{"id":156622,"date":"2025-11-27T16:55:17","date_gmt":"2025-11-27T16:55:17","guid":{"rendered":"https:\/\/www.newsbeep.com\/nz\/156622\/"},"modified":"2025-11-27T16:55:17","modified_gmt":"2025-11-27T16:55:17","slug":"the-reason-its-so-hard-to-build-stuff-in-new-zealand","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/nz\/156622\/","title":{"rendered":"The reason it\u2019s so hard to build stuff in New Zealand"},"content":{"rendered":"<p>In recent years, New Zealand politicians have proposed a lot of big stuff but achieved far less. If they actually want to build things again, they may need to think small.<\/p>\n<p>Grant Robertson was bullish as he announced Labour\u2019s plan for a partially tunnelled light rail line to Auckland\u2019s airport. The cost was eye-watering: about <a href=\"https:\/\/www.beehive.govt.nz\/release\/building-and-shaping-city-future-proofing-auckland-transport-infrastructure\" target=\"_blank\" rel=\"noopener nofollow\">$15bn by the government\u2019s figures<\/a>. As high as <a href=\"https:\/\/newsroom.co.nz\/2023\/07\/12\/the-unbearable-lightness-of-rail\/\" target=\"_blank\" rel=\"noopener nofollow\">$30bn by Treasury\u2019s<\/a>. But the finance minister insisted a huge, city-shaping investment was needed to \u201cfuture-proof\u201d Auckland\u2019s transport system. \u201cWe are not going to repeat the mistakes of ad hoc planning and a scramble to build infrastructure when it is too late,\u201d he said.<\/p>\n<p>That was 2022. We know what happened next. Another year of reports. Roughly <a href=\"https:\/\/www.nzherald.co.nz\/nz\/auckland-light-rail-disestablishment-to-likely-cost-millions-over-six-months-cabinet-paper-release\/DURFAAKNQ5GOHCDYIK2QBHTSZA\/\" target=\"_blank\" rel=\"noopener nofollow\">$230 million spent<\/a>. Not a metre of track laid. When National came to power, it promptly euthanised the light rail plan before throwing its corpse unceremoniously into a ditch marked \u201c<a href=\"https:\/\/thespinoff.co.nz\/politics\/28-10-2025\/were-spending-all-our-money-on-roads-that-suck\" target=\"_blank\" rel=\"noopener nofollow\">money for big roads<\/a>\u201d.\u00a0<\/p>\n<p>At least Auckland light rail (2017 \u2013 2023 RIP) has company in its final resting place. New Zealand\u2019s political history is littered with abandoned and stalled megaprojects. When Labour came to power in 2017, it dumped a bunch of expensive motorways, including the East-West Link and the P\u016bhoi to Wellsford highway extension. Let\u2019s Get Wellington Moving was meant to reshape the capital\u2019s entire transit network. It built one traffic crossing in four years. Robbie\u2019s rail would have been a massive overhaul to Auckland\u2019s transport system if it wasn\u2019t summarily <a href=\"https:\/\/www.cityraillink.co.nz\/newsletter-november-2021\/nz-rail-history-robbies-transport-dream-derailed\" target=\"_blank\" rel=\"nofollow noopener\">dumped into the bin by Robert Muldoon<\/a>. Politicians are now in their <a href=\"https:\/\/en.wikipedia.org\/wiki\/Second_Harbour_Crossing,_Auckland\" target=\"_blank\" rel=\"nofollow noopener\">third decade<\/a> of trying to build an extra Waitemat\u0101 Harbour crossing, and may well be trying for at least three decades more.\u00a0<\/p>\n<p>Some of these projects fall victim to political opposition. Others descend into a kind of rabbit hole of business cases and reports as officials try to grapple with the sheer scale of the task before them. But all of them suck up huge amounts of resources and time while achieving somewhere between almost nothing and nothing at all, and as a result, New Zealand can feel completely paralysed. While we angst our way through 15 different route variations for a single light rail line or churn out investment cases for what will likely be an <a href=\"https:\/\/nzta.govt.nz\/assets\/projects\/northland-corridor\/northland-corridor-investment-case-summary.pdf\" target=\"_blank\" rel=\"nofollow noopener\">$18bn-plus highway to Whang\u0101rei<\/a>, other countries just get on and build <a href=\"https:\/\/multimedia.scmp.com\/infographics\/news\/china\/article\/3200811\/high-speed-railway\/index.html\" target=\"_blank\" rel=\"nofollow noopener\">thousands of kilometres of high-speed track<\/a>.