{"id":811813,"date":"2026-07-19T08:38:42","date_gmt":"2026-07-19T08:38:42","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/811813\/"},"modified":"2026-07-19T08:38:42","modified_gmt":"2026-07-19T08:38:42","slug":"federal-plan-to-expand-port-of-vancouvers-terminals-railways-and-trade-capacity-daily-hive","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/811813\/","title":{"rendered":"Federal plan to expand Port of Vancouver&#8217;s terminals, railways, and trade capacity | Daily Hive"},"content":{"rendered":"<p>The Government of Canada is launching a broad strategy aimed at expanding the Port of Vancouver, serving to ease long-standing transportation bottlenecks and giving Canadian exporters more capacity to reach overseas markets.<\/p>\n<p>Federal Transport Minister Steven MacKinnon announced this week the Port of Vancouver Gateway Strategy has been referred to Prime Minister Mark Carney\u2019s new Major Projects Office, which helps coordinate and accelerate major infrastructure proposals considered important to the national economy.<\/p>\n<p>The strategy covers more than a single construction project. It brings together plans for the <a href=\"https:\/\/dailyhive.com\/vancouver\/roberts-bank-terminal-2-vancouver-port-terramarine-contractor\" target=\"_blank\" rel=\"nofollow noopener\">new Roberts Bank Terminal 2 container superport project Delta<\/a>, additional land for bulk-export facilities, rail network improvements, and expanded environmental protection measures. This\u00a0new strategy is intended to treat the port as a connected transportation system rather than advancing individual terminals, railway projects, and environmental programs separately.<\/p>\n<p>The work will support Carney\u2019s goal of doubling Canadian exports to markets outside the United States by 2035, with the Port of Vancouver serving as the country\u2019s main gateway to Asia-Pacific markets.<\/p>\n<p>The Roberts Bank Terminal 2 project will <a href=\"https:\/\/dailyhive.com\/vancouver\/roberts-bank-terminal-2-vancouver-port-terramarine-contractor\" target=\"_blank\" rel=\"nofollow noopener\">add a three-berth container terminal on approximately 320 acres of newly created land through an expansion of the existing causeway<\/a>, which\u00a0is home to the existing GCT Deltaport container terminal.<\/p>\n<p>This new additional container superport will increase the Port of Vancouver\u2019s container-handling capacity by approximately 50 per cent. Upon completion in the mid-2030s, it could support more than $100 billion in additional trade capacity annually, contribute over $3 billion to Canada\u2019s economy each year, and sustain approximately 17,000 jobs once operating.<\/p>\n<p>Roberts Bank Terminal 2 is also being referred to the Major Projects Office for possible designation as a project of national interest under the federal Building Canada Act.<\/p>\n<p>With the additional referral of the Port of Vancouver Gateway Strategy, the Major Projects Office now has a list of eight \u201ctransformative strategies\u201d across the country, which also includes the Northwest Critical Conservation Corridor for electrical and mining infrastructure in northwestern British Columbia and southern Yukon and the <a href=\"https:\/\/dailyhive.com\/vancouver\/alto-high-speed-rail-planning-construction-expedited\" target=\"_blank\" rel=\"nofollow noopener\">Alto High-Speed Rail project between Toronto and Quebec City<\/a>.<\/p>\n<p>In total, separately, there are 20 projects across the country referred to the Major Projects Office, with eight being B.C.-located projects. In addition to Roberts Bank Terminal 2, other major B.C. projects already referred to the office include the Red Chris Mine Expansion, the three phases of BC Hydro\u2019s North Coast Transmission Line, LNG Canada Phase 2, Ksi Lisims LNG, and the <a href=\"https:\/\/dailyhive.com\/vancouver\/alberta-bc-west-coast-oil-pipeline-roberts-bank-export-terminal\" target=\"_blank\" rel=\"nofollow noopener\">Alberta government\u2019s proposal to build a new West Coast crude oil pipeline from the Edmonton area to Metro Vancouver<\/a>.<\/p>\n<p>Such a designation would not amount to immediate construction approval. However, it could place the project under a more centralized federal process, coordinating remaining permits and providing greater certainty over regulatory timelines.