{"id":525376,"date":"2026-07-14T09:51:25","date_gmt":"2026-07-14T09:51:25","guid":{"rendered":"https:\/\/www.newsbeep.com\/nz\/525376\/"},"modified":"2026-07-14T09:51:25","modified_gmt":"2026-07-14T09:51:25","slug":"knee-deep-potholes-in-newly-rebuilt-stretch-of-canterbury-highway","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/nz\/525376\/","title":{"rendered":"&#8216;Knee-deep&#8217; potholes in newly rebuilt stretch of Canterbury highway"},"content":{"rendered":"<p>A stretch of State Highway 1 south of Ashburton is riddled with potholes just months after being rebuilt.<\/p>\n<p>By Jonathan Leask of Local Democracy Reporting<\/p>\n<p>More than 100 potholes formed on the 1km section of SH1, just south of Ashburton, following heavy rain last week, closing the southbound lane over the weekend.<\/p>\n<p>Motorists vented their frustrations on social media about the state of the road between Ashburton and Timaru, including Ashburton man Matt Peers.<\/p>\n<p>&#8220;Nothing can be done, except for ripping it up and starting again,&#8221; Peers wrote on a road safety page. &#8220;Some holes would be close to knee deep.&#8221;<\/p>\n<p>Regular travellers described the road as dangerous and in dire need of repair, while several said their cars had been damaged driving the stretch of road.<\/p>\n<p>New Zealand Transport Agency&#8217;s maintenance and operations area manager, Mark Pinner said the badly damaged section, just south of Ashburton, will be repaired as soon as possible.<\/p>\n<p>He confirmed contractors completed rebuilding the 1km stretch of SH1 near Longbeach Rd in March.<\/p>\n<p>Reconstructing the road meant surfacing with a first-coat new chip seal, which is not fully waterproof, he said.<\/p>\n<p>A planned further seal was planned for next year.<\/p>\n<p>&#8216;Certainly over 100&#8217; potholes<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/07\/contractors-were-on-site-on-tuesday-filling-in-over-100-poth-FKOURANKNRE35MAJNKNHUNZYWI.jpg\" alt=\"Contractors were on site on Tuesday, filling in over 100 potholes in the 1km section of State Highway 1 south of Ashburton. (Source: Ashburton Guardian \/ Amy Riach)\" width=\"800\" height=\"450\" loading=\"lazy\"\/><\/p>\n<p class=\"ImageMetadata__MetadataParagraph-sc-hi5x8q-0 cWTYyG image-metadata\">Contractors were on site on Tuesday, filling in over 100 potholes in the 1km section of State Highway 1 south of Ashburton. (Source: Ashburton Guardian \/ Amy Riach) (Source: Supplied)<\/p>\n<p>The effects of the heavy rain last week &#8220;significantly worsened some more minor existing issues, such as rutting, on this stretch of SH1&#8221;.<\/p>\n<p>&#8220;Only in significant, or prolonged wet weather events, have we seen such extensive damage, as evident here.&#8221;<\/p>\n<p>He said the number of potholes &#8220;is certainly over 100&#8221;.<\/p>\n<p>The stop\/go traffic management remains in place and roading crews aim to make the section of SH1 safe and reopen to two lanes, he said.<\/p>\n<p>&#8220;Temporary roading repairs are expected over the next couple of weeks, ahead of permanent repairs that still need to be programmed in during better weather conditions.&#8221;<\/p>\n<p>NZTA has an ongoing plan of work to renew and strengthen the road surface during suitable summer conditions on this SH1 corridor, he said.<\/p>\n<p>&#8220;Over the next three summer seasons, subject to funding, NZTA has work programmed for renewing the road surface on most of SH1 between the Rangitata River and Ashburton, about 30km.<\/p>\n<p>&#8220;This will include digging out areas where necessary, stabilising the surface and laying new chipseal.&#8221;<\/p>\n<p>A temporary fix<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/07\/james-meager-JCGJHILYHZGW7IWMEHFVYSTEGU.png\" alt=\"James Meager. \" width=\"800\" height=\"450\" loading=\"lazy\"\/><\/p>\n<p class=\"ImageMetadata__MetadataParagraph-sc-hi5x8q-0 cWTYyG image-metadata\">James Meager.  (Source: 1News)<\/p>\n<p>Associate Transport Minister and Rangitata MP James Meager drove the stretch of SH1 regularly over the last week.<\/p>\n<p>&#8220;I have seen first-hand the poor condition of parts of SH1 between Ashburton and Timaru, particularly the section just south of Ashburton.<\/p>\n<p>&#8220;While temporary repairs are being carried out now, the longer-term answer is to properly rebuild and strengthen the road.&#8221;<\/p>\n<p>He is aware of the plans to renew the 30km stretch between the Rangitata River and Ashburton and &#8220;expects NZTA to closely oversee that work so we get a more durable and resilient State Highway 1&#8221;.<\/p>\n<p>While the state highway took a hammering, Ashburton District Council infrastructure group manager Neil McCann said there weren\u2019t any major issues on the local network from the heavy rain but &#8220;as expected, we received lots of customer requests for pothole repairs&#8221;.<\/p>\n<p>Roading crews were out inspecting roads after a week of rain and then freezing temperatures on Monday, he said.<\/p>\n<p>McCann said potholes were always reported at this time of year and contractors make temporary repairs to the worst of them.<\/p>\n<p>&#8220;Potholes are usually filled with an emulsion mix and finished with a top layer of crusher dust. This is aimed at containing the damage until wider repairs can be programmed and completed in the better spring and summer conditions.&#8221;<\/p>\n<p>Between July 1-13 the council received 28 reports of potholes, compared to 18 in June and 83 in May.<\/p>\n<p>\u2013 LDR is local body journalism co-funded by RNZ and NZ On Air.<\/p>\n","protected":false},"excerpt":{"rendered":"A stretch of State Highway 1 south of Ashburton is riddled with potholes just months after being rebuilt.&hellip;\n","protected":false},"author":2,"featured_media":525377,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[158,111,43,139,69,112],"class_list":["post-525376","post","type-post","status-publish","format-standard","has-post-thumbnail","category-new-zealand","tag-christchurch-canterbury","tag-new-zealand","tag-news","tag-newzealand","tag-nz","tag-transport"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/525376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/comments?post=525376"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/525376\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media\/525377"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media?parent=525376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/categories?post=525376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/tags?post=525376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}