{"id":333172,"date":"2026-03-11T08:37:27","date_gmt":"2026-03-11T08:37:27","guid":{"rendered":"https:\/\/www.newsbeep.com\/il\/333172\/"},"modified":"2026-03-11T08:37:27","modified_gmt":"2026-03-11T08:37:27","slug":"saudi-arabia-scales-back-the-line-project-to-build-ai-data-centers","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/il\/333172\/","title":{"rendered":"Saudi Arabia Scales Back The Line Project to Build AI Data Centers"},"content":{"rendered":"<p>Saudi Arabia\u2019s urban project, <a href=\"https:\/\/parametric-architecture.com\/saudi-arabia-neom-scales-down-the-line\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/saudi-arabia-neom-scales-down-the-line\/\" rel=\"nofollow noopener\" target=\"_blank\">The Line<\/a>, once captured global attention as one of the most radical city concepts ever proposed. Designed as a 170-kilometer linear city in the desert, the project promised a car-free urban future powered by renewable energy and built around advanced infrastructure. However, years after its announcement, the project has undergone significant changes. Financial pressures, technical challenges, and shifting economic priorities have pushed Saudi Arabia to rethink the scale and purpose of the development, leading to potential reductions in the project\u2019s size and a reevaluation of its initial goals to ensure sustainability and feasibility.<\/p>\n<p>Recent reports indicate that the project is being drastically scaled back, with parts of the planned urban development potentially repurposed to host large-scale digital infrastructure, such as data centers, to support advanced computing and emerging technologies. This transition reflects a broader strategic shift in <a href=\"https:\/\/parametric-architecture.com\/researchers-propose-transforming-saudi-arabias-the-line-into-the-circle-to-enhance-accessibility\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/researchers-propose-transforming-saudi-arabias-the-line-into-the-circle-to-enhance-accessibility\/\" rel=\"nofollow noopener\" target=\"_blank\">Saudi Arabia\u2019s <\/a>approach to investing in technology-driven infrastructure while pursuing its long-term economic diversification goals.<\/p>\n<p>The Vision Behind NEOM and The Line<\/p>\n<p><a href=\"https:\/\/parametric-architecture.com\/architects-explain-saudi-arabias-the-line-in-new-discovery-channel-documentary\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/architects-explain-saudi-arabias-the-line-in-new-discovery-channel-documentary\/\" rel=\"nofollow noopener\" target=\"_blank\">The story of The Line<\/a> begins in 2017, when Saudi Arabia launched the NEOM project as part of its Vision 2030 strategy. The initiative aimed to reduce the country\u2019s dependence on oil by building new industries, attracting international investment, and developing advanced urban infrastructure.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" width=\"1582\" height=\"890\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/NEOM-Stadium-NEOM-FIFA-Saudi-Arabia-2024-Bid-04.webp.webp\" alt=\"Saudi Arabia 2034 World Cup\" class=\"wp-image-144799 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 5\" data-  \/><\/p>\n<p><a href=\"https:\/\/parametric-architecture.com\/saudi-arabia-scaled-down-plans-for-neom-the-line\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/saudi-arabia-scaled-down-plans-for-neom-the-line\/\" rel=\"nofollow noopener\" target=\"_blank\">NEOM <\/a>was introduced as a $500 billion megaproject along the Red Sea coast in northwestern Saudi Arabia. It was envisioned as a futuristic region featuring multiple developments, including industrial zones, tourism hubs, and research centers.<\/p>\n<p>At the center of this initiative stood The Line, a highly unconventional city design. Instead of expanding outward like traditional cities, The Line was planned as a narrow urban corridor stretching 170 kilometers across the desert.<\/p>\n<p>The Original Concept: A Linear City of the Future<\/p>\n<p>The Line was designed to accommodate approximately nine million residents inside two parallel mirrored structures rising about 500 meters high and roughly 200 meters wide. The city would run entirely on renewable energy and would eliminate cars, roads, and traditional urban sprawl.<\/p>\n<p>The proposal for The Line highlighted several key features intended to redefine how modern cities function. One of the central ideas was a zero-car mobility system, where residents would not rely on personal vehicles for daily travel. Instead, transportation would be handled through an underground high-speed transit network designed to move people quickly across the city\u2019s length.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"2364\" height=\"1329\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/the_line_neom_35.webp.webp\" alt=\"Futuristic Cities\" class=\"wp-image-152094 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 6\" data-  \/><\/p>\n<p>The plan also focused on walkable living, ensuring that schools, healthcare facilities, workplaces, and daily services would be reachable within a five-minute walk from residential areas. Another major element of the proposal was environmental preservation. Developers claimed that nearly 95 percent of the surrounding natural landscape would remain untouched, limiting urban sprawl and reducing ecological disruption. In addition, the project aimed to incorporate highly integrated digital infrastructure and automated logistics systems to manage services such as deliveries, utilities, and urban operations efficiently within the city\u2019s compact design.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/neom_neom_.webp.webp\" alt=\"Expensive Architectural Projects in The World\" class=\"wp-image-144348 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 7\" data-  \/><\/p>\n<p>The goal was to create a dense, hyper-connected urban environment that reimagined how cities could function in the future. The project\u2019s design quickly became one of the most widely discussed architectural visions of the decade.