{"id":815034,"date":"2026-07-20T22:17:13","date_gmt":"2026-07-20T22:17:13","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/815034\/"},"modified":"2026-07-20T22:17:13","modified_gmt":"2026-07-20T22:17:13","slug":"bc-hydro-to-build-vancouver-island-battery-energy-storage-to-boost-power-flexibility","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/815034\/","title":{"rendered":"BC Hydro to build Vancouver Island battery energy storage to boost power flexibility"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">NORTH COWICHAN \u2014 British Columbia&#8217;s Crown utility BC Hydro is launching a procurement process for a large battery energy storage project on Vancouver Island, the first such infrastructure in the province.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Energy Minister Adrian Dix says the project is aimed at having at least 100 megawatts of battery storage capacity, which could store excess energy production during low-demand periods.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">That energy could then be used during peak periods, which Dix says will improve Vancouver Island&#8217;s reliability and flexibility in delivering power to local communities.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">A request for supplier qualifications to find companies capable of working on the project will be issued on July 30.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The province says it will review those, then invite a pool of respondents to take part in a request for proposals for the project later this year.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The facility is expected to be operational by 2030 and will be owned and operated by BC Hydro.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;B.C.&#8217;s first utility-scale battery storage facility will help power the Island and is a key part of BC Hydro&#8217;s powering growth plan to strengthen our electricity system and support the province&#8217;s future growth,&#8221; Dix says in a statement.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">This report by The Canadian Press was first published July 20, 2026.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The Canadian Press<\/p>\n","protected":false},"excerpt":{"rendered":"NORTH COWICHAN \u2014 British Columbia&#8217;s Crown utility BC Hydro is launching a procurement process for a large battery&hellip;\n","protected":false},"author":2,"featured_media":815035,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194298],"tags":[285884,285885,49,48,192943,285886,944,55,36245],"class_list":["post-815034","post","type-post","status-publish","format-standard","has-post-thumbnail","category-vancouver","tag-adrian-dix","tag-bc-hydro","tag-ca","tag-canada","tag-energy-production","tag-procurement-process","tag-the-canadian-press","tag-vancouver","tag-vancouver-island"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/815034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=815034"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/815034\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/815035"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=815034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=815034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=815034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}