is now expected to hand over the system to the city in the second quarter of next year, with preparations for opening beginning after June.<\/p>\n<p>That\u2019s about six months later than what was reported during the previous update in September.<\/p>\n<p>Kitchissippi Coun. Jeff Leiper worried that new apartment buildings housing hundreds of residents are opening all along the western route \u2014 and now they&#8217;ll have to wait for service.<\/p>\n<p>&#8220;Those apartments are not sustainable if we don&#8217;t have LRT within close proximity, and every time we lose a quarter, it seems as though another building is getting its occupancy,&#8221; he said.<\/p>\n<p>&#8220;It&#8217;s having real-world implications on the congestion.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"Listen to this article Estimated 4 minutes The audio version of this article is generated by AI-based technology.&hellip;\n","protected":false},"author":2,"featured_media":533343,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194295],"tags":[49,48,20739],"class_list":["post-533342","post","type-post","status-publish","format-standard","has-post-thumbnail","category-ottawa","tag-ca","tag-canada","tag-ottawa"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/533342","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=533342"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/533342\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/533343"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=533342"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=533342"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=533342"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}