<\/p>\n<p>Given their at-best patchy record, why are our politicians and officials so addicted to megaprojects? Auckland\u2019s mayor Wayne Brown has a blunt diagnosis. \u201cSometimes big projects are necessary to get a city functioning well, but too often politicians use them as a namesake to make their mark. Gold-plated, over-designed megaprojects are very rarely needed,\u201d he says.\u00a0<\/p>\n<p>Green Party transport spokesperson Julie Anne Genter agrees. She says politicians love cutting ribbons on new megahighways when we\u2019d all be better served by smaller investments. \u201cIt\u2019s a political economy problem,\u201d she says. \u201cIt\u2019s easier to campaign on and claim credit for a few big projects \u2013 but those are not usually the best use of public money to get the outcomes we want.\u201d<\/p>\n<p>Transport minister Chris Bishop doesn\u2019t think that\u2019s a fair characterisation. Though megaprojects get the headlines, he points out that 96% of the projects in our infrastructure pipeline have a budget of under $50m and 98% have a budget of less than $100m. \u201cIt\u2019s the high-profile, high-cost projects like Auckland Light Rail, Lake Onslow, and Let\u2019s Get Wellington Moving that make the headlines. But it\u2019s the low-profile and often low-cost projects that actually make New Zealand,\u201d he says.<\/p>\n<p>Bishop could add some of the government\u2019s roads of national significance to that list of headline-grabbing big ticket items. In <a href=\"https:\/\/www.beehive.govt.nz\/speech\/speech-future-roads-2025-nz-roading-industry-conference\" target=\"_blank\" rel=\"noopener nofollow\">a recent speech to a roading industry conference<\/a>, he admitted the cost of the 17 routes National has committed to has blown out to $56bn, and many won\u2019t be built for many years to come. The Infrastructure Commission Te Waihanga estimates one of the roads alone \u2013 the highway from P\u016bhoi to Wh\u0101ngarei \u2013 could take up <a href=\"https:\/\/www.rnz.co.nz\/news\/national\/527505\/four-lane-auckland-whangarei-highway-could-cost-10-percent-of-government-infrastructure-budget\" target=\"_blank\" rel=\"noopener nofollow\">10% of the entire national budget for new infrastructure<\/a>\u00a0for the next 25 years.<\/p>\n<p>Some politicians don\u2019t think the cost is sustainable.\u00a0When he\u2019s not chucking road cones around, Brown can be found haranguing officials to <a href=\"https:\/\/www.greaterauckland.org.nz\/2025\/11\/03\/wayne-brown-wants-auckland-to-be-an-efficient-green-city\/\" target=\"_blank\" rel=\"nofollow noopener\">get more out of existing infrastructure<\/a>. He thinks the cheapest solutions are often the best. \u201cIt\u2019s easy to become distracted by government-imposed megaprojects which opposition parties promise in an election-year brain fart,\u201d he says. \u201cThese divert attention from simple fixes for our daily lives like getting traffic lights to flow better.\u201d<\/p>\n<p><img alt=\"A man with glasses and a white beard interacts with orange traffic cones in a parking garage; on the left, he's tossing cones into a dumpster, and on the right, he holds a cone with the caption \u201cYOU PULL UP ONE.\u201d.\" src=\"data:image\/gif;base64,R0lGODlhAQABAIAAAAAAAP\/\/\/yH5BAEAAAAALAAAAAABAAEAAAIBRAA7\" decoding=\"async\" data-nimg=\"responsive\" style=\"position:absolute;top:0;left:0;bottom:0;right:0;box-sizing:border-box;padding:0;border:none;margin:auto;display:block;width:0;height:0;min-width:100%;max-width:100%;min-height:100%;max-height:100%\"\/>Wayne Brown can often be spotted carrying out violent retribution against his hated road cones.<\/p>\n<p>Brown and AT\u2019s chief executive Dean Kimpton have had their disagreements, <a href=\"https:\/\/thespinoff.co.nz\/politics\/27-03-2024\/we-have-wayne-browns-texts-to-the-boss-of-at-theyre-exactly-what-youd-expect\" target=\"_blank\" rel=\"nofollow noopener\">mainly over the aforementioned cones<\/a>, but on this, they\u2019re perfectly aligned. Kimpton says we\u2019ve fallen into a habit of \u201cubering projects up and up and up\u201d to include everything, when we\u2019d be better starting small and expanding from there. He thinks light rail \u201cfell over under its own weight\u201d and believes we might not be stuck with nothing if the government had got on with laying some surface-level track on Queen St back when <a href=\"https:\/\/www.greaterauckland.org.nz\/2018\/12\/06\/a-brief-history-of-the-light-rail-project\/\" target=\"_blank\" rel=\"nofollow noopener\">AT suggested it in 2015<\/a>. \u201cI think a lot of infrastructure investment is about momentum, not just about designing the ultimate solution,\u201d he says. \u201cSo if there was one lesson learned, it\u2019s \u2018don\u2019t think you have to have the ultimate solution\u2019. You can have direction, but build it out and use momentum to help you get there, and it will deliver every time.