{"id":327467,"date":"2026-03-13T09:08:12","date_gmt":"2026-03-13T09:08:12","guid":{"rendered":"https:\/\/www.newsbeep.com\/nz\/327467\/"},"modified":"2026-03-13T09:08:12","modified_gmt":"2026-03-13T09:08:12","slug":"nasa-says-its-artemis-2-moon-rocket-is-all-fixed-up-it-could-launch-astronauts-to-the-moon-on-april-1","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/nz\/327467\/","title":{"rendered":"NASA says its Artemis 2 moon rocket is all fixed up. It could launch astronauts to the moon on April 1"},"content":{"rendered":"<p id=\"e63c39e1-36ec-46d3-bd8c-44d76e8bdb96\">NASA&#8217;s next launch to the moon is back on track.<\/p>\n<p><a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/artemis-2-humans-moon-orbit\" data-url=\"https:\/\/www.space.com\/artemis-2-humans-moon-orbit\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/artemis-2-humans-moon-orbit\" rel=\"nofollow noopener\" target=\"_blank\">Artemis 2<\/a> managers met over the past two days, conducting the mission&#8217;s flight readiness review (FRR) ahead of rolling its <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/33908-space-launch-system.html\" data-url=\"https:\/\/www.space.com\/33908-space-launch-system.html\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/33908-space-launch-system.html\" rel=\"nofollow noopener\" target=\"_blank\">Space Launch System<\/a> (SLS) rocket and Orion capsule back to the launch pad for liftoff. Repairs to the SLS were recently completed inside the Vehicle Assembly Building (VAB) at NASA&#8217;s <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/17705-nasa-kennedy-space-center.html\" data-url=\"https:\/\/www.space.com\/17705-nasa-kennedy-space-center.html\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/17705-nasa-kennedy-space-center.html\" rel=\"nofollow noopener\" target=\"_blank\">Kennedy Space Center<\/a> (KSC) in Florida, where ground teams will now prepare the vehicle for transportation to KSC&#8217;s Launch Complex-39B.<\/p>\n<p><a id=\"elk-seasonal\"\/><\/p>\n<p id=\"e63c39e1-36ec-46d3-bd8c-44d76e8bdb96-2\" class=\"paywall\" aria-hidden=\"true\">That rollout is now scheduled for March 19, with NASA targeting a launch as soon as April 1, agency officials announced today (March 12).<\/p>\n<p>Article continues below <\/p>\n<p>            You may like<\/p>\n<p id=\"9774a950-d8ea-4d45-83ac-a39a54596449\">&#8220;During the flight readiness review, we had extremely thorough discussions \u2014 very open, transparent,&#8221; Lori Glaze, NASA&#8217;s Exploration Systems Development acting associate administrator, said during a post-FRR press briefing today. It&#8217;s a short timeline, but NASA officials say they&#8217;re putting safety first as they work toward their next launch opportunity.<\/p>\n<p>&#8220;We talked a lot about our risk posture and how we&#8217;re mitigating those risks,&#8221; Glaze said. &#8220;We reviewed the challenges that we&#8217;ve had and how we&#8217;ve addressed them, and we talked about the work that remains, what&#8217;s left to do, and how we&#8217;re going to get through all of that.&#8221; <\/p>\n<p>Artemis 2 is NASA&#8217;s first crewed mission to <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/55-earths-moon-formation-composition-and-orbit.html\" data-url=\"https:\/\/www.space.com\/55-earths-moon-formation-composition-and-orbit.html\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/55-earths-moon-formation-composition-and-orbit.html\" rel=\"nofollow noopener\" target=\"_blank\">the moon<\/a> in more than 50 years. It will launch NASA astronauts Reid Wiseman, Victor Glover and Christina Koch, as well as Canadian astronaut Jeremy Hansen, on a 10-day journey around the moon and back to Earth aboard the <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/27824-orion-spacecraft.html\" data-url=\"https:\/\/www.space.com\/27824-orion-spacecraft.html\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/27824-orion-spacecraft.html\" rel=\"nofollow noopener\" target=\"_blank\">Orion<\/a> spacecraft.<\/p>\n<p>Their mission had been scheduled to get off the ground earlier this month. SLS had a shaky initial fueling test during the rocket&#8217;s first &#8220;wet dress rehearsal&#8221; (WDR) countdown simulation but successfully completed that procedure during a second attempt in February. Procedures following that WDR, though, uncovered <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/space-exploration\/artemis\/problem-pops-up-with-artemis-2-moon-rocket-this-will-almost-assuredly-impact-the-march-launch-window\" data-url=\"https:\/\/www.space.com\/space-exploration\/artemis\/problem-pops-up-with-artemis-2-moon-rocket-this-will-almost-assuredly-impact-the-march-launch-window\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/space-exploration\/artemis\/problem-pops-up-with-artemis-2-moon-rocket-this-will-almost-assuredly-impact-the-march-launch-window\" rel=\"nofollow noopener\" target=\"_blank\">a disruption with the flow of helium<\/a> in the SLS upper stage, which prompted a Feb. 25 rollback to the VAB for repair.