{"id":819766,"date":"2026-07-23T00:52:38","date_gmt":"2026-07-23T00:52:38","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/819766\/"},"modified":"2026-07-23T00:52:38","modified_gmt":"2026-07-23T00:52:38","slug":"urbantoronto-tours-topped-off-one-delisle-from-podium-to-crown","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/819766\/","title":{"rendered":"UrbanToronto Tours Topped-Off One Delisle from Podium to Crown"},"content":{"rendered":"<p><a href=\"https:\/\/urbantoronto.ca\/news\/development\" rel=\"nofollow noopener\" target=\"_blank\">DEVELOPMENT<\/a>\u00a0<a href=\"https:\/\/urbantoronto.ca\/news\/!\/construction\" rel=\"nofollow noopener\" target=\"_blank\">CONSTRUCTION<\/a><br \/>July 22, 2026 by Anthony Teles, Michael Fernandes\u00a0\u00a0<img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/views.png\"\/>\u00a0391\u00a0<\/p>\n<p>UrbanToronto Tours Topped-Off One Delisle from Podium to Crown<\/p>\n<p>UrbanToronto was recently invited to tour\u00a0<a href=\"https:\/\/urbantoronto.ca\/database\/projects\/one-delisle.33068\" rel=\"nofollow noopener\" target=\"_blank\">One Delisle<\/a> at Yonge Street and Delisle Avenue in Toronto\u2019s Deer Park neighbourhood. Developed by<a href=\"https:\/\/urbantoronto.ca\/database\/companies\/slate-asset-management.25675\" rel=\"nofollow noopener\" target=\"_blank\">\u00a0Slate Asset Management<\/a>, the 44-storey condominium tower is<a href=\"https:\/\/urbantoronto.ca\/database\/companies\/studio-gang-architects.13991\" rel=\"nofollow noopener\" target=\"_blank\">\u00a0Studio Gang<\/a>\u2019s first Canadian commission, with<a href=\"https:\/\/urbantoronto.ca\/database\/companies\/wzmh-architects.8075\" rel=\"nofollow noopener\" target=\"_blank\">\u00a0WZMH Architects<\/a> serving as Architect of Record. Rotating eight-storey volumetric modules transform its massing from a rectilinear podium into a near-cylindrical crown, creating a spiralling profile as it rises.<\/p>\n<p>A distant view looking south to One Delisle, image by UrbanToronto Forum contributor Johnny Au<\/p>\n<p dir=\"ltr\">UrbanToronto previously provided an update on the site in\u00a0<a href=\"https:\/\/urbantoronto.ca\/news\/2026\/06\/one-delisle-tops-yonge-st-clair.61174\" rel=\"nofollow noopener\" target=\"_blank\">June, 2026<\/a>, when construction had topped off.<\/p>\n<p>Looking east to One Delisle&#8217;s podium and tower, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">The tour begins inside the future ground-floor, a double-height space currently framed by exposed concrete columns and soffits, and crossed by insulated mechanical ductwork. Along the street-facing elevation, black structural framing outlines where the limestone facade of a previous building onsite \u2014 not heritage-designated but with character and value \u2014 will be reconstructed with new punched period-accurate windows in the openings above.<\/p>\n<p>Looking into One Delisle\u2019s future main entrance and reconstructed conservation facade, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">North of the to-be-reconstructed wall along Yonge Street, a glazed curtain wall encloses approximately 6,000 ft\u00b2 of retail frontage. Full-height vision glass and opaque spandrel panels sit in dark aluminum frames between exposed concrete columns. Unfinished concrete ceilings, suspended mechanical services, and temporary lighting rset the scene during the construction period.<\/p>\n<p>Ground-floor retail space and curtain wall installation along Yonge Street, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">Above on the second-level, a narrow section of the residential terrace will provide private outdoor spaces, separate from a shared outdoor amenity area, and connected directly to a spa. The unfinished podium roof&#8217;s waterproofing membrane has been applied, while exposed concrete remains in other areas, while white aluminum cladding and dark glazing bring the tower&#8217;s faceted envelope to the terrace edge.<\/p>\n<p>Private section of the Level 2 residential terrace, looking toward the future spa, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">To the west of the terrace, <a href=\"https:\/\/www.toronto.ca\/city-government\/planning-development\/construction-new-facilities\/park-facility-projects\/new-park-at-15-delisle-avenue\/\" rel=\"nofollow noopener\" target=\"_blank\">a future public park<\/a> remains a construction staging area for the time being, site offices, formwork, bundled materials, access equipment, and a concrete mixer truck amongst the equipment and materials there currently.<\/p>\n<p>Looking west from the second-floor terrace over the future public park site, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">In another corner of the second-floor terrace, robust galvanized structural-steel members that will make up the crown above the penthouses are currently staged. Resting horizontally on temporary plywood protection, the beams feature prefabricated connection plates, ready to be hoisted by crane and assembled atop the tower.<\/p>\n<p>Looking north across structural-steel crown members staged on the second-floor terrace, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">Looking sharply upward makes the modular geometry particularly legible. At four-storey intervals, the floor plate contracts and pivots inward, creating stepped transitions within the larger eight-storey modules, and private terraces at successive levels as the rectilinear base approaches the near-cylindrical crown. White, powder-coated aluminum-clad piers follow the shifting slab edges, framing alternating bands of dark curtain wall and recessed balconies.<\/p>\n<p>The tower\u2019s rotating modules, stepped floor plates, and private terraces, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">Inside, elevator-front installation is underway, with metal entrance frames and doors fitted but covered in protective film and guarded by temporary timber jambs. The opening is set within concrete masonry unit walls \u2014 atypical for a Toronto high-rise condominium, where elevator shafts are more commonly enclosed in cast-in-place concrete.