{"id":561079,"date":"2026-03-26T02:21:10","date_gmt":"2026-03-26T02:21:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/561079\/"},"modified":"2026-03-26T02:21:10","modified_gmt":"2026-03-26T02:21:10","slug":"18-dalhousie-resubmitted-at-61-storeys-following-flight-path-changes","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/561079\/","title":{"rendered":"18 Dalhousie Resubmitted at 61 Storeys Following Flight Path Changes"},"content":{"rendered":"<p><a href=\"https:\/\/urbantoronto.ca\/news\/development\" rel=\"nofollow noopener\" target=\"_blank\">DEVELOPMENT<\/a>\u00a0<a href=\"https:\/\/urbantoronto.ca\/news\/!\/planning\" rel=\"nofollow noopener\" target=\"_blank\">PLANNING<\/a><br \/>March 25, 2026 by Anthony Teles\u00a0\u00a0<img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/03\/1774412289_657_views.png\"\/>\u00a0851\u00a0<\/p>\n<p>18 Dalhousie Resubmitted at 61 Storeys Following Flight Path Changes<\/p>\n<p>Following UrbanToronto\u2019s construction update on <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/queenchurch.31016\" rel=\"nofollow noopener\" target=\"_blank\">QueenChurch<\/a>, our attention now steps next door to <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/18-dalhousie.32845\" rel=\"nofollow noopener\" target=\"_blank\">18 Dalhousie Street<\/a>, where <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/pemberton-group.7790\" rel=\"nofollow noopener\" target=\"_blank\">Pemberton Group<\/a> has submitted a revised development proposal in Toronto\u2019s Garden District, Replacing a previously approved 54-storey scheme, it is now proposed as a 61-storey mixed-use residential tower. Designed by <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/graziani-corazza-architects.7998\" rel=\"nofollow noopener\" target=\"_blank\">Graziani + Corazza Architects<\/a>, the increase in height responds to updated St Michael\u2019s Hospital flight path restrictions introduced through a 2024 Ministerial Zoning Order (MZO), which rendered the earlier approval unbuildable.\u00a0<\/p>\n<p>Looking northeast to 18 Dalhousie, designed by Graziani + Corazza Architects for Pemberton Group<\/p>\n<p dir=\"ltr\">The site spans 137 through 149 Church Street and 18 and 20 Dalhousie Street, occupying a through-block parcel on the east side of Church Street between Queen Street East and Shuter Street. The rectangular assembly is currently occupied by a collection of 2- to 3-storey commercial and mixed-use buildings, including heritage-designated properties along Church and Dalhousie streets. The surrounding area is characterized by a mix of older low-rise buildings and a growing concentration of high-rise residential towers. The site is also within walking distance of Queen, TMU, and King subway stations, placing it within multiple Protected Major Transit Station Areas.<\/p>\n<p>Looking northwest to the current site, image retrieved from Google Maps<\/p>\n<p dir=\"ltr\">Planning for the site dates back to <a href=\"https:\/\/urbantoronto.ca\/news\/2018\/06\/pemberton-proposes-49-storey-tower-queen-and-church.32849\" rel=\"nofollow noopener\" target=\"_blank\">2018<\/a>, when an initial Zoning By-law Amendment application proposed a 49-storey mixed-use tower, later revised to 54 storeys. After an appeal to the Ontario Land Tribunal, a settlement was reached in 2022, resulting in approval for the <a href=\"https:\/\/urbantoronto.ca\/news\/2020\/05\/new-design-increased-height-revealed-latest-plans-18-dalhousie.42323\" rel=\"nofollow noopener\" target=\"_blank\">54-storey building<\/a> carved to accommodate the St Michael\u2019s Hospital helicopter flight path.\u00a0<\/p>\n<p>Previous design by Graziani + Corazza Architects for Pemberton Group<\/p>\n<p dir=\"ltr\">That approval was then undermined by a 2024 MZO, which expanded the protected air ambulance flight path and introduced new height restrictions. In response, the project team worked with City staff to reshape the proposal. <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" rel=\"nofollow noopener\" target=\"_blank\">Bousfields<\/a> submitted the resulting updated Zoning By-law Amendment application to the City of Toronto on behalf of the developer.<\/p>\n<p>Area of approved building that projected into expanded flight path area, image via submission to the City of Toronto<\/p>\n<p dir=\"ltr\">The revised proposal would now redevelop the site with a 61-storey mixed-use tower rising to 200.95m, an increase from the previously approved 54-storey, 175m scheme. While the Gross Floor Area remains unchanged at 32,500m\u00b2 (with a Floor Space Index of 21.04 times coverage of the site), including 32,100m\u00b2 of residential space and 280m\u00b2 of retail at grade, the additional height allows the massing to be redistributed.\u00a0<\/p>\n<p>Looking southeast to the podium, designed by Graziani + Corazza Architects for Pemberton Group<\/p>\n<p dir=\"ltr\">The new design introduces a 2-storey street-wall and a 6-storey podium along the southern portion of the site, replacing the earlier 3-storey street-wall and 8-storey podium. Above, a pronounced step-back introduced at the 24th floor would clear the revised St Michael\u2019s Hospital flight path, which now extends across the northern portion of the site.