<\/p>\n<p>Existing condition:<\/p>\n<p><img alt=\"roberts bank deltaport existing\" title=\"\" loading=\"lazy\" width=\"1075\" height=\"647\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-1753245\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/roberts-bank-deltaport-existing.jpg\"\/><\/p>\n<p id=\"caption-attachment-1753245\" class=\"wp-caption-text\">The existing Roberts Bank terminal in Delta. (Google Earth)<\/p>\n<p>Future condition:<\/p>\n<p><img alt=\"Roberts Bank Terminal 2 Delta\" title=\"\" loading=\"lazy\" width=\"1075\" height=\"557\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-1753241\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/Roberts-Bank-Terminal-2-Delta.jpg\"\/><\/p>\n<p id=\"caption-attachment-1753241\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2 in Delta. (Vancouver Fraser Port Authority)<\/p>\n<p><img alt=\"roberts bank terminal 2\" title=\"\" loading=\"lazy\" width=\"1100\" height=\"475\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-2293695\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/roberts-bank-terminal-2-container-delta-tsawassen-vancouver-1.jpg\"\/><\/p>\n<p id=\"caption-attachment-2293695\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2. (Vancouver Fraser Port Authority)<\/p>\n<p><img alt=\"roberts bank terminal 2\" title=\"\" loading=\"lazy\" width=\"1100\" height=\"476\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-2293694\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/roberts-bank-terminal-2-container-delta-tsawassen-vancouver-2.jpg\"\/><\/p>\n<p id=\"caption-attachment-2293694\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2. (Vancouver Fraser Port Authority)<\/p>\n<p>Roberts Bank Terminal 2 completed its federal environmental assessment in <a href=\"https:\/\/dailyhive.com\/vancouver\/roberts-bank-terminal-2-vancouver-delta-approved\" target=\"_blank\" rel=\"nofollow noopener\">2023<\/a> and is now working toward securing its remaining permits ahead of the scheduled start of major construction work in 2028, with early works and site preparation expected to begin in 2027.<\/p>\n<p>Before the federal government decides whether to place the terminal on its list of national-interest projects, the Major Projects Office will consult potentially affected First Nations, including the Tsawwassen First Nation, which has its reserve and treaty lands located near the project location.<\/p>\n<p>In a statement reacting to this week\u2019s announcement, Tsawwassen First Nation highlighted\u00a0 that they previously \u201cconsented\u201d to Roberts Bank Terminal 2, and expect the federal government and port authority to uphold all existing approvals, legally binding conditions, and consultation obligations associated with the project.<\/p>\n<p>\u201cProjects designated as being in the national interest must not come at the expense of treaty rights or existing environmental protections. While the benefits of projects like RBT2 may be shared nationally, the impacts are borne most directly by Tsawwassen First Nation in our territory and on the exercise of our Treaty-protected harvesting rights,\u201d said Tsawwassen First Nation chief Laura Cassidy.<\/p>\n<p>\u201cWe expect meaningful consultation, respect for our Treaty rights, and full implementation of the commitments that have already been made to our Nation.\u201d<\/p>\n<p>Earlier this month, following a year-long bidding process, Vancouver Fraser Port Authority announced the <a href=\"https:\/\/dailyhive.com\/vancouver\/roberts-bank-terminal-2-vancouver-port-terramarine-contractor\" target=\"_blank\" rel=\"nofollow noopener\">selection of the private consortium named TerraMarine as its construction partner for Roberts Bank Terminal 2\u2019s new landmass and wharf structures<\/a>. The port authority and Global Container Terminals \u2014 the operator of GCT Deltaport \u2014 have also signed a <a href=\"https:\/\/dailyhive.com\/vancouver\/roberts-bank-terminal-2-vancouver-fraser-port-authority-gct-partnership\" target=\"_blank\" rel=\"nofollow noopener\">memorandum of understanding to explore a potential development and operating partnership<\/a>.<\/p>\n<p>\u201cAs Canada\u2019s largest port, we know we\u2019re going to play an outsized role in delivering on Prime Minister Carney\u2019s commitment to double exports to markets outside of North America,\u201d said Peter Xotta, president and CEO of the Vancouver Fraser Port Authority, in a statement.