{"id":594908,"date":"2026-09-09T11:20:13","date_gmt":"2026-09-09T11:20:13","guid":{"rendered":"https:\/\/www.newsbeep.com\/nz\/594908\/"},"modified":"2026-09-09T11:20:13","modified_gmt":"2026-09-09T11:20:13","slug":"south-islands-largest-wind-farm-opens-after-600m-investment","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/nz\/594908\/","title":{"rendered":"South Island&#8217;s largest wind farm opens after $600m investment"},"content":{"rendered":"<p class=\"body-paragraph articleLinkText  [&amp;_p]:tit-sub-xl tit-sub-xl md:[&amp;_p]:d-tit-sub-xl md:d-tit-sub-xl mb-[1.3rem]\">The South Island&#8217;s largest wind farm has officially opened with the ability to generate enough electricity to power 96,000 homes.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">By Tess Brunton <a href=\"https:\/\/www.rnz.co.nz\/news\/business\/1309788\/600-million-southland-wind-farm-officially-opens\" rel=\"nofollow noopener\" target=\"_blank\">of RNZ<\/a><\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">The Kaiwera Downs Wind Farm near Gore cost just over $600 million in total and was completed over two stages.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">The $486m second stage was given a green light in 2024 after Mercury signed an agreement to support Tiwai smelter.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">It added 36 additional turbines, bringing the total number to 46.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">The second stage increased its annual generation from 146GWh to 675GWh \u2013 the equivalent of powering 21,000 homes to 96,000 homes based on an average home using 7000kWh a year.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/09\/the-kaiwera-downs-wind-farm-near-gore-TZHACKUQTVALTG6JQACUY3VO6I.jpg\" alt=\"The Kaiwera Downs Wind Farm near Gore.\" width=\"800\" height=\"450\" loading=\"lazy\"\/><\/p>\n<p class=\"ImageMetadata__MetadataParagraph-sc-hi5x8q-0 cWTYyG image-metadata\">The Kaiwera Downs Wind Farm near Gore. (Source: 1News)<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Mercury chief executive Stew Hamilton said it was an important renewable energy project for the country.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;New Zealand needs an energy system that is affordable, reliable and resilient. The best way to achieve that is to keep building renewable generation at scale,&#8221; he said.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Mercury estimated work on stage two added $100m to the local and regional economy, saying stage two was built on time and on budget.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">The Kaiwera Downs Wind Farm was not expected to hold onto the title as the South Island&#8217;s largest wind farm with Contact Energy gaining approval for its 55 turbine Slopedown wind farm in eastern Southland.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Mercury was also preparing to expand its Mahinerangi Wind Farm in Otago with a $506m investment into stage two, known as Puke Kapo Hau, after it received fast track approval this year.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">That would include 40 new turbines, which would generate enough energy to power the equivalent of 76,000 homes.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/nz\/wp-content\/uploads\/2026\/09\/the-kaiwera-downs-wind-farm-near-gore-cost-just-over-dollar6-2DBQS533I5C2HPHQAJYWSBZN6I.jpg\" alt=\"The Kaiwera Downs Wind Farm near Gore cost just over $600 million to complete.\" width=\"800\" height=\"450\" loading=\"lazy\"\/><\/p>\n<p class=\"ImageMetadata__MetadataParagraph-sc-hi5x8q-0 cWTYyG image-metadata\">The Kaiwera Downs Wind Farm near Gore cost just over $600 million to complete. (Source: 1News)<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Mercury said the decision to approve the expansion was supported by a power purchase option agreement with the developer of a <a href=\"https:\/\/www.1news.co.nz\/2026\/07\/24\/southand-community-has-questions-about-35b-ai-data-centre\/\" rel=\"nofollow noopener\" target=\"_blank\">large-scale data centre in Southland<\/a>, Datagrid.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">Over the past 12 months, Hamilton said Mercury had also started generating electricity from its Kaiwaikawe Wind Farm in Northland and Ng\u0101 Tamariki Geothermal Station expansion project near Taup\u014d.<\/p>\n<p class=\"body-paragraph articleLinkText  lg mb-4\">&#8220;All three are expected to be fully operational by the end of 2026. Together, these three projects represent around $1 billion of investment and 1.1TWh of additional annual renewable generation \u2013 enough to power around 160,000 homes.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"The South Island&#8217;s largest wind farm has officially opened with the ability to generate enough electricity to power&hellip;\n","protected":false},"author":2,"featured_media":594909,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[138,1667,111,139,69,15488],"class_list":["post-594908","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-business","tag-energy","tag-new-zealand","tag-newzealand","tag-nz","tag-southland"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/594908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/comments?post=594908"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/594908\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media\/594909"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media?parent=594908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/categories?post=594908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/tags?post=594908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}