{"id":10787,"date":"2025-09-09T02:13:14","date_gmt":"2025-09-09T02:13:14","guid":{"rendered":"https:\/\/www.newsbeep.com\/nz\/10787\/"},"modified":"2025-09-09T02:13:14","modified_gmt":"2025-09-09T02:13:14","slug":"sunlive-another-step-forward-for-takitimu-north-link","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/nz\/10787\/","title":{"rendered":"SunLive &#8211; Another step forward for Takitimu North Link"},"content":{"rendered":"<p>A long-awaited step forward is confirmed for the new four-lane state highway west of Tauranga, between Te Puna and \u014cmokoroa, as applications for statutory approvals are lodged for Stage 2 of the Takitimu North Link project under the Fast-track Approvals Act, NZ Transport Agency Waka Kotahi confirms.<\/p>\n<p>This comes as contracts are being awarded for design of this Road of National Significance, and work is underway to refine the design where Stage 1 and 2 meet at Te Puna, helping align both stages and reduce re-work under Stage 2.<\/p>\n<p>\u201cThis moment represents the culmination of considerable mahi and tautoko (support) by many over recent years. We acknowledge the commitment and support from our stakeholders over the project\u2019s history, as well as the clear need for improved reliability, resilience and safety on this stretch of State Highway 2,\u201d said Susan Collins, NZTA Regional Manager System Design.<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2025\/09\/090925SLSPStatehighway2-01-(1).jpg\" style=\"width: 100%;\"\/>Existing State Highway 2 above Te Puna Quarry Road, facing east towards Te Puna<\/p>\n<p>Stage 2 extends Takitimu North Link Stage 1, currently in construction between Tauranga and Te Puna, onwards to \u014cmokoroa.<\/p>\n<p>The project will improve reliability and resilience for those travelling through the Western Bay sub-region, particularly at \u014cmokoroa, Whakam\u0101rama, Te Puna and Tauranga.<\/p>\n<p>\u201cDelivering a project of this size and scale comes with its challenges, from managing the sensitive coastal environment to landholdings and complex stormwater requirements.<\/p>\n<p>\u201cReaching the pre-implementation phase is no small feat, with several structures and a major interchange\u00a0to be designed for the proposed\u202f7.1km four-lane state highway to be built.<\/p>\n<p>\u201cWe are looking forward to working on the design with local authorities including Western Bay of Plenty District Council, Bay of Plenty Regional Council and local hap\u016b Pirir\u0101kau and Ng\u0101ti Taka, recognising the important role this infrastructure will have in the future prosperity of the region,\u201d said Collins.<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2025\/09\/090925SLSPStatehighway2-03-(1).jpg\" style=\"width: 100%;\"\/>Existing State Highway 2 at Whakam\u0101rama, looking towards \u014cmokoroa. Photo \/ NZTA Waka Kotahi<\/p>\n<p>People passing through the area will see a programme of ground investigations beginning later this year, with key sites near Snodgrass, Ainsworth and Te Puna Quarry, and Munro roads, and near Te Puna Stream.<\/p>\n<p>\u201cNg\u0101ti Taka hap\u016b representatives have been working alongside NZTA Waka Kotahi on Takitimu North Link Stage 1 and developing Stage 2 for many years. This Kaupapa acknowledges our Mana and History, strengthens the relationships we have, and recognises the contribution and values we each bring to the table,&#8221; a\u00a0Ng\u0101ti Taka hap\u016b spokesperson said.<\/p>\n<p>\u201cEhara taku toa i te toa takitahi, engari he toa takitini \u2013 Our strength is not as an individual, but as a collective. We look forward to the next steps together.\u201d<\/p>\n<p style=\"margin-bottom:11px\"><img decoding=\"async\" alt=\"\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2025\/09\/090925SLSPStatehighway2-04-(1).jpg\" style=\"width: 100%;\"\/>Existing State Highway 2 at Te Puna Quarry Road. Photo \/ NZTA Waka Kotahi<\/p>\n<p>Tolling has been confirmed to support construction and maintenance costs, and funding for construction will be considered following further work in consenting and detailed design, which is currently in progress.