{"id":230844,"date":"2025-10-28T21:41:13","date_gmt":"2025-10-28T21:41:13","guid":{"rendered":"https:\/\/www.newsbeep.com\/uk\/230844\/"},"modified":"2025-10-28T21:41:13","modified_gmt":"2025-10-28T21:41:13","slug":"astrobotic-delays-griffin-1-moon-mission-to-net-july-2026-spaceflight-now","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/uk\/230844\/","title":{"rendered":"Astrobotic delays Griffin-1 Moon mission to NET July 2026 \u2013 Spaceflight Now"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-71264\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2025\/10\/20251027_Griffin_development.jpg\" alt=\"\" width=\"876\" height=\"584\"  \/>Astrobotic staff examine a propulsion tank sitting in front of Griffin-1\u2019s structure. Image: Astrobotic<\/p>\n<p>Astrobotic is now eyeing the summer of 2026 for the launch of its second mission with the goal of landing on the surface of the Moon.<\/p>\n<p>On Friday, the company based in Pittsburgh, Pennsylvania, said it was targeting a launch window in July 2026 for the flight of its medium-sized class Griffin lander, notably larger compared to the Peregrine lander flown in January 2024.<\/p>\n<p>Both missions are part of NASA\u2019s Commercial Lunar Payload Services (CLPS) program, which is designed to get the agency\u2019s science instruments and technology demonstrations to the surface of the Moon. These missions are meant to help further the understanding of the Moon as NASA and its international partners prepare for human exploration through the Artemis program.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-71265\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2025\/10\/20251027_Griffin_FLIP.jpg\" alt=\"\" width=\"876\" height=\"493\"  \/>An artist\u2019s rendering of Astrobotic\u2019s Griffin Mission One lander alongside Venturi Astrolab\u2019s FLIP (FLEX Lunar Innovation Platform) rover. Graphic: Astrobotic<\/p>\n<p>Astrobotic also laid out multiple milestones it accomplished on the road to launch, including the completion of acceptance testing for its avionics flight hardware and performing \u201ca fully closed-loop simulation of the descent and landing sequence.\u201d<\/p>\n<p>Having completed acceptance testing on its shoebox-sized BEACON\u00a0(Benchmark for Engineering and Autonomous Capabilities in Operations and Navigation) rover back in July, Astrobotic said its now using a high-fidelity replica of the rover, called Flatsat, to perform joint mission development training with partner, Canada-based Mission Control.<\/p>\n<p>The mission will launch onboard a SpaceX Falcon Heavy rocket from Launch Complex 39A at NASA\u2019s Kennedy Space Center in Florida.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-71266\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2025\/10\/20251027_BEACON_small.jpeg\" alt=\"\" width=\"876\" height=\"599\"  \/>Mission Control team members test BEACON. Image: Mission Control<br \/>\nMultiple delays<\/p>\n<p>The timing of the launch of Griffin-1 was partially driven by the readiness and flight of Astrobotic\u2019s Peregrine lander, which was originally scheduled to launch in 2021 onboard United Launch Alliance\u2019s inaugural Vulcan rocket. That launch was delayed due in large part to delays stemming from the development and readiness of Blue Origin\u2019s BE-4 engines that power the Vulcan rocket.<\/p>\n<p>The Griffin-1 mission was also designed to transport NASAS\u2019s VIPER (Volatiles Investigating Polar Exploration Rover) mission to the lunar south pole. In June 2020, NASA <a href=\"https:\/\/www.nasa.gov\/news-release\/nasa-selects-astrobotic-to-fly-water-hunting-rover-to-the-moon\/\" rel=\"nofollow noopener\" target=\"_blank\">awarded<\/a> Astrobotic a $199.5 million contract to deliver its rover to the Moon in 2023.<\/p>\n<p>In a May 2021 <a href=\"https:\/\/www.nasa.gov\/solar-system\/nasa-rover-to-search-for-water-other-resources-on-moon\/\" rel=\"nofollow noopener\" target=\"_blank\">press release<\/a>, NASA said that the contract for Astrobotic had increased in value to $226.5 million. This was due to some additional requirements on the rover that altered its mass.<\/p>\n<p>All appeared to be progressing well in April 2022, which is when NASA\u2019s Office of Inspector General (OIG) published a <a href=\"https:\/\/oig.nasa.gov\/wp-content\/uploads\/2024\/02\/IG-22-010.pdf\" rel=\"nofollow noopener\" target=\"_blank\">report<\/a> stating that the spacecraft\u2019s four science instruments were on schedule and that Astrobotic officials said development of the Griffin lander \u201cremains on track to meet the current launch timetable\u201d of November 2023.