<\/p>\n<p>\u201cToday\u2019s announcement will help the Port of Vancouver and our partners get game-changing projects like Roberts Bank Terminal 2 built, and move more of what Canadians make, mine, harvest and grow to more customers around the world.\u201d<\/p>\n<p>The gateway strategy will also examine how more industrial land can be made available for bulk-export terminals.<\/p>\n<p>About 70 per cent of the cargo passing through the Port of Vancouver by weight consists of dry and liquid bulk products, including grain, potash, petroleum products, and canola oil. Federal officials say the region\u2019s shortage of suitable industrial land has made it difficult to build modern terminals, forcing operators to rely on older facilities for longer periods.<\/p>\n<p>Next week, the port authority will launch a bidding process to select an operator for the 40-acre Fraser Wharves terminal property in Richmond. It would be the first major opportunity to establish a new bulk terminal at the port in approximately a decade.<\/p>\n<p>Rail capacity represents another major component of the federal plan.<\/p>\n<p>Most cargo entering or leaving the port is transported by train, but the federal government notes that sections of the railway and supply-chain network are at risk of becoming increasingly congested. Such congestion can delay shipments, raise transportation costs, and make Canadian exports less competitive.<\/p>\n<p>Transport Canada and the Major Projects Office will work with railway companies and other industry organizations on a strategy to expand physical infrastructure and improve how trains and cargo move through the wider port system.<\/p>\n<p><img alt=\"Roberts Bank Terminal 2 Port of Vancouver\" title=\"\" loading=\"lazy\" width=\"1075\" height=\"557\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-1753237\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/1784450319_577_Roberts-Bank-Terminal-2-Port-of-Vancouver-2.jpg\"\/><\/p>\n<p id=\"caption-attachment-1753237\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2 in Delta. (Vancouver Fraser Port Authority)<\/p>\n<p><img alt=\"Roberts Bank Terminal 2 Port of Vancouver\" title=\"\" loading=\"lazy\" width=\"1075\" height=\"553\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-1753235\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/Roberts-Bank-Terminal-2-Port-of-Vancouver-4.jpg\"\/><\/p>\n<p id=\"caption-attachment-1753235\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2 in Delta. (Vancouver Fraser Port Authority)<\/p>\n<p><img alt=\"Roberts Bank Terminal 2 Port of Vancouver\" title=\"\" loading=\"lazy\" width=\"1075\" height=\"556\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-1753234\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/Roberts-Bank-Terminal-2-Port-of-Vancouver-5.jpg\"\/><\/p>\n<p id=\"caption-attachment-1753234\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2 in Delta. (Vancouver Fraser Port Authority)<\/p>\n<p><img alt=\"Roberts Bank Terminal 2 Port of Vancouver\" title=\"\" loading=\"lazy\" width=\"1075\" height=\"552\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-1753233\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/Roberts-Bank-Terminal-2-Port-of-Vancouver-6.jpg\"\/><\/p>\n<p id=\"caption-attachment-1753233\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2 in Delta. (Vancouver Fraser Port Authority)<\/p>\n<p><img alt=\"Roberts Bank Terminal 2 Port of Vancouver\" title=\"\" loading=\"lazy\" width=\"1075\" height=\"555\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-1753232\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/1784450321_493_Roberts-Bank-Terminal-2-Port-of-Vancouver-f.jpg\"\/><\/p>\n<p id=\"caption-attachment-1753232\" class=\"wp-caption-text\">Artistic rendering of Roberts Bank Terminal 2 in Delta. (Vancouver Fraser Port Authority)<\/p>\n<p>Environmental measures form another part of the gateway strategy. The federal government has committed more than $258 million over five years to whale protection programs, including $95 million over five years and $16.5 million annually for measures focused on Southern Resident killer whales. The work is expected to include vessel speed restrictions, fisheries management, underwater noise monitoring, whale detection systems, and the testing of quieter technologies for commercial ships and B.C. Ferries vessels.