{"id":780981,"date":"2026-07-05T02:53:47","date_gmt":"2026-07-05T02:53:47","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/780981\/"},"modified":"2026-07-05T02:53:47","modified_gmt":"2026-07-05T02:53:47","slug":"what-if-thousands-of-unused-dams-in-canada-could-generate-clean-power-again","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/780981\/","title":{"rendered":"What if thousands of unused dams in Canada could generate clean power again?"},"content":{"rendered":"<p>Aslan Renewables\u2019 riverside turbines-in-a-box are designed to feed hydro to local grids in real time<\/p>\n<p>Reprinted with permission from <a href=\"https:\/\/begiant.ca\/\" rel=\"noopener noopener noopener nofollow\" target=\"_blank\">Be Giant<\/a>, a non-profit, non-partisan media outlet reporting on the people, places, ideas and breakthroughs shaping Canada&#8217;s future. Sign up for their weekly <a href=\"https:\/\/www.begiant.ca\/newsletter\" rel=\"noopener noopener noopener nofollow\" target=\"_blank\">newsletter<\/a>.<\/p>\n<p>In the early days of the pandemic, Andrew Murray was at a crossroads. He had just sold his first company, a software venture he had launched a few years earlier on the heels of his undergrad degree at Dalhousie University. He was locked down in his apartment in Charlottetown, P.E.I., trying to keep active. So he would go for walks along Confederation Trail, a path that meanders across the island along decommissioned railway tracks.<\/p>\n<p>Many days, he\u2019d pass small dams, one after another. He could almost pace off the miles by them. Then he realized that these were the old sawmills and gristmills that had formed the backbone of some of the nation\u2019s pioneering small industries and that whole communities had settled around them. He\u2019d long been interested in renewable energy, so two questions started niggling at him. First: How many dams were there? Second: Could he bring them back to life as hyperlocal sources of clean electricity?<\/p>\n<p>\u201cThat\u2019s a hidden layer of energy that is deeply Canadian and plays a massive part in our history and could in our future, right?\u201d he says over a cortado at a coffee shop and wine bar in Toronto, where he moved in 2025. Harnessing it became, as he puts it, \u201can incredible mission.\u201d<\/p>\n<p>If this sounds romantic, it is. (\u201cPlease don\u2019t use that word!\u201d Murray says after using it to describe the idea.) To him, this isn\u2019t just a climate play aimed at stripping carbon emissions from energy production by replacing local diesel-fired electricity with hydro. His deeper goals are both to increase access to energy for people who live in small communities and to do it in a way that doesn\u2019t alienate locals the way big dam projects and nuclear reactors do.<\/p>\n<p><a href=\"https:\/\/aslanrenewables.com\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Aslan Renewables<\/a> is the company he formed in 2021 to carry the idea forward. It\u2019s named after the Christ-like lion in C.S. Lewis\u2019s Chronicles of Narnia and is a nod to the business\u2019s resurrectionist values.<\/p>\n<p>It took a few years just to nail down the fundamentals. Murray enlisted the help of professors and students, mainly from the University of Prince Edward Island, along with local historians and families, to scour public records and piece together the story of the forgotten dams. A postwar federal initiative through the 1950s and 1960s spurred a grand decommissioning of dams across the nation, making way for provincial utilities such as Hydro-Qu\u00e9bec and NB Power. But because the little local dams had reshaped rivers and spawned communities around them, they had to stay put to prevent flooding. That meant taxpayers were paying for their upkeep, a perpetual expense with no return.<\/p>\n<p><img decoding=\"async\" alt=\"step_2\" id=\"file-4443002\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/step_2.png;w=960.png\"\/>&#13;<br \/>\nAslan&#8217;s compact turbine modules can be installed in one to two days, and use the existing drop in elevation. The tube\u2019s water propels the turbine, producing electricity. (Supplied by Aslan Renewables)&#13;<\/p>\n<p>That was a surprise. More astonishing still was the sheer number of unused dams: 63,000 across Canada. Murray did the math. With the right modern turbine technology, he could count on being able to capture a megawatt of power at each one of them, feeding electricity straight into the grid. Small beer for one dam. But do it with 63,000 and that\u2019s a lot of electrons.