<\/p>\n<p>However, turning this concept into reality proved significantly more complicated.<\/p>\n<p>Rising Costs and Practical Challenges<\/p>\n<p>As construction planning progressed, concerns began to emerge around the project\u2019s feasibility. Building a continuous structure spanning 170 kilometers posed enormous engineering challenges, requiring unprecedented amounts of materials, logistics coordination, and financing.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1704\" height=\"2272\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/NEOM-The-Line-The-Lines-chief-operating-office-Giles-Pendleton-02.webp.webp\" alt=\"NEOM-The Line-The Line's chief operating office Giles Pendleton\" class=\"wp-image-146814 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 8\" data-  \/><\/p>\n<p>Reports indicate that tens of billions of dollars had already been spent while only limited structural progress had been achieved. At the same time, the cost projections for completing the entire city continued to rise sharply.<\/p>\n<p>Several additional factors contributed to the reassessment:<\/p>\n<p>Construction complexity associated with building a vertical city across desert terrain<\/p>\n<p>Rising global material costs and large infrastructure requirements<\/p>\n<p>Budget pressures tied to other national projects and international commitments<\/p>\n<p>Slower-than-expected development progress<\/p>\n<p>These pressures led Saudi authorities to conduct a comprehensive review of the NEOM development strategy.<\/p>\n<p>Scaling Back the Vision<\/p>\n<p>Following this review, the government began reconsidering the original scale of The Line. Instead of building the full 170-kilometer structure in the near term, officials started exploring smaller, more achievable phases.<\/p>\n<p>Some reports suggest that the first operational segment may be reduced to only a few kilometers, far smaller than the initial plan.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1704\" height=\"1278\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/NEOM-The-Line-The-Lines-chief-operating-office-Giles-Pendleton-03.webp.webp\" alt=\"NEOM-The Line-The Line's chief operating office Giles Pendleton\" class=\"wp-image-146815 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 9\" data-  \/><\/p>\n<p>This shift reflects a pragmatic approach. Rather than pursuing the entire megacity simultaneously, Saudi Arabia is prioritizing projects that can deliver economic returns sooner and require less upfront investment.<\/p>\n<p>At the same time, the strategic purpose of NEOM itself has begun to evolve.<\/p>\n<p>From Futuristic City to AI and Data Center Hub<\/p>\n<p>One of the most significant developments in the NEOM strategy is the growing emphasis on large-scale computing infrastructure. Instead of focusing exclusively on residential urban development, parts of the project are now being considered for advanced data center campuses.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/The-line-12-1024x575.jpg\" alt=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers\" class=\"wp-image-49290 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 10\" data-  \/><\/p>\n<p>These facilities serve as critical infrastructure for modern digital economies, hosting the computing systems that power cloud services, research platforms, and next-generation digital technologies.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"1600\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/The-line-11.jpg\" alt=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers\" class=\"wp-image-49288 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 11\" data-  \/><\/p>\n<p>Saudi Arabia has already taken concrete steps in this direction, including the establishment of partnerships and investments aimed at enhancing its data center capabilities and infrastructure. In 2025, NEOM signed a $5 billion agreement with DataVolt to build a major data center facility in the <a href=\"https:\/\/parametric-architecture.com\/cityscape-global-will-showcase-neoms-major-projects-the-line-trojena-sindalah-and-oxagon\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/cityscape-global-will-showcase-neoms-major-projects-the-line-trojena-sindalah-and-oxagon\/\" rel=\"nofollow noopener\" target=\"_blank\">Oxagon <\/a>industrial zone of the project. The first phase of this facility is expected to become operational by 2028.<\/p>\n<p>Geographic Advantages of the NEOM Region<\/p>\n<p>Despite the desert climate, the <a href=\"https:\/\/parametric-architecture.com\/is-the-line-still-future-of-cities\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/is-the-line-still-future-of-cities\/\" rel=\"nofollow noopener\" target=\"_blank\">NEOM region<\/a> offers several advantages for large-scale computing infrastructure.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1704\" height=\"2272\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/NEOM-The-Line-The-Lines-chief-operating-office-Giles-Pendleton-05.webp.webp\" alt=\"NEOM-The Line-The Line's chief operating office Giles Pendleton\" class=\"wp-image-146817 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 12\" data-  \/><\/p>\n<p>One of the major advantages of the NEOM region is its coastal location along the Red Sea. <a href=\"https:\/\/parametric-architecture.com\/google-project-suncatcher\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/google-project-suncatcher\/\" rel=\"nofollow noopener\" target=\"_blank\">Data centers <\/a>produce a tremendous amount of heat, making efficient cooling systems essential for their operation. Being close to the sea makes it possible to use seawater for large-scale cooling systems, which cuts down on the need for fresh water in the desert.