{"id":697758,"date":"2026-07-18T03:15:19","date_gmt":"2026-07-18T03:15:19","guid":{"rendered":"https:\/\/www.newsbeep.com\/uk\/697758\/"},"modified":"2026-07-18T03:15:19","modified_gmt":"2026-07-18T03:15:19","slug":"live-sector-reactions-flexible-collections-delayed-to-2030","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/uk\/697758\/","title":{"rendered":"LIVE SECTOR REACTIONS: Flexible collections delayed to 2030"},"content":{"rendered":"<p>All local authorities in England were expected to start collecting these materials from the kerbside from 31 March 2027 under the Simpler Recycling regulations.<\/p>\n<p>Reactions from the industry have varied, with some grateful for the pressure it may take off local authorities while others have lamented the last-minute change.<\/p>\n<p>Find out more about the update <a href=\"https:\/\/www.letsrecycle.com\/news\/simpler-recycling-flexible-collections-to-be-delayed-to-2030\/\" rel=\"nofollow noopener\" target=\"_blank\">here<\/a> and see how the industry has responded below.<\/p>\n<p>HAHN Plastics UK<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-252997 alignright\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" width=\"261\" height=\"100\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/HANH-Plastics.png\"\/><\/p>\n<p>Noel Marques-Neves, Operations Director at HAHN Plastics UK, said: \u201cNaturally, it\u2019s disappointing to see the rollout of household flexible plastics collections delayed, as increasing the amount of material we collect and recycle remains an important step towards building a more circular economy. However, at HAHN, we have been vocal for some time that collection is only part of the solution, and we envisaged a real issue if the Government didn\u2019t consider the wider infrastructure requirements. Without the right investment across sorting, reprocessing and end markets, there was a real risk that the waste sector would struggle to keep pace with additional material entering the system.<\/p>\n<p>\u201cThe additional time now provides an important opportunity for the industry to build the infrastructure needed to make Flex Collect a long-term success. Over the last two years, we\u2019ve worked alongside waste operators, manufacturers and industry partners to help prepare for these changes, and there is already valuable learning that can be built upon. The priority should now be using this time to strengthen supply chains, expand processing capacity and ensure the whole recycling system is ready before collections begin.<\/p>\n<p>\u201cWe continue to believe that recycling infrastructure deserves the same strategic focus as other forms of critical national infrastructure. By using the coming years to invest across the entire recycling supply chain, the UK has the opportunity to create a more resilient system that both collects more flexible plastics, and ensures they are recycled into valuable new products.\u201d<\/p>\n<p>Reconomy<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-253006\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" width=\"300\" height=\"200\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/David-Gudgeon-300x200.jpg\"\/>David Gudgeon, Reconomy<\/p>\n<p>David Gudgeon, Head of External Affairs at Reconomy, said: \u201cWhile the delay is not entirely surprising given the widely documented lack of infrastructure for flexible plastic recycling, it is disappointing given that it was included in the original guidance published in 2024 and for businesses across the sector, including Reconomy, who have been investing to strengthen domestic infrastructure.<\/p>\n<p>\u201cIt does little to support business confidence and also raises questions over whether Scotland and Wales will follow suit and whether we will see further policy divergence across the UK.<\/p>\n<p>\u201cThe key now is for the Government to provide policy certainty, giving operators like us the confidence to continue investing in the infrastructure needed to recycle this material domestically and build a truly circular economy.\u201d<\/p>\n<p>Suez UK<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-252994\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" width=\"225\" height=\"300\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/SHH-hehot-Feb-2023-1-1-225x300.jpg\"\/>Stuart Hayward-Higham, Suez UK<\/p>\n<p>Stuart Hayward-Higham, Chief Technical Development and Innovation Officer for SUEZ in the UK, said: \u201cDuring the FlexCollect project our team saw firsthand the public\u2019s enthusiasm for recycling flexible plastics but we also saw the lack of homegrown reprocessing infrastructure to meet the full demand. With many businesses still yet to fully embrace the first phase of Simpler Recycling and business collections falling outside the EPR regime, delaying the roll out of mandatory collections of flexible plastics for businesses makes good sense, allowing time for the UK to develop the necessary reprocessing infrastructure.