{"id":596976,"date":"2026-05-21T22:50:13","date_gmt":"2026-05-21T22:50:13","guid":{"rendered":"https:\/\/www.newsbeep.com\/uk\/596976\/"},"modified":"2026-05-21T22:50:13","modified_gmt":"2026-05-21T22:50:13","slug":"gensler-designs-corten-steel-data-centre-for-phoenix","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/uk\/596976\/","title":{"rendered":"Gensler designs Corten-steel data centre for Phoenix"},"content":{"rendered":"<p>Achitecture studio <a href=\"https:\/\/www.dezeen.com\/tag\/gensler\/\" rel=\"nofollow noopener\" target=\"_blank\">Gensler<\/a> has released renderings of Thistle Data Center Campus, a hyperscale data centre in <a href=\"https:\/\/www.dezeen.com\/tag\/arizona\/\" rel=\"nofollow noopener\" target=\"_blank\">Arizona<\/a>, USA, with a weathering steel facade.<\/p>\n<p>Designed for developer <a href=\"https:\/\/menlo-digital.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Menlo Digital<\/a>, the Thistle Data Center Campus is planned for the site of a former call center in an industrial area of Arizona&#8217;s capital and largest city.<\/p>\n<p>It will consist of five data centres with 36 to 72 megawatt capacity spread over the 1,000,000-square-foot campus.<\/p>\n<p>The design team at <a href=\"https:\/\/www.gensler.com\/\" rel=\"nofollow noopener\" target=\"_blank\">Gensler<\/a> wanted to create a building that would improve the appearance of the industrial site for residents in the surrounding area. Most of the current use revolves around surface parking.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-2329754 size-full\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/05\/gensler-thistle-data-center-arizona-corten_dezeen_2364_col_2-852x572.jpg\" alt=\"Rendering of data center with Corten steel\" width=\"2364\" height=\"1586\"   loading=\"lazy\"\/>Gensler has designed the Thistle Data Center Campus \u00a0in Arizona<\/p>\n<p>&#8220;Making something that people genuinely want to look at, that adds something positive to the visual character of a neighborhood is within our power and purview as architects, it&#8217;s part of our duty,&#8221; Gensler design director Geofrey Diamond told Dezeen.<\/p>\n<p>&#8220;The project offers a meaningful civic contribution, rather than a fringe benefit.&#8221;<\/p>\n<p>To do this, Gensler decided to use a material palette akin to the elements of the arid climate, with red-orange weathering steel panels punctuating the facade and forming canopies over parts of the building and textured concrete for the primary cladding.<\/p>\n<p>Since as much as 20 per cent of the interior may be used for office space and amenities, the entrance ways will feature recessed glass curtain walls and windows punctuated by bands of weathering steel.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-2329755 size-full\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/05\/gensler-thistle-data-center-arizona-corten_dezeen_2364_col_3-852x572.jpg\" alt=\"Gensler Corten-steel clad data center\" width=\"2364\" height=\"1586\"   loading=\"lazy\"\/>Gensler has selected Corten-steel cladding and textured complex to fit into the desert vernacular<\/p>\n<p>But at the end of the day, the building needs to function properly to host the servers that will enable the centre to operate efficiently for tenants, who will likely be running complex AI or cloud data infrastructures.<\/p>\n<p>Flexibility of function is also a priority as the project kicks off.<\/p>\n<p>&#8220;We want to build a lot of flexibility into the interiors of the space, because the developer needs a building that could work for multiple kinds of clients,&#8221; Gensler technical director and global leader of critical facilities Rob LoBuono told Dezeen.<\/p>\n<p>&#8220;We are building on the idea of keeping it operational for 20 to 30 years.&#8221;<\/p>\n<p><img decoding=\"async\" class=\"wp-image-2329752 size-full\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/05\/gensler-thistle-data-center-arizona-corten_dezeen_2364_col_0-852x1527.jpg\" alt=\"Thistle Data Center Campus by Gensler\" width=\"1319\" height=\"2364\"   loading=\"lazy\"\/>The project will be sited on an industrial site<\/p>\n<p>This flexibility will be tempered by the security concerns of the facility, which means that few people outside of employees or contractors will see the inside of the facility.<\/p>\n<p>&#8220;We have to find other ways to make a genuine contribution,&#8221; said Diamond.