{"id":593450,"date":"2026-05-20T00:31:11","date_gmt":"2026-05-20T00:31:11","guid":{"rendered":"https:\/\/www.newsbeep.com\/uk\/593450\/"},"modified":"2026-05-20T00:31:11","modified_gmt":"2026-05-20T00:31:11","slug":"speed-of-hs2-trains-reduced-to-control-obscene-100bn-bill","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/uk\/593450\/","title":{"rendered":"Speed of HS2 trains reduced to control \u2018obscene\u2019 \u00a3100bn bill"},"content":{"rendered":"<p id=\"7e0affa1-bb24-497a-8310-4b73ef138726\">HS2 could cost the taxpayer more than \u00a3100 billion and trains will not start running for at least another decade, ministers admitted as they signed off on the project\u2019s sixth reset in 13 years.<\/p>\n<p id=\"7e0affa1-bb24-497a-8310-4b73ef138726\">Under the new plans, HS2 trains will run more slowly and the line\u2019s opening will be delayed until at least 2036, with services not reaching central London until 2040 at the earliest.<\/p>\n<p id=\"c77243b0-d294-4366-9bba-1caaf345acf3\">Heidi Alexander, the transport secretary, told MPs that the cost increase since plans were announced was \u201cobscene\u201d. <\/p>\n<p id=\"c77243b0-d294-4366-9bba-1caaf345acf3\">\u201cIf it seems like I am angry, it\u2019s because I am,\u201d Alexander said. \u201cI am angry on behalf of passengers, who continue to wait for the new services and new opportunities they deserve.\u201d <\/p>\n<p>Rising cost<\/p>\n<p id=\"c77243b0-d294-4366-9bba-1caaf345acf3\">After an extensive review, the government announced that the total cost of the 140-mile railway between London and Birmingham was now estimated to between \u00a387.7 billion and \u00a3102.7 billion in today\u2019s money \u2014 more than \u00a3700 million a mile and dwarfing the economic boost expected to come from the new link.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\"   height=\"1929\" width=\"2894\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/05\/f2f7809a-632b-4350-8a96-410dd54309cc.jpg\" alt=\"Secretary of State for Transport Heidi Alexander leaving 10 Downing Street.\" class=\"wp-image-22365042\"\/>Heidi Alexander, the transport secretaryWiktor Szymanowicz\/Future Publishing\/Getty Images<\/p>\n<p id=\"0b428d7d-5cb9-4e22-96f2-47221ffdf1f2\">The final bill does not account for inflation, and in the models used by officials the total spend comes out at up to \u00a3112 billion.\u00a0<\/p>\n<p id=\"6cb633f2-f4b0-42b8-adc1-0f969a738046\">For every pound of taxpayer money spent on the project, it is expected to bring in just 30 pence worth of economic benefits to the UK \u2014 much lower than the figure originally forecast.\u00a0<\/p>\n<p id=\"20652bb9-b316-451f-a299-481009bacebd\">When completed, the project will be more expensive than <a href=\"https:\/\/www.thetimes.com\/us\/news-today\/article\/artemis-2-crew-astronauts-nasa-75xt7hfl6\" rel=\"nofollow noopener\" target=\"_blank\">the Artemis II mission<\/a> to send four astronauts to the moon, which is estimated to have cost \u00a369 billion so far.\u00a0<\/p>\n<p id=\"a4890002-3aa6-48fb-9a42-6b8fb73957fb\">The original cost of the project, initiated by Gordon Brown\u2019s Labour government in 2009, was estimated at \u00a337.5 billion and included now-scrapped sections going to Manchester and Leeds.<\/p>\n<p id=\"a4890002-3aa6-48fb-9a42-6b8fb73957fb\">Before Tuesday, the last official estimate in 2024 put the cost of the London-to-Birmingham route at \u00a366.6 billion. The substantial increase has been put down to inflation but also necessary work missed from the scope, underestimation and inefficient delivery.<\/p>\n<p id=\"a4890002-3aa6-48fb-9a42-6b8fb73957fb\">As of March 2026, \u00a344.2 billion has already been spent on the programme without a single bit of track being laid.<\/p>\n<p>Delayed delivery<\/p>\n<p id=\"a4890002-3aa6-48fb-9a42-6b8fb73957fb\">Trains are expected to start running between Birmingham Curzon Street and Old Oak Common station in west London between May 2036 and October 2039.\u00a0<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" height=\"2268\"   width=\"3402\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/05\/0a719601-0810-4209-a132-e868bf5597fa.jpg\" alt=\"Aerial view of the HS2 Curzon Street rail station under construction in Birmingham, England, with the city skyline in the background.\" class=\"wp-image-22364951\"\/>The HS2 Curzon Street station under construction in Birmingham last year Christopher Furlong\/Getty Images<\/p>\n<p id=\"7eadac8d-9499-43bf-a462-ab60865e7371\">The most recent official target was 2033, but originally the Conservative-led coalition government said that passenger services would be running by the end of this year.\u00a0<\/p>\n<p id=\"6204f89b-7563-4ef3-8b54-76418dad0307\">Alexander said that the full HS2 scheme, which includes trains running to a new station at London Euston in the south and Handsacre Junction in the north to merge with the West Coast Mainline, will not open until between May 2040 and December 2043.