<\/p>\n<p>\u201cHowever, any impact to the growing momentum we have seen behind household collections of flexibles and planned investments in that remaining missing infrastructure, risks undermining confidence in the UK market and the pace of infrastructure development. We hope that authorities rolling out collections from now can continue to do so with the full support of EPR payments as significant recycling capacity is in place or is in development.<\/p>\n<p>\u201cWith flexible plastics representing a major source of fossil carbon in our residual waste, this delay must also be considered when deciding the timeline for the expansion of the Emissions Trading Scheme to include energy-from-waste.\u201d<\/p>\n<p>The Environmental Services Association (ESA)<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-180237\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Jacob Hayler\" width=\"300\" height=\"200\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/Jacob-Hayler1-e1610989218343-300x200.png\"\/>Jacob Hayler, ESA<\/p>\n<p>Executive Director of the ESA, Jacob Hayler, said: \u201cMaximising opportunities for recycling, and moving as much waste material up the waste hierarchy as possible, are critical steps towards achieving our sectoral ambitions to eliminate avoidable waste and achieve net-zero emissions by 2040.<\/p>\n<p>\u201cWhile we remain committed to these important ambitions, a delay to the inclusion of flexible packaging and plastic films under the Simpler Recycling regime is the correct decision given the lack of market capacity for these materials and demand-side drivers \u2013 issues that the ESA has raised repeatedly for years now.<\/p>\n<p>\u201cIt is essential that Government uses the next three years to create investor confidence; deliver domestic reprocessing capacity and ensure that sufficient end-market demand exists to allow these materials to be effectively returned to the circular economy.\u201d<\/p>\n<p>WRAP<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-253014\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Adam Herriott, WRAP\" width=\"200\" height=\"300\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/WhatsApp-Image-2026-07-17-at-14.08.09-200x300.jpeg\"\/>Adam Herriott, WRAP<\/p>\n<p>Adam Herriott, Interim Head of Packaging at WRAP, said: \u201cSimpler Recycling remains one of the most significant reforms to England\u2019s recycling system in a generation. While the latest announcement changes the timetable for mandatory household collections of flexible plastics, it does not change the long-term ambition to collect and recycle more of this material.<\/p>\n<p>\u201cWRAP will continue working with government, local authorities, producers and the recycling sector to support the transition. Through the UK Packaging Pact, we will continue to bring industry together to improve packaging design, strengthen collection and recycling systems, build confidence for investment in recycling infrastructure. Ensuring collection, sorting, recycling capacity and end markets continue to develop together.<\/p>\n<p>\u201cThis collaborative approach will help ensure that, when mandatory collections are introduced, they deliver the environmental outcomes they are intended to achieve. In the meantime, local authorities and waste collectors that already collect flexible plastics, or are preparing to introduce collections, should absolutely continue to do so.<\/p>\n<p>\u201cThe delay should not be used to simply sit back and do nothing, rather redouble our efforts to ensure that an effective flexible plastic recycling system is implemented.\u201d<\/p>\n<p>Robbie Staniforth (Ecosurety)<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"wp-image-252963 \" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" width=\"273\" height=\"273\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/Robbie-Staniforth-Ecosurety-300x300.jpg\"\/>Robbie Staniforth, Ecosurety<\/p>\n<p>Robbie Staniforth, Chief Policy and Impact Officer at Ecosurety and Co-Host of the Talking Rubbish podcast, said: \u201cJust when I thought the 2-1 semi-final loss was the worst thing to happen to England this week, we get this announcement. Further delaying mandated collections will not in itself create end-markets. The markets have had four years of advanced warning and throughout that period investor confidence in flexible plastic recycling remained low. Today, that investor position has been justified. Delaying for a further three years is unlikely to improve their confidence.