{"id":607244,"date":"2026-08-28T12:56:09","date_gmt":"2026-08-28T12:56:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/ie\/607244\/"},"modified":"2026-08-28T12:56:09","modified_gmt":"2026-08-28T12:56:09","slug":"nexans-new-deep-water-installation-cable-receives-qualification-tgs-4c","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/ie\/607244\/","title":{"rendered":"Nexans new deep water installation cable receives qualification TGS 4C"},"content":{"rendered":"<p>                        <img loading=\"lazy\" decoding=\"async\" class=\"img-fluid\" src=\"https:\/\/www.tgs4c.com\/news\/..\\images\\news221\\image33221(1).png\" width=\"700\" height=\"400\" style=\"border:0px solid;\"\/><br \/>&#13;<br \/>\nNexans has completed qualification of its 525 kV HVDC cable system for&#13;<br \/>\ninstallation at water depths of up to 3,000 metres.&#13;<br \/>\n&#13;<br \/>\n<br \/>&#13;<br \/>\nThe qualification covered the full system, including the cable, factory&#13;<br \/>\njoints and repair joints. &#13;<br \/>\n<br \/>&#13;<br \/>\nThe work was carried out as part of the Great Sea Interconnector project.&#13;<br \/>\nThe qualification process included electrical and mechanical testing, with&#13;<br \/>\nthe system tested to loads representative of installation conditions at&#13;<br \/>\ndepths of up to 3,000 metres. &#13;<br \/>\n<br \/>&#13;<br \/>\nThe qualification, together with the earlier sea trial, demonstrates the&#13;<br \/>\npotential deployment of HVDC transmission technology at water depths beyond&#13;<br \/>\nthe industry&#8217;s previously established limits.&#13;<br \/>\n&#13;<\/p>\n<p>To access more information on subsea&#13;<br \/>\ncables for offshore wind and interconnector projects, as well as transmission&#13;<br \/>\nintelligence, <a href=\"https:\/\/www.4coffshore.com\/subscriptions\/\" rel=\"nofollow noopener\" target=\"_blank\">click&#13;<br \/>\nhere<\/a>. &#13;<\/p>\n","protected":false},"excerpt":{"rendered":"&#13; Nexans has completed qualification of its 525 kV HVDC cable system for&#13; installation at water depths of&hellip;\n","protected":false},"author":2,"featured_media":607245,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[61,60,80],"class_list":["post-607244","post","type-post","status-publish","format-standard","has-post-thumbnail","category-technology","tag-ie","tag-ireland","tag-technology"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts\/607244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/comments?post=607244"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/posts\/607244\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/media\/607245"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/media?parent=607244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/categories?post=607244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/ie\/wp-json\/wp\/v2\/tags?post=607244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}