<\/p>\n<p>Looking southwest to 18 Dalhousie, designed by Graziani + Corazza Architects for Pemberton Group<\/p>\n<p dir=\"ltr\">The redesign features a reduced and more efficient upper floor-plate of approximately 467m\u00b2, while the lower tower levels would maintain a floor-plate of about 713m\u00b2. The unit count has increased from 440 to 469 suites. Setbacks have also been adjusted, resulting in a 16.5m spacing to QueenChurch rising immediately south, less than normal separation guidelines, but 5m wider than an earlier proposal to move the 54-storey version out of the way of the expanded flight path.<\/p>\n<p>Site plan, designed by Graziani + Corazza Architects for Pemberton Group<\/p>\n<p dir=\"ltr\">The heritage-designated buildings at 24 Dalhousie Street and along Church Street would be incorporated into the base. The revised design maintains the approved conservation strategy overseen by <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/gbca-architects.7997\" rel=\"nofollow noopener\" target=\"_blank\">GBCA Architects<\/a>. Amenity space would include approximately 900m\u00b2 of indoor and 775m\u00b2 of outdoor amenities, the latter reduced from 939m\u00b2.<\/p>\n<p dir=\"ltr\">Below grade, three levels of underground parking are proposed. Vehicular parking has been significantly reduced from 120 spaces in the prior approval to 52 residential spaces. Bicycle parking increases to 469 spaces, including 422 long-term and 47 short-term spots, compared to 440 previously. The building would be served by four elevators, equating to roughly one elevator per 117 units, indicating high-speed motors would be required for adequate response times.<\/p>\n<p>Ground floor plan, designed by Graziani + Corazza Architects for Pemberton Group<\/p>\n<p dir=\"ltr\">The site is within approximately 300m of Queen station on Yonge Line 1, a future <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-queen-station.47569\" rel=\"nofollow noopener\" target=\"_blank\">interchange<\/a> with the under-construction <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-3.47842\" rel=\"nofollow noopener\" target=\"_blank\">Ontario Line 3<\/a>, as well as about 450m from TMU station, and roughly 500m from King station. Surface transit is readily available along Queen Street East, with frequent streetcar and bus service.\u00a0<\/p>\n<p dir=\"ltr\">To the south, the 57-storey QueenChurch is under construction, with a 59-storey tower proposed at <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/119-127-church-street.49182\" rel=\"nofollow noopener\" target=\"_blank\">119\u2013127 Church Street<\/a> nearby, and the 48-storey <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/alias.29459\" rel=\"nofollow noopener\" target=\"_blank\">Alias<\/a> rising further along the corridor. To the northwest, <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/metropolitan.16846\" rel=\"nofollow noopener\" target=\"_blank\">The Metropolitan<\/a> is planned at 37 storeys. To the southeast, construction is advancing on the 34-storey <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/queen-central.35319\" rel=\"nofollow noopener\" target=\"_blank\">Queen Central<\/a>, while additional proposals include a 40-storey building at <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/133-queen-east.34048\" rel=\"nofollow noopener\" target=\"_blank\">133 Queen Street East<\/a> and a 72-storey tower at <a href=\"https:\/\/urbantoronto.ca\/database\/projects\/100-lombard.49079\" rel=\"nofollow noopener\" target=\"_blank\">100 Lombard Street<\/a>.\u00a0<\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a href=\"https:\/\/urbantoronto.ca\/Pro\/\" rel=\"nofollow noopener\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a href=\"https:\/\/urbantoronto.ca\/reports\/\" rel=\"nofollow noopener\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a href=\"https:\/\/urbantoronto.ca\/NDI\/\" rel=\"nofollow noopener\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/03\/1774412289_688_more-content.png\" onclick=\"loadArticles();\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"DEVELOPMENT\u00a0PLANNINGMarch 25, 2026 by Anthony Teles\u00a0\u00a0\u00a0851\u00a0 18 Dalhousie Resubmitted at 61 Storeys Following Flight Path Changes Following UrbanToronto\u2019s&hellip;\n","protected":false},"author":2,"featured_media":561080,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[76,354,355,49,48,356,75],"class_list":["post-561079","post","type-post","status-publish","format-standard","has-post-thumbnail","category-arts-and-design","tag-arts","tag-arts-and-design","tag-artsanddesign","tag-ca","tag-canada","tag-design","tag-entertainment"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/561079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=561079"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/561079\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/561080"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=561079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=561079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=561079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}