{"id":505856,"date":"2026-07-02T08:10:10","date_gmt":"2026-07-02T08:10:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/nz\/505856\/"},"modified":"2026-07-02T08:10:10","modified_gmt":"2026-07-02T08:10:10","slug":"bay-of-plenty-family-fear-catastrophe-from-exposed-gas-pipe","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/nz\/505856\/","title":{"rendered":"Bay of Plenty family fear catastrophe from exposed gas pipe"},"content":{"rendered":"<p class=\"body-paragraph articleLinkText  [&amp;_p]:tit-sub-xl tit-sub-xl md:[&amp;_p]:d-tit-sub-xl md:d-tit-sub-xl mb-[1.3rem]\">A Waiotahe Valley family have been living in fear of a gas explosion on their property since river movements exposed a high-pressure transmission line.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">By Diane McCarthy, Local Democracy Reporter<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cIt\u2019s an explosion waiting to happen,\u201d said rural property owner Te Kaha.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">He was told the blast radius could be at least 500 metres &#8211; enough to blow the windows out of his house, on the hillside above. There was also a road within the blast radius.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">He has an easement through his property in the Waiotahe Valley, near \u014cpotiki in the Bay of Plenty, for the transmission line which takes natural gas from Taranaki to \u014cp\u014dtiki and Gisborne.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">The gas line is normally buried at a minimum depth of 900mm. Where it crosses under the Waiotahe River, it is buried deeper.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">However, changes to the course of the river have eroded the bank and exposed the pipe.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">The pipe has been floating loose in the river for months, and now several metres are vulnerable.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Te Kaha fears a large log or fallen tree swept down the river in heavy rain could put lives in danger.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cIf a waterlogged tree hits that pipe, travelling at the force of flood water, that pipe&#8217;s history. We had one, 10-14 metres long, just a couple of months ago. It came sideways and stuck on the bridge [upstream of the pipe].\u201d<\/p>\n<p>&#8216;Thirty kilometres of high-pressure gas&#8217;<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cThey warned me when I first bought the place about 14 years ago that you can&#8217;t dig anywhere around here because, if you dig and you hit the gas pipe, it is a massive explosion.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cThere are only stop valves every 30km, so that\u2019s 30km worth of high-pressure gas that would be released. The gas is heavy, so it will lie on the ground until something ignites it.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/07\/te-kaha-has-been-warning-firstgas-about-ongoing-erosion-of-t-F4INSU43I5C6JMZ6YNLK7J7FBI.jpg\" alt=\"Te Kaha has been warning Firstgas about ongoing erosion of the river bank where the pipe is buried for about 18 months. \" width=\"800\" height=\"450\" loading=\"lazy\"\/><\/p>\n<p class=\"ImageMetadata__MetadataParagraph-sc-hi5x8q-0 cWTYyG image-metadata\">Te Kaha has been warning Firstgas about ongoing erosion of the river bank where the pipe is buried for about 18 months.  (Source: Local Democracy Reporting)<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Te Kaha has been aware of river movements eroding the land around the pipe for some time.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cFor about a year and a half now, I&#8217;ve been trying to tell the gas company they need to come and have a look because it&#8217;s not safe,\u201d he said.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">He feels Firstgas, which runs the pipeline, has not taken his concerns seriously or acted quickly enough.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cThe say things like, \u2018all I can do is convey your concerns to our geotech guys in New Plymouth&#8217;.\u201d<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">They had told him they needed to clear any work with the Bay of Plenty Regional Council, but he was told by regional council staff that Firstgas had not yet come to them with a plan.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">He said he feared not only for his own family but others on the road and children who use the swimming hole in the river about 30 metres from the pipe.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;It&#8217;s a catastrophe, it&#8217;s a train wreck in the making,\u201d he said.<\/p>\n<p>&#8216;No immediate safety risk to the public or nearby properties&#8217;<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Firstgas operations manager Ryan Phipps said the pipeline remained safe to operate. <\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cBased on our engineering assessment, there is no immediate safety risk to the public or nearby properties. However, the exposed section does require remediation, which is why we are progressing a long-term solution.\u201d <\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Since Local Democracy Reporting\u2019s enquiries, Firstgas had met on-site with the landowner and regional council and agreed in principle on a practical remediation approach.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">The proposed works involved installing protective rock structures upstream of the crossing to reduce the impact of flood flows and debris, encourage sediment to naturally rebuild over the pipeline, and then reinstate additional cover where required.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u201cThe site has been carefully monitored and assessed over time to determine the most appropriate long-term solution.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;The primary constraint is ensuring the work can be carried out safely and effectively. River conditions need to be suitable before contractors can access the site and undertake the remediation.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;We have also been working collaboratively with the regional council and the landowner to agree on the best approach.\u201d<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">He said if the pipeline were damaged, Firstgas had well-established emergency response procedures to safely isolate the pipeline and respond to the incident. <\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Bay of Plenty Regional Council rivers and drainage operations manager Dan Batten confirmed that the council had been working with Firstgas toward fixing the issue since April.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;Firstgas manages pipeline crossings in rivers and other areas where erosion, land movement, or changing watercourses can affect pipeline cover. <\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;Regional council is aware these locations are routinely monitored and managed through the Firstgas pipeline integrity and geohazard management programmes. <\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;In addition to this regional council understands that Firstgas has well-established emergency response procedures to safely isolate the pipeline and respond to the incident,&#8221; he said.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">\u2013 LDR is local body journalism co-funded by RNZ and NZ On Air.<\/p>\n","protected":false},"excerpt":{"rendered":"A Waiotahe Valley family have been living in fear of a gas explosion on their property since river&hellip;\n","protected":false},"author":2,"featured_media":505857,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[687,111,43,139,69,1756],"class_list":["post-505856","post","type-post","status-publish","format-standard","has-post-thumbnail","category-new-zealand","tag-housing-and-infrastructure","tag-new-zealand","tag-news","tag-newzealand","tag-nz","tag-tauranga-bay-of-plenty"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/505856","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/comments?post=505856"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/505856\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media\/505857"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media?parent=505856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/categories?post=505856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/tags?post=505856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}