\u201d<\/p>\n<p>In other words, wanting to \u201cfuture-proof\u201d projects may be understandable, but it\u2019s often counterproductive. Greater Auckland\u2019s Matt Lowrie says we end up spending billions of dollars\u00a0 today to \u201cstop someone standing on a platform in 2070\u201d when we could be getting lower cost projects underway and leaving the business of expanding them for later. He points out the projects that have been built in recent decades, including Auckland\u2019s rail and motorway networks, have been constructed in stages. \u201cBut all the stuff that we\u2019re seeing now is building 30 kilometres of State Highway in one go or a whole rail line in one go,\u201d he says. \u201cWe\u2019ve got to plan it for 100 years, and so now it\u2019s got to include stuff that we might not need for 99 of those years.\u201d<\/p>\n<p>Opponents like to cite the decision to build the Auckland Harbour Bridge with only four lanes in the 1950s as an example of the dangers of thinking too small. But starting with an undersized bridge and expanding to eight lanes a decade later <a href=\"https:\/\/www.greaterauckland.org.nz\/2021\/05\/05\/the-auckland-harbour-bridge-clip-ons-planning-disaster-or-best-practice\/\" target=\"_blank\" rel=\"nofollow noopener\">arguably produced a better outcome<\/a> than if politicians had stuck with the five lanes initially proposed, says Lowrie. \u201cWe\u2019ve now got more capacity than what we would\u2019ve had if we had just tried to go with what was originally planned.\u201d<\/p>\n<p>We also have, on the most basic level, a bridge. When Labour announced its headline transport policy ahead of the 2023 general election, it was met with a chorus of boos. The party wanted to spend $44bn building two road tunnels under the Waitemat\u0101 Harbour, along with a light rail line through seabed sludge, the toilets of the Belmont McDonald\u2019s and most horribly of all, Albany.<\/p>\n<p>Lowrie called the plan \u201cfarcical\u201d. The Herald\u2019s Simon Wilson accused the party of being <a href=\"https:\/\/www.nzherald.co.nz\/nz\/simon-wilson-while-labour-and-national-battle-to-build-more-roads-the-world-burns\/FQAF3OKSXVB2NAROSCVT7Y7GEU\/\" target=\"_blank\" rel=\"nofollow noopener\">transport \u201cfantasists<\/a>\u201d. Labour transport minister David Parker defended it as a <a href=\"https:\/\/www.rnz.co.nz\/news\/political\/495241\/tunnels-light-rail-cycling-and-bus-lanes-govt-unveils-ambitious-45b-new-harbour-crossing-plan\" target=\"_blank\" rel=\"nofollow noopener\">multi-decade, phased investment<\/a>. He may have been right, technically, but no-one believed him after the party\u2019s light rail saga. The thing with megaprojects is they\u2019re such huge, long-term ambitions, they look in practice like nothing, a hazy vision on the horizon never materialising in the real world, and what would you call that except a fantasy? Eventually it comes time to snap out of it.<\/p>\n","protected":false},"excerpt":{"rendered":"In recent years, New Zealand politicians have proposed a lot of big stuff but achieved far less. If&hellip;\n","protected":false},"author":2,"featured_media":156623,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[103672,55417,111,43,139,69,135,103673,18130],"class_list":["post-156622","post","type-post","status-publish","format-standard","has-post-thumbnail","category-new-zealand","tag-auckland-light-rail","tag-megaprojects","tag-new-zealand","tag-news","tag-newzealand","tag-nz","tag-politics","tag-roads-of-national-significance","tag-wayne-brown"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/156622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/comments?post=156622"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/156622\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media\/156623"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media?parent=156622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/categories?post=156622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/tags?post=156622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}