{"id":420201,"date":"2026-04-27T16:05:10","date_gmt":"2026-04-27T16:05:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/ie\/420201\/"},"modified":"2026-04-27T16:05:10","modified_gmt":"2026-04-27T16:05:10","slug":"dart-extension-to-wicklow-advances-as-tender-issued-for-new-charging-infrastructure","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ie\/420201\/","title":{"rendered":"Dart extension to Wicklow advances as tender issued for new charging infrastructure"},"content":{"rendered":"<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">The move follows a recent market engagement phase with industry suppliers and marks a significant acceleration of the project, bringing the expected delivery date forward by several years compared to earlier transport plans.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">The new system will enable battery electric Dart trains to operate south of Greystones, where no overhead electrification currently exists. Under the proposed operating model, trains will run on standard overhead power from Dublin to Greystones before switching to battery mode for the final section to Wicklow. They will recharge while stationary at Wicklow station, allowing for a consistent hourly service in both directions.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">T\u00e1naiste and Wicklow TD Simon Harris has welcomed the announcement, describing it as \u201ca very important step forward for Wicklow town and for everyone who relies on rail services to commute to and from Dublin\u201d.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">He said the project is now moving \u201cfrom planning towards delivery\u201d, adding that the investment will provide \u201cmore frequent, more reliable and cleaner public transport\u201d for the region.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">The tender includes the design and installation of specialised charging equipment, including high voltage power systems and platform mounted charging bars on platforms one and two. These will allow the new battery electric Dart fleet to recharge quickly and safely before beginning their return journey to Dublin.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">The timeline for the Wicklow project is closely aligned with the national rollout of Ireland\u2019s new Dart fleet. The first of the new polish-built carriages will enter passenger service on the northern line to Drogheda from 2027, following testing and commissioning. These initial units will operate on fully electrified routes. The battery electric variants required for Wicklow will be introduced in later phases of the fleet deployment.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">This sequencing is intentional. Construction of the Wicklow charging system is scheduled to begin in 2027, with services expected to commence in 2029. By that stage, the battery electric units will be fully delivered and ready for operation on non electrified sections of the network. The approach ensures that the infrastructure and rolling stock come online in tandem, avoiding delays or under utilisation of the new fleet.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">A separate but related initiative, the Wicklow Rail Capacity Enhancement Project, remains at the planning stage and has not yet gone to tender. That project will include platform lengthening, improvements to the station car park, the installation of electric vehicle charging points, and the construction of a new active travel bridge linking the station to the Port Access Road. It will also deliver upgraded bus interchange facilities and enhanced cycling infrastructure.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">Together, these projects represent the most substantial investment in Wicklow\u2019s rail infrastructure in decades. They form part of the wider Dart plus programme, which aims to expand high frequency, low emission rail services across the Greater Dublin Area by combining traditional electrification with emerging battery electric technology.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">If delivered on schedule, Wicklow town will join the Dart network in a little over three years\u2019 time, bringing cleaner, more reliable rail services to one of Ireland\u2019s fastest growing commuter regions.<\/p>\n<p class=\"indo-ebe0ecc6_root indo-ebe0ecc6_paragraph indo-300db776_none indo-91174671_primary indo-1d70522a_marginbottom5 indo-1d70522a_margintop0 indo-b48c4984_inherit\" style=\"color:var(--color-primary-80)\">Funded by the Local Democracy Reporting Scheme  <\/p>\n","protected":false},"excerpt":{"rendered":"The move follows a recent market engagement phase with industry suppliers and marks a significant acceleration of the&hellip;\n","protected":false},"author":2,"featured_media":420202,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[72,4478,55175,61,60],"class_list":["post-420201","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-business","tag-dart","tag-hugh-ofarrell-walsh","tag-ie","tag-ireland"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts\/420201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/comments?post=420201"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts\/420201\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/media\/420202"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/media?parent=420201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/categories?post=420201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/tags?post=420201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}