<\/p>\n<p class=\"newsletter-form__strapline\">Breaking space news, the latest updates on rocket launches, skywatching events and more!<\/p>\n<p>Once back in its hangar, NASA engineers diagnosed and <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/space-exploration\/artemis\/nasa-repairs-artemis-2-rocket-continues-eyeing-april-moon-launch\" data-url=\"https:\/\/www.space.com\/space-exploration\/artemis\/nasa-repairs-artemis-2-rocket-continues-eyeing-april-moon-launch\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/space-exploration\/artemis\/nasa-repairs-artemis-2-rocket-continues-eyeing-april-moon-launch\" rel=\"nofollow noopener\" target=\"_blank\">addressed the issue<\/a> with enough confidence to target Artemis 2&#8217;s April launch opportunity. The problem was traced to a quick-disconnect (QD) seal on SLS&#8217; upper stage. The QD is the interface where umbilicals from the rocket&#8217;s launch tower transfer fuel into the vehicle. A similar problem led to an aborted countdown during the first Artemis 2 WDR, when hydrogen was detected leaking from a QD on the SLS first stage.<\/p>\n<p>&#8220;Our combined engineering teams across our ground systems and SLS teams came up with a design fix. That design fix was implemented on a test article, and we have successfully tested it, and we have qualified it for use on Artemis 2, and the modified QD is already on the upper stage,&#8221; Exploration Ground Systems Program Manager Shawn Quinn said during today&#8217;s briefing.<\/p>\n<p>Now, NASA officials are confident the rocket will be ready to launch as soon as April 1.<\/p>\n<p>            What to read next<\/p>\n<p id=\"ef619140-426c-48f8-a37a-c44b98b947c2\">Helium is used to maintain certain environmental systems and to pressurize SLS&#8217; propellant tanks. But the flow issue was found after the completion of the second Artemis 2 WDR and did not interfere with its success. That issue is now resolved, and NASA officials determined that a third fueling test won&#8217;t be needed after the Artemis 2 stack makes it back to the pad. Instead, the mission will progress straight to its launch opportunity.<\/p>\n<p>&#8220;Every time we tank the vehicle, it takes a little bit of the life out of those tanks,&#8221; Glaze told Space.com during today&#8217;s briefing.<\/p>\n<p>&#8220;We&#8217;ve exercised the team. We&#8217;ve exercised the hardware, and I&#8217;ll just tell you, from my perspective, when we tank the vehicle the very next time, I would like it to be on a day that we could actually launch,&#8221; she added. &#8220;I want to be able to poll &#8216;go&#8217; to launch.&#8221;<\/p>\n<p>As its name suggests, Artemis 2 will be the second mission of NASA&#8217;s Artemis program \u2014 but it&#8217;s the first to fly a crew aboard Orion. An uncrewed Orion capsule launched on <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/artemis-1-going-back-to-the-moon\" data-url=\"https:\/\/www.space.com\/artemis-1-going-back-to-the-moon\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/artemis-1-going-back-to-the-moon\" rel=\"nofollow noopener\" target=\"_blank\">Artemis 1<\/a> in November 2022 to certify the spacecraft&#8217;s flight systems in lunar orbit. Now, Artemis 2 will verify the capsule&#8217;s ability to support astronauts in deep space.<\/p>\n<p>Ultimately, the goal of NASA&#8217;s <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/artemis-program.html\" data-url=\"https:\/\/www.space.com\/artemis-program.html\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/artemis-program.html\" rel=\"nofollow noopener\" target=\"_blank\">Artemis program<\/a> is to establish a sustained presence on and around the moon. The agency hopes that doing so will build up the skills and knowledge needed to set up a crewed outpost on <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/47-mars-the-red-planet-fourth-planet-from-the-sun.html\" data-url=\"https:\/\/www.space.com\/47-mars-the-red-planet-fourth-planet-from-the-sun.html\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/47-mars-the-red-planet-fourth-planet-from-the-sun.html\" rel=\"nofollow noopener\" target=\"_blank\">Mars<\/a>, which it hopes to do in the 2040s. Artemis 2 was originally designed as a precursor to the program&#8217;s first moon landing on Artemis 3 in 2028, but a recent shakeup has restructured NASA&#8217;s plans.