<\/p>\n<p>&#8220;Here, the developer is providing a generously amenitized public open space at the north end of the campus.&#8221;<\/p>\n<p>\t\t\t\t\t\t<a href=\"https:\/\/www.dezeen.com\/2026\/05\/15\/stratos-data-center-designs-gensler-utah\/\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n\t\t\t\t\t\t<img width=\"191\" height=\"191\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/05\/gensler-stratos-data-center-utah_dezeen_2364_sq-191x191.jpg\" class=\"excludeLightbox wp-post-image\" alt=\"Stratos Data Center Utah\" decoding=\"async\" data-pin-nopin=\"true\"   loading=\"lazy\"\/><\/p>\n<p> First images of Gensler-designed 60-building data centre development in Utah revealed\n\t\t\t\t\t\t<\/p>\n<p>\t\t\t\t\t\t<\/a><\/p>\n<p>This energy usage, as well as questions of water and land, have been <a href=\"https:\/\/www.dezeen.com\/2025\/04\/25\/ai-data-centre-demand-energy-transition\/\" rel=\"nofollow noopener\" target=\"_blank\">items of concern from the architecture community<\/a> and <a href=\"https:\/\/www.theguardian.com\/us-news\/2025\/dec\/08\/us-data-centers\" rel=\"nofollow noopener\" target=\"_blank\">environmental groups<\/a>, as developers try to keep up with the demand of developers for more computational power.<\/p>\n<p>&#8220;Until the physics of electricity and computing change, the infrastructure inside is always going to be resource-intensive,&#8221; said Diamond. &#8220;That&#8217;s just the reality of critical infrastructure.&#8221;<\/p>\n<p>&#8220;Power plants, water treatment facilities, hospitals, data centers \u2013 these are energy-intensive by necessity, and for now, our job as architects is to mitigate that intensity as aggressively as we can through the building components we have control over,&#8221; he continued.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-2329756 size-full\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/05\/gensler-thistle-data-center-arizona-corten_dezeen_2364_col_4-852x475.jpg\" alt=\"Thistle Data Center Campus by Gensler\" width=\"2364\" height=\"1319\"   loading=\"lazy\"\/>Gensler built flexibility into the design<\/p>\n<p>Diamond said that the potential for experimentation in energy transfer back to the grid as well as dialled-in, closed-loop water systems and the use of brownfields for data centres are all potential avenues for these structures to become more environmentally friendly.<\/p>\n<p>Gensler was also revealed last week as the architect behind the massive <a href=\"https:\/\/www.dezeen.com\/2026\/05\/15\/stratos-data-center-designs-gensler-utah\/\" rel=\"nofollow noopener\" target=\"_blank\">Stratos Hyperscale Data Center in Utah<\/a>, developed by Utah governmental organisation MIDA and development firm O&#8217;Leary Digital.<\/p>\n<p>Recently, a group of researchers released a study showing that hyperscale data centre<a href=\"https:\/\/www.dezeen.com\/2026\/04\/09\/data-centres-heat-island-effect-study\/\" rel=\"nofollow noopener\" target=\"_blank\">s may create heat islands in their vicinity<\/a>, while <a href=\"https:\/\/www.dezeen.com\/2026\/04\/21\/atkinsrealis-nvidia-nuclear-powered-data-centres\/\" rel=\"nofollow noopener\" target=\"_blank\">AtkinsR\u00e9alis and Nvidia<\/a> pitched the idea of plugging small on-site nuclear reactors to data centres to take pressure off of energy grids.<\/p>\n<p>The imagery is courtesy of Gensler.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"Achitecture studio Gensler has released renderings of Thistle Data Center Campus, a hyperscale data centre in Arizona, USA,&hellip;\n","protected":false},"author":2,"featured_media":596977,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[6225,6485,6486,1120,96,40339,40340,56,54,55],"class_list":["post-596976","post","type-post","status-publish","format-standard","has-post-thumbnail","category-arts-and-design","tag-arts","tag-arts-and-design","tag-artsanddesign","tag-design","tag-entertainment","tag-sectionall","tag-sectionarchitecture","tag-uk","tag-united-kingdom","tag-unitedkingdom"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/596976","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/comments?post=596976"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/596976\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media\/596977"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media?parent=596976"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/categories?post=596976"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/tags?post=596976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}