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"1000\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/neom-_neom.webp.webp\" alt=\"Expensive Architectural Projects in The World\" class=\"wp-image-144347 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 13\" data-  \/><\/p>\n<p>Beyond its coastal benefits, the region offers ample land for large infrastructure facilities, allowing developers to build expansive campuses for data centers and related technology projects. The area also has strong solar and wind energy potential, which can provide sustainable power for energy-intensive operations.<\/p>\n<p>Strategically, NEOM is positioned between Europe, Asia, and Africa, giving it an ideal location for data connectivity and regional digital services. These combined factors make the NEOM region a highly attractive destination for long-term investment in digital infrastructure.<\/p>\n<p>A Strategic Shift in Saudi Arabia\u2019s Economic Priorities<\/p>\n<p>The transition from an ambitious architectural megacity toward a technology infrastructure hub illustrates a broader policy shift.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/20-Buildings-that-Changed-the-Way-We-Live-The-Line-NEOM-63.webp.webp\" alt=\"The LINE\" class=\"wp-image-143890 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 14\" data-  \/><\/p>\n<p>Saudi Arabia\u2019s economic planners appear increasingly focused on building digital capacity and computing infrastructure, which is considered essential for future economic competitiveness. Investments in these sectors can support industries ranging from research and finance to manufacturing and logistics. This strategy aligns with the wider objectives of <a href=\"https:\/\/parametric-architecture.com\/vision-2030-projects-saudi-arabia\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/vision-2030-projects-saudi-arabia\/\" rel=\"nofollow noopener\" target=\"_blank\">Vision 2030<\/a>, which aims to create a diversified, knowledge-driven economy.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"926\" height=\"1080\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/the-line-in-neom-redefining-urban-5.webp.webp\" alt=\"Vibrant urban life within The Line: a glimpse of the diverse public spaces, lush greenery, and entertainment zones that blend technology, nature, and social interaction in this revolutionary vertical city\" class=\"wp-image-112575 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 15\" data-  \/><\/p>\n<p>Instead of quitting NEOM entirely, the government appears to be redefining its priorities within the project, moving from symbolic mega-architecture toward infrastructure that directly supports technological and economic growth.<\/p>\n<p>The Future of The Line<\/p>\n<p>Despite reports of scaling back, The Line has not completely disappeared from Saudi Arabia\u2019s development agenda. The project may still construct smaller sections, which could serve as experimental urban districts or mixed-use developments.<\/p>\n<p>However, many now view the original vision of a <a href=\"https:\/\/parametric-architecture.com\/170-kilometer-long-saudi-arabia-futuristic-megacity-the-line\/\" data-type=\"link\" data-id=\"https:\/\/parametric-architecture.com\/170-kilometer-long-saudi-arabia-futuristic-megacity-the-line\/\" rel=\"nofollow noopener\" target=\"_blank\">170-kilometer mirrored megacity<\/a> housing millions of residents as unlikely to materialize in its initial form.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1120\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/the_line_neom_33.webp.webp\" alt=\"Futuristic Cities\" class=\"wp-image-152092 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 16\" data-  \/><\/p>\n<p>Instead, NEOM may gradually evolve into a hybrid development that combines industrial zones, logistics hubs, research facilities, tourism projects, and digital infrastructure.<\/p>\n<p>The story of The Line reflects both the ambition and the complexity of large-scale futuristic projects. What began as one of the most surprising city concepts ever proposed has now entered a phase of strategic reassessment.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"2000\" height=\"909\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/www.newsbeep.com\/il\/wp-content\/uploads\/2026\/03\/NEOM-Construction_The-Line.webp.webp\" alt=\"The Line's construction\" class=\"wp-image-101005 lazyload\" title=\"Saudi Arabia Scales Back The Line Project to Build AI Data Centers 17\" data-  \/><\/p>\n<p>Economic realities, construction challenges, and shifting technological priorities have reshaped the project\u2019s direction. While the original megacity vision is being scaled back, the NEOM region is emerging as a potential hub for digital infrastructure and large-scale computing facilities.<\/p>\n<p>In this sense, the project\u2019s transformation may represent not a failure of vision but a recalibration of strategy that aligns more closely with the evolving demands of the global digital economy.<\/p>\n<p>Image credit: <a href=\"https:\/\/www.neom.com\/en-us\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.neom.com\/en-us\" rel=\"noreferrer noopener nofollow\">NEOM<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"Saudi Arabia\u2019s urban project, The Line, once captured global attention as one of the most radical city concepts&hellip;\n","protected":false},"author":2,"featured_media":333173,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[437,434,435,436,438,146,85,46],"class_list":["post-333172","post","type-post","status-publish","format-standard","has-post-thumbnail","category-arts-and-design","tag-arts","tag-arts-and-design","tag-artsanddesign","tag-artsdesign","tag-design","tag-entertainment","tag-il","tag-israel"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/posts\/333172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/comments?post=333172"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/posts\/333172\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/media\/333173"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/media?parent=333172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/categories?post=333172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/il\/wp-json\/wp\/v2\/tags?post=333172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}