{"id":916798,"date":"2026-10-01T16:56:11","date_gmt":"2026-10-01T16:56:11","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/916798\/"},"modified":"2026-10-01T16:56:11","modified_gmt":"2026-10-01T16:56:11","slug":"toronto-quebec-high-speed-rail-project-could-cost-more-than-ottawas-estimate-pbo-says","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/916798\/","title":{"rendered":"Toronto-Quebec high-speed rail project could cost more than Ottawa\u2019s estimate, PBO says"},"content":{"rendered":"<p><a style=\"display:block\" href=\"https:\/\/www.theglobeandmail.com\/resizer\/v2\/VGM4F4QDU5GXDHOBTZXTVIPGFY.jpg?auth=b47ebb97704fdbee525575084947d55993645e1298e6c07f20d36828c4683805&amp;width=600&amp;height=400&amp;quality=80&amp;focal=1822%2C1250\" aria-haspopup=\"true\" data-photo-viewer-index=\"0\" rel=\"nofollow noopener\" target=\"_blank\">Open this photo in gallery:<\/a><\/p>\n<p class=\"figcap-text\">A rendering of the proposed first high-speed rail line between Quebec City and Toronto. The PBO&#8217;s analysis does not attempt to estimate the project&#8217;s operational cost.Supplied<\/p>\n<p class=\"c-article-body__text text-pr-5\">The construction cost of building a dedicated high-speed rail line between Toronto and Quebec City could be between $75-billion and $113-billion, according to a new report from Parliamentary Budget Officer Annette Ryan.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The PBO\u2019s range is higher than the one regularly cited by Alto, the Crown corporation responsible for the project, which has said it will be between $60-billion and $90-billion.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Alto has said its range is a preliminary estimate that will be further refined and updated next year.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The PBO report released Thursday is based on a review of international examples of the per-kilometre cost of building high speed rail.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Both the PBO\u2019s figures and Alto\u2019s estimates only include the cost of building the new line.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The PBO report does not attempt to estimate the operational cost of the project. It says operational costs and whether the project\u2019s ridership revenue will cover those costs will be addressed in a future report.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The Globe and Mail <a href=\"https:\/\/www.theglobeandmail.com\/politics\/article-toronto-quebec-high-speed-rail-cost-alto\/\" target=\"_self\" rel=\"nofollow noopener\" title=\"https:\/\/www.theglobeandmail.com\/politics\/article-toronto-quebec-high-speed-rail-cost-alto\/\">reported<\/a> in August that an internal document from 2023 it obtained shows that operating and maintaining the line is estimated to cost between $62.6-billion and $67-billion over 40 years. That is in addition to the cost of construction. When construction and operational costs are combined with rolling stock purchases, the internal report said the total price tag over 40 years would be around $150-billion. <\/p>\n<p class=\"c-article-body__text text-pr-5\">That 2023 internal report also said total projected revenue for the high-speed rail system is $105-billion over the 40-year period, meaning ridership revenue would more than cover operational costs and would offset some of the construction cost.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The next PBO report will focus on the issue of ridership revenue and operational costs. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Alto estimates that ridership will reach 24 million passengers a year by 2055 and up to 43 million by 2084.<\/p>\n<p class=\"c-article-body__text text-pr-5\">That would be a significant increase in comparison to current ridership levels on the existing Via Rail service, which has declined from eight million passengers a year in the 1980s to about 4.4 million in 2025, according to Alto.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Via Rail has long said it is hindered from offering faster and more reliable service because it shares track with slower freight traffic, which is given priority.<\/p>\n<p class=\"c-article-body__text text-pr-5\">That is one of the government\u2019s main arguments for why a new line exclusively dedicated to passenger rail services is needed in the corridor. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Alto has said the segment between Ottawa and Montreal will be built first, with construction starting as soon as 2029 if the project receives final cabinet approval before then. <\/p>\n<p class=\"c-article-body__text text-pr-5\">Alto is planning to release a more specific proposed route this year for the Ottawa-to-Montreal segment.