<\/p>\n<p>And that, in turn, led Aslan to develop what he calls an Ikea-like prefab power plant \u2013 a box that contains as many as 10 modular hydro turbines inspired by a solar panel\u2019s ease of use: small, self-contained, no customization, no pouring of concrete. It doesn\u2019t even have to be submerged in the river; the power plant sits on the bank, so as not to interfere with aquatic life, siphoning off maybe 10 per cent of the river\u2019s flow through a tube. You drop it on the ground, bolt it up and that\u2019s that. The water that enters the tube, in turn, propels the turbine, producing electricity that feeds into the local electrical distribution line, delivering power to the grid in real time. There\u2019s no need for staff or management. Permits from community, provincial and federal authorities take five to eight weeks on average in any province. Embedded sensors in the unit track river health and disseminate the information in real time through DataStream, a national open-source platform for sharing Canadian freshwater information.<\/p>\n<p>Murray pulls out his phone to show me an Aslan generator being delivered in December 2025 as part of a pilot project in Scales Pond near Kinkora, P.E.I., one of two generators currently in place in Canada. (The other is in Kingston, Ont.) In the photo, the white steel unit, about the size of a shipping container, is being winched off a flatbed truck and is about to be plopped in place in the snow. This model has been designed to fit any of the 63,000 sites. In fact, the Scales Pond generator is scheduled to be moved to Charlottetown later this summer, where Aslan will work with UPEI students and trade schools as they build a curriculum on decentralized hydro projects.<\/p>\n<p><img decoding=\"async\" alt=\"img_6604-scaled\" id=\"file-4443000\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/img_6604-scaled.jpg;w=960.jpeg\"\/>&#13;<br \/>\nAslan&#8217;s delivery of its unit to the Scales Pond dam. (Supplied by Aslan Renewables)&#13;<\/p>\n<p>That modularity is where the <a href=\"https:\/\/www.begiant.ca\/stories?topic=Innovation\" rel=\"nofollow noopener\" target=\"_blank\">innovation<\/a> comes in. Typical hydro projects are tailored to each site, says Paul Norris, president of the <a href=\"https:\/\/owa.ca\/about\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Ontario Waterpower Association<\/a>, a non-profit organization promoting hydro-power projects in the province. Aslan is a member. \u201cInstead of looking at the site and then seeing what you can fit into it, [this is] looking at what you have and seeing where it fits,\u201d he says.<\/p>\n<p>Part of the drive is that jurisdictions across Canada are pivoting to clean electricity to power industry. Ontario, for example, will need 65 per cent more electricity by the middle of the century than it has now, its officials reckon. The province is actively seeking small local generation of all sorts. \u201cEverybody\u2019s talking about the electrification of the broader <a href=\"https:\/\/www.begiant.ca\/stories?topic=Economy\" rel=\"nofollow noopener\" target=\"_blank\">economy<\/a>,\u201d Norris says. \u201cI don\u2019t know of a jurisdiction that is projecting a reduction [in electricity use] going forward.\u201d<\/p>\n<p>And of all the types of renewable energy, hydro power is particularly prized. Unlike <a href=\"https:\/\/www.begiant.ca\/stories\/places\/solar-parking-lots-energy-emissions\" rel=\"nofollow noopener\" target=\"_blank\">solar<\/a> and wind energy, hydro is predictable, capable of running day and night and not subject to weather variations, says Kuljeet Grewal, an associate professor in the faculty of sustainable design engineering at UPEI. Grewal and his students helped Aslan simulate turbine flow dynamics in the early years when the idea was being developed. Although Grewal works in renewable energy, he hadn\u2019t heard about an idea like Aslan\u2019s before for producing electricity. \u201cIt would certainly provide diversity to [local] energy resources in terms of distributed energy, for sure.\u201d<\/p>\n<p><img decoding=\"async\" alt=\"50k_sites_canada\" id=\"file-4443001\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/50k_sites_canada.png;w=960.png\"\/>&#13;<br \/>\nThere are 63,000 unused dams in Canada.&#13;<\/p>\n<p><a href=\"https:\/\/www.sussexstrategy.com\/people\/mike-holland\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Mike Holland <\/a>sees it as innovative too. He was New Brunswick\u2019s energy minister when Murray showed up to make a presentation on Aslan. It stood out for ticking all the province\u2019s boxes: increasing electrification of the power grids, cost effective, no carbon emissions. Holland left office in 2024 but says New Brunswick is still interested in the technology. Now he\u2019s the Atlantic Canada vice-president for the consultancy Sussex Strategy Group, where Aslan is his client, and he\u2019s in talks with the province about installing the generators. \u201cIt meets so many of the objectives that the provincial utility and provincial government are looking to achieve. So here I am a couple of years later, wearing a different hat but having the same conversation,\u201d he says.