{"id":872629,"date":"2026-08-26T22:52:10","date_gmt":"2026-08-26T22:52:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/872629\/"},"modified":"2026-08-26T22:52:10","modified_gmt":"2026-08-26T22:52:10","slug":"five-flood-mitigation-projects-in-surrey-will-improve-citys-resilience-against-high-water-events","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/872629\/","title":{"rendered":"Five flood-mitigation projects in Surrey will improve city\u2019s resilience against high-water events"},"content":{"rendered":"<p>            <a href=\"https:\/\/voiceonline.com\/wp-content\/uploads\/2024\/12\/KELLY-GREENE.jpg\" data-caption=\"Kelly Greene\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"696\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/www.newsbeep.com\/ca\/wp-content\/uploads\/2026\/08\/KELLY-GREENE-696x696.jpg\"   alt=\"\" title=\"KELLY GREENE\"\/><\/a>Kelly Greene            <\/p>\n<p class=\"wp-block-paragraph\">PEOPLE, farms, neighbourhoods and businesses in Surrey will be better protected from periods of high water with the completion of several flood-mitigation projects supported by the Province, the federal government and the City of Surrey.<\/p>\n<p class=\"wp-block-paragraph\">\u201cSurrey is one of the fastest-growing communities in the province, and protecting people from the effects of climate change is essential,\u201d said Kelly Greene, Minister of Emergency Management and Climate Readiness, on Wednesday. \u201cThese projects protect low-lying areas in Surrey and help address future flood risk. I\u2019m grateful for the collaboration between the Province, the federal government and the City of Surrey that made these projects possible.\u201d<\/p>\n<p class=\"wp-block-paragraph\">The Province committed nearly $5 million from the Community Emergency Preparedness Fund (CEPF) to prevent water seepage and undermining of the Fry\u2019s Corner drainage pump station. Additionally, raising and widening the dikes along the Serpentine River and Latimer Creek will safeguard important transportation corridors and agricultural lands, and support protection against a major flooding event. The Fry\u2019s Corner drainage pump station improvements are complete, with the diking upgrades scheduled for summer 2027.<\/p>\n<p class=\"wp-block-paragraph\">\u201cBy strengthening Surrey\u2019s defences against flooding, we are helping to ensure people, homes and businesses are better protected as the risk of high-water events grows,\u201d said Garry Begg, MLA for Surrey-Guildford. \u201cThese investments both improve public safety and provide greater community resilience for years to come.\u201d<\/p>\n<p class=\"wp-block-paragraph\">Other CEPF-funded projects on the Serpentine River include:<\/p>\n<p class=\"wp-block-paragraph\">* Work is underway to improve the 64 Avenue drainage pump station and the drainage resiliency of the central Serpentine River. The Province committed $4 million from the CEPF to implement critical projects and initiatives aimed at reducing flood vulnerability and strengthening the community\u2019s flood resilience. Completion is scheduled for fall 2027.<\/p>\n<p class=\"wp-block-paragraph\">* The Province contributed $5 million from the CEPF to build a new pump station near the 16000 block of 60 Avenue to ensure reliable drainage service during periods of high water on the Serpentine River. Completion is expected in late 2027.<\/p>\n<p class=\"wp-block-paragraph\">Located along the Nicomekl River, another project will result in the replacement of three aging sets of culverts and dike raising, providing better protection to people, farms and businesses in Surrey.<\/p>\n<p class=\"wp-block-paragraph\">Once completed, the project will help protect more than one kilometre of Highway 15 linking to the Pacific Highway border crossing, more than 50 buildings, including homes and barns, more than 400 hectares of agricultural lands, portions of 48 Avenue and 184 Street, and 500 metres of the provincial Roberts Bank Railway corridor.<\/p>\n<p class=\"wp-block-paragraph\">Scheduled for completion in summer 2027, the $1.3-million project is funded through the Green Infrastructure stream of the Investing in Canada Infrastructure Program. The Province provided more than $457,000, the federal government committed more than $548,000 and the City of Surrey contributed more than $365,000.<\/p>\n<p class=\"wp-block-paragraph\">\u201cIn the face of climate change, disaster mitigation measures are more crucial than ever,\u201d said Ernie Klassen, MP for South Surrey-White Rock. \u201cOur government is proud to be a partner of the Nicomekl River dike rehabilitation project, which will increase community resilience and help protect Surrey against flooding risks. We will continue to work with our provincial and municipal partners to improve residents\u2019 safety and build stronger communities.\u201d<\/p>\n<p class=\"wp-block-paragraph\">The now-completed Surrey living dike project received $300,000 from the Province and offers nature-based solutions for coastal flood protection on Mud Bay and Boundary Bay.<\/p>\n<p class=\"wp-block-paragraph\">The living dike provides flood and erosion protection along Surrey\u2019s coastline. A gentle, raised dike slope helps natural salt marshes migrate and re-establish in conjunction with sea-level rise. Various edge treatments, such as brushwood dams, oyster shells and cobbles were installed along the living dike as part of trial plots to determine the most successful method to dissipate waves and lower erosive forces on the dike. More than 50,000 salt-marsh plugs have been planted within the project site to support natural salt marsh progression and establish the living dike.<\/p>\n<p class=\"wp-block-paragraph\">\u201cThese flood-mitigation projects are critical investments in the safety and resilience of our community,\u201d said Surrey Mayor Brenda Locke. \u201cIn recent years, we have seen the growing impacts of extreme-weather events, which have reinforced the need to strengthen Surrey\u2019s flood-control infrastructure. By improving dikes, drainage systems and pump stations, we are protecting residents, homes, farms, businesses and key transportation corridors, while helping ensure our city is prepared for future challenges and remains safe for generations to come.\u201d<\/p>\n<p>\n\tRelated<\/p>\n","protected":false},"excerpt":{"rendered":"Kelly Greene PEOPLE, farms, neighbourhoods and businesses in Surrey will be better protected from periods of high water&hellip;\n","protected":false},"author":2,"featured_media":872630,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194299],"tags":[49,48,87674,4390],"class_list":["post-872629","post","type-post","status-publish","format-standard","has-post-thumbnail","category-surrey","tag-ca","tag-canada","tag-surrey","tag-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/872629","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=872629"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/872629\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/872630"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=872629"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=872629"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=872629"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}