<\/p>\n<p class=\"c-article-body__text text-pr-5\">While Alto says the project will cover 1,000 kilometres, the PBO analysis uses 850 kilometres for its assumptions. The PBO says the driving distance from Toronto to Quebec City via Montreal and Ottawa is less than 850 kilometres and a high-speed rail line is likely to be more direct than driving because such lines require fewer and broader curves. <\/p>\n<p class=\"c-article-body__text text-pr-5\">The PBO report lists parts of the line that will have higher costs per-kilometre. This includes plans for a 15-kilometre tunnel under Mount Royal linking Laval and downtown Montreal.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The government has not officially decided whether the route between Peterborough, Ont., and Ottawa will run north through the Canadian Shield or south near Kingston.<\/p>\n<p class=\"c-article-body__text text-pr-5\">The PBO says rock blasting through the Canadian Shield is an engineering challenge that will also mean higher costs than other parts of the line. <\/p>\n<p class=\"c-article-body__text text-pr-5\">The southern route also presents the potential for more expensive sections, as it could cut through sensitive ecological terrain as well as more densely populated areas. The PBO\u2019s cost estimate does not account for the Kingston option.<\/p>\n<p class=\"c-article-body__text text-pr-5\">Transportation Minister Steven MacKinnon <a href=\"https:\/\/www.theglobeandmail.com\/politics\/article-transport-minister-signals-strong-preference-for-kingston-high-speed\/\" target=\"_self\" rel=\"nofollow noopener\" title=\"https:\/\/www.theglobeandmail.com\/politics\/article-transport-minister-signals-strong-preference-for-kingston-high-speed\/\">said in June<\/a> that the southern route serving Kingston is the government\u2019s \u201cstrong preference,\u201d but that decision has not been formally confirmed. <\/p>\n<p class=\"c-article-body__text text-pr-5\">The PBO report says recent legislation related to large federal project approvals, such as the Building Canada Act, and the High-Speed Rail Network Act, which deals with expropriation processes, could help accelerate the project and avoid cost overruns experienced in other jurisdictions. <\/p>\n<p class=\"c-article-body__text text-pr-5\">\u201cWhile Canada\u2019s legislative framework is intended to avoid the major cost-overrun drivers we\u2019ve seen in comparable American and British projects, Canada\u2019s route geography has some significant cost escalators \u2013 most notably tunnelling in and around Montreal, and the complexities of the Canadian Shield portion,\u201d Ms. Ryan said in a statement.<\/p>\n<p class=\"c-article-body__text text-pr-5\">She said that the report offers Parliament an independent assessment of the potential costs and economic effects associated with the project, noting it\u2019s the &#8221; one of the largest infrastructure projects ever proposed in Canada.\u201d<\/p>\n<p class=\"c-article-body__text text-pr-5\">Philippe Archambault, a spokesperson for Alto, said the PBO\u2019s analysis places the construction cost within a range \u201cthat is similar to and consistent with Alto\u2019s working estimate,\u201d despite using different methodology.<\/p>\n<p class=\"c-article-body__text text-pr-5\">\u201cThis independent report also suggests that some of the more pessimistic scenarios raised in the public debate are not supported by international experience. The development phase is ongoing and will confirm the route, refine cost estimates and finalize a rigorous business case before any final investment decision is made,\u201d he said in a statement.<\/p>\n<p class=\"c-article-body__text text-pr-5\">He said Alto expects to release an initial version of the business case in the first half of 2027. <\/p>\n","protected":false},"excerpt":{"rendered":"Open this photo in gallery: A rendering of the proposed first high-speed rail line between Quebec City and&hellip;\n","protected":false},"author":2,"featured_media":916799,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[194291],"tags":[49,48,714,3302],"class_list":["post-916798","post","type-post","status-publish","format-standard","has-post-thumbnail","category-toronto","tag-ca","tag-canada","tag-politics","tag-toronto"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/916798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=916798"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/916798\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/916799"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=916798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=916798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=916798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}