<\/p>\n<p>The Stage 2 (Te Puna to \u014cmokoroa) project is a Road of National Significance project and is an extension of Stage 1 between Tauranga and Te Puna. It will include:\u00a0<\/p>\n<p>&#13;<br \/>\n\ta new 4-lane state highway with median and side barriers\u00a0&#13;<br \/>\n\toverbridge for local traffic at Plummers Point Road \/ Barrett Road\u00a0&#13;<br \/>\n\toverbridge for local traffic at Snodgrass Road \/ Te Puna Quarry Road\u00a0&#13;<br \/>\n\tgrade separated interchange at SH2 \/ \u014cmokoroa Road\u00a0&#13;<br \/>\n\t4 million cubic metres of earthworks\u00a0&#13;<br \/>\n\tecological restoration\u00a0areas&#13;<br \/>\n\tconnection to the Takitimu North Link Stage 1 (currently in construction)\u00a0&#13;<br \/>\n\texisting SH2 highway retained as a local road&#13;<\/p>\n<p>\u201cPirir\u0101kau has walked alongside NZTA Waka Kotahi for more than two decades in the planning of the Takitimu North Link. The corridor traverses our ancestral rohe, connecting the high-growth centres of \u014cmokoroa and Tauranga, and enabling the broader western Bay of Plenty region to flourish,&#8221; a\u00a0Pirir\u0101kau hap\u016b spokesperson said.<\/p>\n<p>\u201cFor Pirir\u0101kau, this whenua is not just land, it is imbued with whakapapa, k\u014drero tuku iho, and the legacy of our t\u016bpuna. The corridor follows traditional routes that once connected our coastal k\u0101inga to inland settlements and strategic pathways linking Pirir\u0101kau with our whanaunga in Waikato.<\/p>\n<p>\u201cAll our lands in this area were unjustly confiscated by the Crown in 1863, following the battles of Pukehinahina and Te Ranga. Yet despite that history, we remain committed to advancing positive outcomes for our hap\u016b and the wider community.\u201d<\/p>\n<p>\u201cThrough this project, we look forward to continuing our relationship with NZTA, building not just a road, but a future that acknowledges the past, respects our cultural identity, and supports the prosperity of all who call this place home.\u201d<\/p>\n<p>\u00a0Plan for a safe, enjoyable journey. Keep up to date with:<\/p>\n<p>Find out more about the Takitimu North Link project\u00a0<a data-auth=\"NotApplicable\" data-linkindex=\"0\" href=\"https:\/\/url.au.m.mimecastprotect.com\/s\/dQSZCr8DyZcmnZMqs7fJt4s-HH?domain=nzta.govt.nz\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\" title=\"https:\/\/url.au.m.mimecastprotect.com\/s\/dQSZCr8DyZcmnZMqs7fJt4s-HH?domain=nzta.govt.nz\/\">here<\/a>\u00a0with\u00a0Stage 2 maps\u00a0<a data-auth=\"NotApplicable\" data-linkindex=\"1\" href=\"https:\/\/url.au.m.mimecastprotect.com\/s\/lGyNCvl0KqclL819sXhptQW4FB?domain=nzta.govt.nz\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\" title=\"https:\/\/url.au.m.mimecastprotect.com\/s\/lGyNCvl0KqclL819sXhptQW4FB?domain=nzta.govt.nz\/\">here<\/a><\/p>\n<p>The application documents are published online at\u00a0<a data-auth=\"NotApplicable\" data-linkindex=\"2\" href=\"https:\/\/url.au.m.mimecastprotect.com\/s\/mTIpCxnMOqsXRv8lHwsqty0H5M?domain=fasttrack.govt.nz\" rel=\"noopener noreferrer nofollow\" target=\"_blank\" title=\"https:\/\/url.au.m.mimecastprotect.com\/s\/mTIpCxnMOqsXRv8lHwsqty0H5M?domain=fasttrack.govt.nz\">fasttrack.govt.nz<\/a>\u00a0and the Fast-track approvals process is outlined here at\u00a0<a data-auth=\"NotApplicable\" data-linkindex=\"3\" href=\"https:\/\/url.au.m.mimecastprotect.com\/s\/SRL2CyoNQlS42oD1UNtMtxMBEP?domain=environment.govt.nz\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\" title=\"https:\/\/url.au.m.mimecastprotect.com\/s\/SRL2CyoNQlS42oD1UNtMtxMBEP?domain=environment.govt.nz\/\">Fast-track approvals process<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"A long-awaited step forward is confirmed for the new four-lane state highway west of Tauranga, between Te Puna&hellip;\n","protected":false},"author":2,"featured_media":10788,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[42,43,40,38,41,39],"class_list":["post-10787","post","type-post","status-publish","format-standard","has-post-thumbnail","category-headlines","tag-headlines","tag-news","tag-top-news","tag-top-stories","tag-topnews","tag-topstories"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/10787","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/comments?post=10787"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/10787\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media\/10788"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media?parent=10787"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/categories?post=10787"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/tags?post=10787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}