<\/p>\n<p class=\"vanilla-image-block\" style=\"padding-top:56.24%;\">\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/03\/xs5AFw9STwu4QqTi2QTgRS.jpg\" alt=\"A big orange rocket stands in the distance next to a launch tower. On the bottom left and right are green bushes in the foreground.\"   loading=\"lazy\" data-new-v2-image=\"true\" data-original-mos=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/03\/xs5AFw9STwu4QqTi2QTgRS.jpg\" data-pin-media=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/03\/xs5AFw9STwu4QqTi2QTgRS.jpg\" class=\"inline\"\/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/03\/6hyAGA9rr4Sfx6tKWS4zuk.png\" alt=\"artemis 2 mission badge\"   loading=\"lazy\" data-new-v2-image=\"true\" data-original-mos=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/03\/6hyAGA9rr4Sfx6tKWS4zuk.png\" data-pin-media=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/03\/6hyAGA9rr4Sfx6tKWS4zuk.png\" class=\"endorsement-img endorsement-top-left\"\/>\n<\/p>\n<p>NASA&#8217;s Artemis 2 SLS rocket and Orion spacecraft stand vertical on mobile launcher 1 on the way to Launch Complex 39B at NASA&#8217;s Kennedy Space Center in Florida on Jan. 17, 2026.\u00a0 (Image credit: Space.com \/ Josh Dinner)<\/p>\n<p id=\"f25ddfab-3936-47e9-b2da-924e15a3fc09\">Artemis 2&#8217;s mission remains unchanged: fly a single figure-eight loop around the moon and back to Earth. The roadmap for missions after that, however, has shifted slightly. Artemis 3 will no longer land on the moon. Instead, that mission will focus on rendezvous and docking maneuvers between Orion and SpaceX&#8217;s <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/spacex-starship-super-heavy.html\" data-url=\"https:\/\/www.space.com\/spacex-starship-super-heavy.html\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/spacex-starship-super-heavy.html\" rel=\"nofollow noopener\" target=\"_blank\">Starship<\/a> lunar lander and\/or Blue Origin&#8217;s <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/astronomy\/moon\/lunar-landers-and-transporter-tankers-blue-origin-unveils-its-blueprint-for-the-moon\" data-url=\"https:\/\/www.space.com\/astronomy\/moon\/lunar-landers-and-transporter-tankers-blue-origin-unveils-its-blueprint-for-the-moon\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/astronomy\/moon\/lunar-landers-and-transporter-tankers-blue-origin-unveils-its-blueprint-for-the-moon\" rel=\"nofollow noopener\" target=\"_blank\">Blue Moon<\/a> lander. Both of those private vehicles won NASA Human Landing System contracts to provide landing services for future Artemis missions, and the space agency has indicated a willingness to fly with whatever spacecraft can be ready in time.<\/p>\n<p>With <a data-analytics-id=\"inline-link\" href=\"https:\/\/www.space.com\/space-exploration\/artemis\/nasa-wants-to-accelerate-its-artemis-missions-to-the-moon-it-will-need-to-drop-some-big-hardware-to-do-it\" data-url=\"https:\/\/www.space.com\/space-exploration\/artemis\/nasa-wants-to-accelerate-its-artemis-missions-to-the-moon-it-will-need-to-drop-some-big-hardware-to-do-it\" data-hl-processed=\"none\" data-mrf-recirculation=\"inline-link\" data-before-rewrite-localise=\"https:\/\/www.space.com\/space-exploration\/artemis\/nasa-wants-to-accelerate-its-artemis-missions-to-the-moon-it-will-need-to-drop-some-big-hardware-to-do-it\" rel=\"nofollow noopener\" target=\"_blank\">the new timelines<\/a>, NASA hasn&#8217;t pushed its 2028 goal to put boots on the lunar surface. But it has shifted the program&#8217;s first lunar landing to Artemis 4 and aims to accomplish the same with Artemis 5 within less than a year of its predecessor.<\/p>\n<p>If Artemis 2 cannot launch on April 1, NASA has other opportunities from April 2 to April 6, with another window opening April 30 and possibly extending into May.<\/p>\n","protected":false},"excerpt":{"rendered":"NASA&#8217;s next launch to the moon is back on track. Artemis 2 managers met over the past two&hellip;\n","protected":false},"author":2,"featured_media":302415,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[111,139,69,147,392],"class_list":["post-327467","post","type-post","status-publish","format-standard","has-post-thumbnail","category-space","tag-new-zealand","tag-newzealand","tag-nz","tag-science","tag-space"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/327467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/comments?post=327467"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/327467\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media\/302415"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media?parent=327467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/categories?post=327467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/tags?post=327467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}