<\/p>\n<p>\u201cOnce again, industry is left with the chicken and egg dilemma of whether to build reprocessing facilities before collecting material or vice versa. Obviously, the solution is to develop collections, sorting and reprocessing in lockstep to ensure we do not build \u2018white elephant\u2019 recycling plants, nor begin \u2018recycling\u2019 collections that end up getting burnt for energy. This announcement should prompt soul searching for those closely involved, including myself, to understand what has gone so wrong and how we can ensure mistakes of the past are not repeated.<\/p>\n<p>\u201cLooking back at the 2018 Resources and Waste Strategy now, a pattern has emerged. The bold ambitions outlined have not been followed up with quick enough action, causing almost all of the policies to be delayed or abandoned. Against such a backdrop, it is no surprise that private enterprise has not delivered new infrastructure.<\/p>\n<p>\u201cHowever, we are pleased that Government has recognised the need to immediately reconvene stakeholders to kick-start the work this Autumn. We will continue to engage directly and advocate for a new future that includes the genuine recycling of flexible plastic packaging.\u201d<\/p>\n<p>Local Authority Recycling Advisory Committee (LARAC)<\/p>\n<p>LARAC has welcomed the Government\u2019s decision to delay the mandatory collection of plastic films and flexible packaging from households and businesses in England until 1 April 2030.<\/p>\n<p>The delay is a position that LARAC members have consistently called for through the Defra Change Network sessions and wider policy engagement. Local authorities have repeatedly raised concerns about the lack of established domestic end markets, the readiness of sorting and reprocessing infrastructure, and the significant financial and operational implications of introducing these collections.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-248740\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Gareth Rollings, LARAC, West Sussex County Council\" width=\"227\" height=\"264\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/Gareth-Rollings-LARAC-1.png\"\/>Gareth Rollings, LARAC<\/p>\n<p>LARAC said that the additional three years will give local authorities more time to plan and prepare for the effective collection of this material, while recognising that some councils have already introduced kerbside schemes.<\/p>\n<p>LARAC also hopes the revised timetable will allow the Government and the wider recycling sector to develop sufficient sorting and recycling capacity within the UK, reducing reliance on export and other potentially non-circular solutions.<\/p>\n<p>Gareth Rollings, Chair of LARAC, said: \u201cLARAC welcomes the Government\u2019s intention to move the mandatory collection date for plastic films and flexibles to 1 April 2030. This reflects the concerns that our members have consistently raised about the readiness of the wider system and the financial and operational consequences for local authorities.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-238650\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" width=\"271\" height=\"250\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/07\/toni_mcnamara_cropped.jpg\"\/>Toni McNamara, LARAC<\/p>\n<p>\u201cCouncils remain committed to delivering effective recycling services, but they need a system that is properly funded and supported by viable sorting, reprocessing and end-market capacity. The additional three years must now be used constructively by government and industry to build that infrastructure and provide local authorities with the clarity they need to plan.\u201d<\/p>\n<p>Toni McNamara, Executive Director of LARAC, added: \u201cWe are pleased that the views shared by LARAC members through the DEFRA Change Networks and wider policy discussions have been heard. We look forward to working with DEFRA as the legislation and implementation arrangements are developed.\u201d<\/p>\n<p>This is a live reactions piece and will be continually updated. Want to see your reaction here? Email\u202fsavannah.c@letsrecycle.com.<\/p>\n","protected":false},"excerpt":{"rendered":"All local authorities in England were expected to start collecting these materials from the kerbside from 31 March&hellip;\n","protected":false},"author":2,"featured_media":697759,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[1397,90,56,54,55],"class_list":["post-697758","post","type-post","status-publish","format-standard","has-post-thumbnail","category-environment","tag-environment","tag-science","tag-uk","tag-united-kingdom","tag-unitedkingdom"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/697758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/comments?post=697758"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/697758\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media\/697759"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media?parent=697758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/categories?post=697758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/tags?post=697758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}