<\/p>\n<p>That conversation is a little further along in Ontario. Brad McNevin, chief administrative officer of <a href=\"https:\/\/www.quinteconservation.ca\/who-we-are\/governance\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Quinte Conservation<\/a>, plans to present his board of directors with a proposal in September to install a 35-kilowatt Aslan generator on the Moira River in Belleville, an add-on to a hydro plant that\u2019s already there. He is considering another 20 or so possible sites in his area and would like to see the idea spread to other conservation authorities in the province. \u201cWe know we need energy. We know we need clean energy. This is just making good use of a resource that is essentially travelling down through our rivers,\u201d he says, adding, \u201cIt looks like a really, really amazing opportunity.\u201d<\/p>\n<p>The idea has also garnered some international attention. King Charles\u2019s royal biographer Robert Jobson included a page about Aslan in his 2023 book about causes the king has championed. Last year, Aslan won a <a href=\"https:\/\/temasekfoundation.org.sg\/news\/media-releases\/climate-impact-innovations-challenge-awards-aslan-renewables--arukah-capital--and-sxd-ai-a-total-of-rp10-billion-in-catalytic-funding-to-pilot-their-solutions-in-indonesia\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">global climate-tech-innovation competition<\/a> established by the Singapore-based Temasek Foundation, netting the company more than $300,000 in prize money. The company also raised $1.25 million last year from Canada- and Singapore-based tech startup funds and a few individual Canadian angel investors.<\/p>\n<p>Still, there are barriers to Aslan\u2019s success. Energy is a complex file, requiring co-ordination across multiple government departments, agencies and typically a provincial utility. \u201cI\u2019ll tell you,\u201d Holland says, \u201cfrom an energy perspective, if you have a project that can go from initial presentations to preparations in place to execute first of a kind in a few years, that\u2019s lightning speed.\u201d<\/p>\n<p>Manufacturing has also been a choke point. Murray is committed to a distributed Canadian supply chain, working with building yards and small businesses across the nation. But he\u2019s had to accept turbines from France and Japan because Canadian companies don\u2019t make the small units he needs. If local manufacturers won\u2019t start making them, he will take steps to build a factory, he says. He is even considering opening a mothballed automotive assembly plant to make the generator modules en masse.<\/p>\n<p>And then there are the beavers. This quintessentially Canadian idea, steeped in Canadian history, has a fabled Canadian foe. Beavers like to chew. And they apparently like to chew on the units\u2019 sensors that measure temperature, reservoir level and river health. So Murray\u2019s team figured out how to get the generators to detect the beavers\u2019 advances and emit a tone deep under water to keep them away.<\/p>\n<p>Nevertheless, Murray says he believes that by the end of 2027, Aslan will be able to manufacture and supply the Canadian market with hundreds of mini hydro turbines. One thing is sure: demand has skyrocketed, especially as Canadians have become more worried about energy security over the past year. \u201cAll of a sudden, municipalities, private landowners, farmers, provincial governments and utilities across the country started engaging with Aslan in a way that they hadn\u2019t before,\u201d Murray says. \u201cWe\u2019re desperate to move forward.\u201d<\/p>\n<p>Alanna Mitchell is an award-winning journalist, author and playwright who specializes in writing about science. She has written for the New York Times, the Globe and Mail, Maclean\u2019s, Canadian Geographic, National Geographic and the\u00a0Walrus, among others. She is based in Toronto.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"\" height=\"1\" id=\"\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/repost-pixel.gif\" style=\"display:none\" width=\"1\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"Aslan Renewables\u2019 riverside turbines-in-a-box are designed to feed hydro to local grids in real time Reprinted with permission&hellip;\n","protected":false},"author":2,"featured_media":780982,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[45,49,48,276482],"class_list":["post-780981","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-business","tag-ca","tag-canada","tag-damsbe-giantclean-power"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/780981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=780981"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/780981\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/780982"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=780981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=780981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=780981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}