\u00a0<\/p>\n<p id=\"38393b13-9dee-4d10-8f45-f05353bd88fb\">No plans for what the station will look like at London Euston have been published and the government has said that it will seek some private finance help to fund it.\u00a0<\/p>\n<p id=\"8594d29d-aa40-43b8-81d1-d076da11e90a\">So far HS2\u2019s estimated 30,000 workers have completed all the tunnelling from between Old Oak Common and Birmingham Curzon Street but just two out of 52 viaducts had been built and just over 10 per cent of the 169 planned bridges. <\/p>\n<p id=\"e07557ba-ceac-401d-aca3-7d7ad78e6a69\">The section going to Leeds and Manchester was scrapped by the last Conservative government.<\/p>\n<p>Reduced speed<\/p>\n<p id=\"e07557ba-ceac-401d-aca3-7d7ad78e6a69\">The speed of the trains will be slower, with maximum speeds reduced to just under 200mph, about 25mph slower than originally designed but in line with <a href=\"https:\/\/www.thetimes.com\/world\/asia\/article\/buddhists-cry-blasphemy-at-plan-to-run-bullet-train-under-kyoto-3jnngx52s\" rel=\"nofollow noopener\" target=\"_blank\">the Japanese shinkansen<\/a> and other services around Europe. This is designed to save up to \u00a32.5 billion by reducing testing and commissioning times.\u00a0<\/p>\n<p id=\"94a519e7-1bd8-4408-9dd5-9a069db1c237\">However, the change will increase journey times, meaning that the new HS2 journey saves just 32 minutes compared with the current fastest central London-to-Birmingham train.\u00a0<\/p>\n<p id=\"8612df5a-4e75-4835-a980-6d4ba88e3189\">In a report commissioned by the prime minister and published on Tuesday, Sir Stephen Lovegrove, a former national security adviser, said that one of the \u201coriginal sins\u201d of the project included a decision to focus on the \u201chighest possible speeds\u201d, leading to a bespoke and highly engineered design.\u00a0<\/p>\n<p id=\"492005a7-3e3d-4fd8-b7eb-ba46adbfe34c\">Alexander blamed the Conservatives for the waste of taxpayer money, saying that previous plans were \u201cmassively over-specced folly, with the prospect of the fastest trains anywhere in the world tickling the fancy of Conservative ministers\u201d.<\/p>\n<p>Calls to cancel<\/p>\n<p id=\"492005a7-3e3d-4fd8-b7eb-ba46adbfe34c\">Ministers were said to be so concerned about the spiralling costs of the project that they asked HS2 to assess the impact of cancelling it altogether.\u00a0<\/p>\n<p id=\"7d09908c-05b0-4783-ac6f-36868700700f\">In a letter to civil servants, Mark Wild, chief executive of HS2, said that cancelling such a large project at this stage was \u201cunprecedented\u201d in the western world. This would require demolishing all built infrastructure, returning acquired land to its previous condition and potentially selling it back to original owners, he added.<\/p>\n<p id=\"7d09908c-05b0-4783-ac6f-36868700700f\">He placed the cost of this at up to \u00a358 billion, similar to the remaining budget for the entire project.\u00a0<\/p>\n<p id=\"7d09908c-05b0-4783-ac6f-36868700700f\">The transport secretary decided against doing this, saying that it would leave \u201chalf-finished structures strewn across the English countryside\u201d and deliver none of the benefits.\u00a0<\/p>\n<p id=\"7d09908c-05b0-4783-ac6f-36868700700f\">Wild, who has been in place for just over a year, said that the project had \u201cturned a corner in the last 12 months\u201d and was starting to deliver significantly improved levels of productivity. \u201cResetting HS2 was the only way to regain control of the project,\u201d he said.<\/p>\n<p id=\"3ad678b8-1e6e-4c85-832f-53755903fe72\">Jerome Mayhew, shadow transport minister, said: \u201cIt is true that the early years of the HS2 project were beset with delay and cost overruns, with HS2 Ltd failing to maintain control of the budget, and frankly, the Department for Transport allowing them to get away with it.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"HS2 could cost the taxpayer more than \u00a3100 billion and trains will not start running for at least&hellip;\n","protected":false},"author":2,"featured_media":593451,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[84,59,56,54,55],"class_list":["post-593450","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-business","tag-gb","tag-uk","tag-united-kingdom","tag-unitedkingdom"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/593450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/comments?post=593450"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/593450\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media\/593451"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media?parent=593450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/categories?post=593450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/tags?post=593450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}