{"id":917486,"date":"2026-10-02T05:56:09","date_gmt":"2026-10-02T05:56:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/ca\/917486\/"},"modified":"2026-10-02T05:56:09","modified_gmt":"2026-10-02T05:56:09","slug":"hydro-quebec-wants-to-double-data-centre-costs-google-and-others-prepare-rebuttal","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ca\/917486\/","title":{"rendered":"Hydro-Qu\u00e9bec wants to double data centre costs, Google and others prepare rebuttal"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.cbc.ca\/a\/assets\/texttospeech.svg\" alt=\"Text to Speech Icon\" width=\"44\" height=\"44\"\/><\/p>\n<p>Listen to this article<\/p>\n<p>Estimated 3 minutes<\/p>\n<p>The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.<\/p>\n<p>Analysts for Hydro-Qu\u00e9bec made the case Thursday morning that the utility needs to act urgently to limit the impact of the growing data centre industry on energy costs for Quebecers.\u00a0<\/p>\n<p>In a public hearing in Montreal, the provincial utility called for a new energy rate that could double the cost of energy for data centres.<\/p>\n<p>\u201cI don&#8217;t think I will surprise anyone by saying that the context has changed deeply and that the era of energy surpluses is now behind us,\u201d said Sarah Trabelsi, chief of costs and pricing at Hydro-Qu\u00e9bec.\u00a0<\/p>\n<p>This was part of the utility\u2019s first presentation at a provincial energy regulator hearing. It is pitting Hydro-Qu\u00e9bec against tech industry actors like Google as well as environmental advocates like Greenpeace.<\/p>\n<p>Hydro-Qu\u00e9bec is asking the R\u00e9gie de l\u2019\u00e9nergie \u2014 the regulator \u2014 to consider a new electricity rate for data centres that require a capacity of over five megawatts.\u00a0<\/p>\n<p>The proposal would raise energy prices to an average of 13 cents per kilowatt hour. Data centres currently pay an average of 6.82 cents per kWh, according to Hydro-Qu\u00e9bec\u2019s calculations.<\/p>\n<p>With the average cost of energy at around 12 cents per kWh and increasing, Hydro-Qu\u00e9bec said it wants to ensure it does not keep selling energy to data centres at a discount that will leave other customers footing the bill.<\/p>\n<p>\u201cWe\u2019re proposing these rates in an effort to manage and mitigate, or control, the impact on our customer base as a whole,\u201d said Trabelsi.<\/p>\n<p>Hydro-Qu\u00e9bec said data centres that would be subject to the new rate currently consume 190 MW at peak consumption and could reach 1,000 MW by 2035.<\/p>\n<p>Energy costs for data centres in Quebec are much lower than in most other jurisdictions, said energy analyst Jean-Fran\u00e7ois Blain in an interview.<\/p>\n<p>\u201cIt creates an exceptional draw that benefits Quebec, as long as they can supply those companies,\u201d he said.\u00a0<\/p>\n<p>The new rate would bring their rates closer to those of other areas.<\/p>\n<p>The first part of the hearing is scheduled to last until Oct. 9, with a second part planned in December. <\/p>\n<p>The hearing will involve actors from several industries, such as the Canadian Federation of Independent Business and a coalition of environmental groups including Greenpeace and Nature Qu\u00e9bec.<\/p>\n<p>The provincial energy regulator will be reviewing whether a new rate for data centres is fair and sustainable.  <\/p>\n","protected":false},"excerpt":{"rendered":"Listen to this article Estimated 3 minutes The audio version of this article is generated by AI-based technology.&hellip;\n","protected":false},"author":2,"featured_media":917487,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[49,48,295,66],"class_list":["post-917486","post","type-post","status-publish","format-standard","has-post-thumbnail","category-environment","tag-ca","tag-canada","tag-environment","tag-science"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/917486","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/comments?post=917486"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/posts\/917486\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media\/917487"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/media?parent=917486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/categories?post=917486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ca\/wp-json\/wp\/v2\/tags?post=917486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}