<\/p>\n<p>The federal government has also set aside $413 million over five years to renew the Pacific Salmon Strategy Initiative, which supports habitat restoration, scientific monitoring, and the recovery of wild salmon populations. These programs are in addition to the federal government\u2019s $3.5-billion Oceans Protection Plan.<\/p>\n<p>\u201cCanada needs modern transportation infrastructure that helps our businesses compete, gets Canadian goods to new markets, and creates good jobs across the country. By investing in our ports and transportation network, we are growing our economy, strengthening our supply chains, while protecting the environment,\u201d said Steven MacKinnon, the federal Minister of Transport.<\/p>\n<p>The Port of Vancouver currently handles approximately $1 billion worth of goods each day and about 40 per cent of Canada\u2019s international merchandise trade outside North America. Its terminals connect Canadian exporters and importers with as many as 170 countries.<\/p>\n<p>In 2025, the port handled a record 170.4 million metric tonnes of cargo, eight per cent more than the previous record set one year earlier.<\/p>\n<p>Port-related activity contributes an estimated $16.3 billion annually to Canada\u2019s GDP and supports more than 132,000 jobs nationwide, including approximately 103,000 in British Columbia.<\/p>\n<p>All of this follows the <a href=\"https:\/\/dailyhive.com\/vancouver\/bc-alberta-canada-new-oil-pipeline-agreement\" target=\"_blank\" rel=\"nofollow noopener\">Canada-British Columbia Cooperative Prosperity Agreement<\/a> announced early this month, which included a broader commitment to improve B.C.\u2019s ports and transportation corridors \u2014 including <a href=\"https:\/\/dailyhive.com\/vancouver\/new-george-massey-tunnel-federal-funding-commitment\" target=\"_blank\" rel=\"nofollow noopener\">up to $3 billion in federal funding for the new replacement George Massey Tunnel project<\/a>, covering up to one-third of the overall project costs \u2014 as Canada seeks to increase trade with countries beyond the United States.<\/p>\n<p>The gateway strategy will also consider <a href=\"https:\/\/dailyhive.com\/vancouver\/alberta-bc-west-coast-oil-pipeline-roberts-bank-export-terminal\" target=\"_blank\" rel=\"nofollow noopener\">Alberta\u2019s proposed West Coast crude oil pipeline<\/a>, which would also terminate at a <a href=\"https:\/\/dailyhive.com\/vancouver\/alberta-bc-west-coast-oil-pipeline-roberts-bank-export-terminal\" target=\"_blank\" rel=\"nofollow noopener\">major new oil storage and export facility at Roberts Bank<\/a> \u2014 potentially double the size of the new container terminal, and also incorporating a brand-new additional causeway for the area. Few details about the potential pipeline route or terminal were included in the announcement, with the proposal remaining subject to further review and consultation.<\/p>\n<p><img alt=\"Roberts Bank Delivery Tank Terminal oil delta tsawwassen\" title=\"\" loading=\"lazy\" width=\"1100\" height=\"718\" decoding=\"async\" data-nimg=\"1\" class=\"size-full wp-image-2290394\" style=\"color:transparent\"   src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/1784450322_295_Roberts-Bank-Delivery-Tank-Terminal-oil-delta-tsawwassen-3.jpg\"\/><\/p>\n<p id=\"caption-attachment-2290394\" class=\"wp-caption-text\">Potential route options for the new Alberta-B.C. West Coast oil pipeline to reach the new Roberts Bank marine terminal, largely following the Trans Mountain corridor. (Government of Alberta)<\/p>\n","protected":false},"excerpt":{"rendered":"The Government of Canada is launching a broad strategy aimed at expanding the Port of Vancouver, serving to&hellip;\n","protected":false},"author":2,"featured_media":811814,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194298],"tags":[49,48,55],"class_list":["post-811813","post","type-post","status-publish","format-standard","has-post-thumbnail","category-vancouver","tag-ca","tag-canada","tag-vancouver"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/811813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=811813"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/811813\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/811814"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=811813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=811813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=811813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}