{"id":266348,"date":"2026-01-27T10:55:14","date_gmt":"2026-01-27T10:55:14","guid":{"rendered":"https:\/\/www.newsbeep.com\/ie\/266348\/"},"modified":"2026-01-27T10:55:14","modified_gmt":"2026-01-27T10:55:14","slug":"how-long-more-must-we-wait-for-it-and-how-much-has-it-cost-so-far-the-irish-times","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ie\/266348\/","title":{"rendered":"How long more must we wait for it and how much has it cost so far? \u2013 The Irish Times"},"content":{"rendered":"<p class=\"c-paragraph paywall \">More than \u20ac35 million has been spent on Dart+ South West to date, despite construction not due to begin on the project until 2030. <\/p>\n<p class=\"c-paragraph paywall \">Figures released by the <a href=\"https:\/\/www.irishtimes.com\/tags\/department-of-transport\/\" target=\"_self\" rel=\"nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/department-of-transport\/\">Department of Transport<\/a> show \u20ac28 million has been spent on service providers and programme management contracts, \u20ac5.6 million on project management and \u20ac1.6 million on lookouts, property, legal and railway order costs. <\/p>\n<p class=\"c-paragraph paywall \">Dart+ South West, which would bring Dart services to Celbridge and Hazelhatch in Co Kildare, was granted planning permission in November 2024, with construction expected to start this year. <\/p>\n<p class=\"c-paragraph paywall \">However, the <a href=\"https:\/\/www.irishtimes.com\/tags\/national-development-plan\/\" target=\"_self\" rel=\"nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/national-development-plan\/\">National Development Plan<\/a> (NDP) review, published last November, gave a construction date of \u201c2030+\u201d with the procurement timeline set for \u201c2028-2029\u201d. The review set the cost of the project at more than \u20ac1 billion.<\/p>\n<p class=\"c-paragraph paywall \">The line would see a quadrupling of passenger capacity from 5,000 to 20,000 each way during peak hours. This would cater for a rapidly increasing commuter population in large new housing developments planned for west Dublin and north Kildare.<\/p>\n<p class=\"c-paragraph paywall \">The upgrade will see the electrification of 20km of the line from Hazelhatch and Celbridge to Heuston, as well as the Phoenix Park tunnel branch line. The line capacity would be increased from two tracks to four between Park West and Cherry Orchard stations. In addition, two new stations would be constructed: Heuston West (close to Islandbridge) and Kylemore, which would serve Ballyfermot.<\/p>\n<p class=\"c-paragraph paywall \">Sinn F\u00e9in TD <a href=\"https:\/\/www.irishtimes.com\/tags\/eoin-o-broin\/\" target=\"_self\" rel=\"nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/eoin-o-broin\/\">Eoin \u00d3 Broin<\/a> described the delay of the project as \u201cincredibly frustrating\u201d and said traffic in areas such as Lucan and Clondalkin had \u201creached a level of density I\u2019ve never witnessed\u201d. <\/p>\n<p class=\"c-paragraph paywall \">\u201cThis is a project for which there\u2019s been planning for a very long time. There have been no legal challenges and there is a huge public demand and indeed need for this project to go ahead as a matter of urgency,\u201d the Dublin Mid-West TD said. <\/p>\n<p class=\"c-paragraph paywall \">\u201cThe train line runs through two strategic development zones, Clonburris and Adamstown, and while there isn\u2019t enough housing being built, particularly new social affordable homes, along this stretch of rail line there has been significant residential development.\u201d <\/p>\n<p class=\"c-paragraph b-it-article-body__interstitial-link\">[\u00a0<a aria-label=\"Open related story\" class=\"c-link\" href=\"https:\/\/www.irishtimes.com\/transport\/2026\/01\/08\/funding-approval-for-dart-south-west-could-be-brought-forward-to-pre-2030\/\" rel=\"noreferrer nofollow noopener\" target=\"_blank\">Funding approval for Dart+ South West could be brought forward to pre-2030Opens in new window<\/a>\u00a0]<\/p>\n<p class=\"c-paragraph paywall \">Speaking before Christmas, the Minister for Transport, <a href=\"https:\/\/www.irishtimes.com\/tags\/darragh-obrien\/\" target=\"_self\" rel=\"nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/darragh-obrien\/\">Darragh O\u2019Brien<\/a>, indicated that while the new service is not due to commence construction until after 2030, the timing was not set in stone.<\/p>\n<p class=\"c-paragraph paywall \">However, he said there were issues around train storage and how the service would interact with another proposed service, Dart+ West.<\/p>\n<p class=\"c-paragraph paywall \">Mr O\u2019Brien added there was \u201cflexibility\u201d within the NDP with regard to delivery and that it was \u201ca very important project\u201d he wanted to see delivered. <\/p>\n<p class=\"c-paragraph paywall \">\u201cTime frames in the NDP are indicative. It is a scheme that I would like to see us advance and I think that we can advance it,\u201d he said.<\/p>\n<p class=\"c-paragraph paywall \">The department said funding secured under the NDP will see construction start before 2030 on the Dart+ programme, beginning with Dart+ West, which is the \u201ccrucial enabler\u201d of the rest of the programme, and in particular Dart+ South West.<\/p>\n<p class=\"c-paragraph paywall \">\u201cDart+ West must be advanced as it will provide the depot capacity for the new fleet to be used on South West and also will provide the capacity in the city centre to allow for South West services to proceed,\u201d it said. <\/p>\n<p class=\"c-paragraph paywall \">The compulsory purchase orders (CPO) processes for Dart+ South West will begin this year. <\/p>\n<p class=\"c-paragraph paywall \">Aspects of the procurement frameworks put in place for Dart+ West will be available for use on South West when its main construction works commence, which the \u201cdepartment hopes to accelerate through the additional NDP funding made available in 2028 onwards\u201d, it said. <\/p>\n<p class=\"c-paragraph paywall \">\u201cThe department will also explore any EU funding which may become available to accelerate public transport projects,\u201d it added. <\/p>\n","protected":false},"excerpt":{"rendered":"More than \u20ac35 million has been spent on Dart+ South West to date, despite construction not due to&hellip;\n","protected":false},"author":2,"featured_media":266349,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[15910,4478,7941,74908,61,60,3413,43],"class_list":["post-266348","post","type-post","status-publish","format-standard","has-post-thumbnail","category-ireland","tag-darragh-o-brien","tag-dart","tag-department-of-transport","tag-eoin-o-broin","tag-ie","tag-ireland","tag-national-development-plan","tag-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts\/266348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/comments?post=266348"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts\/266348\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/media\/266349"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/media?parent=266348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/categories?post=266348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/tags?post=266348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}