{"id":640287,"date":"2026-10-24T20:54:48","date_gmt":"2026-10-24T20:54:48","guid":{"rendered":"https:\/\/www.newsbeep.com\/nz\/640287\/"},"modified":"2026-10-24T20:54:48","modified_gmt":"2026-10-24T20:54:48","slug":"aussie-pumped-hydro-project-could-cost-12-times-more-than-first-planned","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/nz\/640287\/","title":{"rendered":"Aussie pumped hydro project could cost 12 times more than first planned"},"content":{"rendered":"<p>A pumped hydro project envisioned to save Australians money on energy bills could now cost up to 12 times more than originally planned, the government has revealed.<\/p>\n<p>Snowy Hydro 2.0, originally priced at $A2 billion ($NZ2.47b)\u00a0 in 2017 when first announced, could cost as much as $A25 billion as its builder grapples with higher labour costs and geological challenges.<\/p>\n<p>Tunnelling is now 65% done, but the scheme&#8217;s original 2021 completion date has also now blown out to late 2029, according to the update released by Energy Minister Chris Bowen and Finance Minister Katy Gallagher on Friday.<\/p>\n<p>Snowy 2.0 is expected to play a key role in Australia&#8217;s clean energy transition by helping store excess power generated by wind and solar, with Labor determined to press on amid growing calls to throw in the towel.<\/p>\n<p>&#8220;You never say never on these things,&#8221; Snowy Hydro chief executive Dennis Barnes told ABC Radio on Friday.<\/p>\n<p>&#8220;Renewables, solar and wind, backed by pumped hydro, gas, and batteries, is the cheapest grid of the future &#8230; it&#8217;s sort of inconceivable to me to picture a grid without Snowy 2.0.<\/p>\n<p>&#8220;I&#8217;m disappointed that we&#8217;re here today with this cost blowout, but I&#8217;m totally committed to seeing this project through.&#8221;<\/p>\n<p>Friday&#8217;s update comes after a reassessment undertaken because of &#8220;persistent and material cost pressures emanating from the project&#8217;s original &#8216;design immaturity&#8217;,&#8221; which the ministers&#8217; statement pinned on the previous government.<\/p>\n<p>The scheme was the brainchild of former coalition prime minister Malcolm Turnbull.<\/p>\n<p>Mr Barnes was parachuted into Snowy 2.0 during a &#8220;reset&#8221; in 2023, when the government renegotiated its agreement with Italian contractor WeBuild and its estimated cost first leapt up to $12 billion.<\/p>\n<p>The boss said despite the disappointing cost increases, the reset had done some good for the scheme&#8217;s progress.<\/p>\n<p>&#8220;In 2023, we were achieving in the order of 0.2% of progress a month, and we&#8217;re now achieving 1% of progress a month, and that&#8217;s the big difference,&#8221; Mr Barnes said.<\/p>\n<p>He also defended a $2.8 billion margin of error baked into Snowy 2.0&#8217;s latest price tag.<\/p>\n<p>&#8220;The ability to estimate the size of this project has been challenging, given the complexity and the scale of it, so we have now allowed what I believe to be a reasonable contingency,&#8221; he said.<\/p>\n<p>&#8220;Forty kilometres of tunnels, caverns that can fit the Opera House in one kilometre underground in the national park &#8211; it&#8217;s incredibly complex.&#8221;<\/p>\n<p>Potential additional project oversight to ensure it was value for money was also flagged in Friday&#8217;s update.<\/p>\n<p>&#8220;Completing Snowy 2.0 remains the responsible course &#8230; abandoning the project would undermine grid reliability, scrap 5000 jobs and lead to higher bills,&#8221; ministers Bowen and Gallagher said in their statement.<\/p>\n","protected":false},"excerpt":{"rendered":"A pumped hydro project envisioned to save Australians money on energy bills could now cost up to 12&hellip;\n","protected":false},"author":2,"featured_media":640288,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[138,219,111,139,69],"class_list":["post-640287","post","type-post","status-publish","format-standard","has-post-thumbnail","category-economy","tag-business","tag-economy","tag-new-zealand","tag-newzealand","tag-nz"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/640287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/comments?post=640287"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/posts\/640287\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media\/640288"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/media?parent=640287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/categories?post=640287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/nz\/wp-json\/wp\/v2\/tags?post=640287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}