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-51061 size-full\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2025\/10\/griffin_viper1.jpg\" alt=\"\" width=\"1200\" height=\"675\"  \/>Artist\u2019s concept of Astrobotic\u2019s Griffin lander with NASA\u2019s VIPER rover. Credit: Astrobotic<\/p>\n<p>However, in July 2022, NASA <a href=\"https:\/\/www.nasa.gov\/solar-system\/nasa-replans-clps-delivery-of-viper-to-2024-to-reduce-risk-2\/\" rel=\"nofollow noopener\" target=\"_blank\">announced<\/a> a delay of the mission to November 2024 because of a new mandate \u201cfor additional ground testing of the company\u2019s Griffin lunar lander.\u201d That bumped the mission cost up again, this time to $320.4 million.<\/p>\n<p>An internal review at NASA resulted in the July 2024 <a href=\"https:\/\/www.nasa.gov\/news-release\/nasa-ends-viper-project-continues-moon-exploration\/\" rel=\"nofollow noopener\" target=\"_blank\">announcement<\/a> that it was suspending further development of VIPER, stating that continuing further \u201cwould result in an increased cost that threatens cancellation or disruption to other CLPS missions.\u201d<\/p>\n<p>The agency stated that the time that Astrobotic would continue on with the Griffin-1 mission, but allowed it to pursue other payloads. The mission was determined to launch no earlier than fall 2025.<\/p>\n<p>Fast forward to February 2025, Venturi Astrolab\u2019s FLEX Lunar Innovation Platform (FLEX) rover was <a href=\"https:\/\/www.astrobotic.com\/astrolabs-flip-rover-joins-astrobotics-griffin-1-to-the-moon\/\" rel=\"nofollow noopener\" target=\"_blank\">brought onboard<\/a> as the new primary payload for the Griffin-1 mission.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-71267\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2025\/10\/20251027_FLIP_testing.jpg\" alt=\"\" width=\"876\" height=\"720\"  \/>Technicians work on Astrolab\u2019s FLIP lunar rover at the company\u2019s Hawthorne, Calif., facility. The rover, designed to deliver payloads to the Moon, is being assembled in preparation for launch on Astrobotic\u2019s Griffin-1 mission. Image: Astrolab<\/p>\n<p>\u201cAstrobotic received worldwide interest from dozens of organizations eager to fly aboard Griffin-1, and we conducted a rigorous selection process to identify the mission partner that aligned best with our timeline and Griffin\u2019s capabilities,\u201d said John Thornton, Astrobotic\u2019s founder and CEO, in February. \u201cAstrolab shares our vision of making lunar science, exploration, and commercial activity both accessible and transformative.\u201d<\/p>\n<p>As of Friday\u2019s update, Astrobotic said FLIP \u201cis undergoing developmental thermal vacuum testing, and core rover systems are integrated.\u201d It added that in the coming months, Astrolab \u201cwill complete payload integration and vehicle-level protoqualification testing.\u201d<\/p>\n<p>Meanwhile the integration of Griffin\u2019s core structure is nearly complete with things like attitude control thrusters, solar panels, ramps and pressurant tanks completing fit checks.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-71268\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2025\/10\/20251027_Griffin_primary_structure.jpg\" alt=\"\" width=\"876\" height=\"528\"  \/>Astrobots fit-check a pressurant tank with Griffin-1\u2019s primary structure. Image: Astrobotic<\/p>\n","protected":false},"excerpt":{"rendered":"Astrobotic staff examine a propulsion tank sitting in front of Griffin-1\u2019s structure. Image: Astrobotic Astrobotic is now eyeing&hellip;\n","protected":false},"author":2,"featured_media":230845,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[90,416,56,54,55],"class_list":{"0":"post-230844","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-space","8":"tag-science","9":"tag-space","10":"tag-uk","11":"tag-united-kingdom","12":"tag-unitedkingdom"},"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/230844","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/comments?post=230844"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/230844\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media\/230845"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media?parent=230844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/categories?post=230844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/tags?post=230844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}