<\/p>\n<p>An elevator entrance installed within the concrete-block shaft enclosure, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">On the fourth floor, a completed model suite demonstrates the interior finish standard with an Italian-manufactured kitchen featuring full-height, flat-panel cabinetry and appliances.<\/p>\n<p>Italian-manufactured kitchen in the Level 4 model suite, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">On an upper residential floor, an exposed demising-wall assembly comprises metal-stud framing packed with mineral-wool insulation. Used between suites instead of a solid concrete shear wall, the layered assembly improves acoustic separation and limits the transfer of odours.<\/p>\n<p>An upper-level suite&#8217;s insulated acoustic demising-wall assembly, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">On the 44th floor, one of One Delisle\u2019s six penthouses spans approximately 3,000 ft\u00b2 directly beneath the crown. Exposed concrete slabs, walls, and perimeter columns currently define its expansive open floor plate, which extends toward broad facade openings and panoramic views.<\/p>\n<p>Level 44 penthouse, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">At the 45th level, the crown\u2019s structural frame is beginning to project beyond the concrete roof slab. Galvanized steel columns and horizontal beams (matching those stored on the level 2 terrace) are being assembled with bolted connections to form a cantilevered perimeter support. Temporary edge protection remains as the skeletal frame extends above the penthouses.<\/p>\n<p>Looking northeast from Level 45 to the steel framing under construction around the crown, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">Inside the crown, closely spaced adjustable steel shoring posts support the concrete slab above during the curing process, while black structural-steel beams span sections of the open floor plate. The exterior self-climbing system allowed construction to advance before the elevator-zone slabs were infilled. The crown has no interior shear walls, leaving an open layout for its mechanical spaces and ongoing fit-out.<\/p>\n<p>Inside the crown looking at shoring beneath the infilled elevator-zone slabs, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">Hook-ended rebar projects from the slab along the footprint of a concrete curb yet to be formed. The raised curb will establish the enclosure base around the boiler and electrical rooms, separating these rooftop service spaces from the exposed slab. Additional galvanized crown-framing members await installation beneath the partially assembled steel superstructure.<\/p>\n<p>Rebar for the future mechanical-room curb, image by Michael Fernandes<\/p>\n<p dir=\"ltr\">One Delisle stands 155m and will house 371 condominium units.<\/p>\n<p>Looking south to One Delisle, designed by Studio Gang Architects and WZMH Architects for Slate Asset Management<\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p dir=\"ltr\">UrbanToronto&#8217;s research and data service,\u00a0<a href=\"https:\/\/urbantoronto.ca\/Pro\/\" rel=\"nofollow noopener\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a href=\"https:\/\/urbantoronto.ca\/reports\/\" rel=\"nofollow noopener\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a href=\"https:\/\/urbantoronto.ca\/NDI\/\" rel=\"nofollow noopener\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p>Related Companies:\u00a0<\/p>\n<p><a href=\"https:\/\/urbantoronto.ca\/database\/companies\/era-architects.7982\" rel=\"nofollow noopener\" target=\"_blank\">ERA Architects<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/grounded-engineering-inc.40682\" rel=\"nofollow noopener\" target=\"_blank\">Grounded Engineering Inc.<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/janet-rosenberg-studio.8158\" rel=\"nofollow noopener\" target=\"_blank\">Janet Rosenberg &amp; Studio<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/jorg-renderings-interactive.56758\" rel=\"nofollow noopener\" target=\"_blank\">JORG &#8211; Renderings &amp; Interactive<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/mgi-construction-corp.35495\" rel=\"nofollow noopener\" target=\"_blank\">MGI Construction Corp.<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/multiplex-construction-canada-ltd.7922\" rel=\"nofollow noopener\" target=\"_blank\">Multiplex Construction Canada Ltd.<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/norris-fire-consulting-inc.46995\" rel=\"nofollow noopener\" target=\"_blank\">Norris Fire Consulting Inc<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/rebar-enterprises-inc.44797\" rel=\"nofollow noopener\" target=\"_blank\">Rebar Enterprises Inc<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/rwdi-climate-and-performance-engineering.43563\" rel=\"nofollow noopener\" target=\"_blank\">RWDI Climate and Performance Engineering<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/urban-strategies-inc.26840\" rel=\"nofollow noopener\" target=\"_blank\">Urban Strategies Inc.<\/a>, <a href=\"https:\/\/urbantoronto.ca\/database\/companies\/wzmh-architects.8075\" rel=\"nofollow noopener\" target=\"_blank\">WZMH Architects<\/a><\/p>\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/07\/more-content.png\" onclick=\"loadArticles();\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"DEVELOPMENT\u00a0CONSTRUCTIONJuly 22, 2026 by Anthony Teles, Michael Fernandes\u00a0\u00a0\u00a0391\u00a0 UrbanToronto Tours Topped-Off One Delisle from Podium to Crown UrbanToronto&hellip;\n","protected":false},"author":2,"featured_media":819767,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[76,354,355,49,48,356,75],"class_list":["post-819766","post","type-post","status-publish","format-standard","has-post-thumbnail","category-arts-and-design","tag-arts","tag-arts-and-design","tag-artsanddesign","tag-ca","tag-canada","tag-design","tag-entertainment"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/819766","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=819766"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/819766\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/819767"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=819766"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=819766"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=819766"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}