{"id":786744,"date":"2026-09-29T21:08:12","date_gmt":"2026-09-29T21:08:12","guid":{"rendered":"https:\/\/www.newsbeep.com\/uk\/786744\/"},"modified":"2026-09-29T21:08:12","modified_gmt":"2026-09-29T21:08:12","slug":"hs2-solves-the-elizabeth-lines-step-free-problem-at-old-oak-common-station","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/uk\/786744\/","title":{"rendered":"HS2 solves the Elizabeth line\u2019s step-free problem at Old Oak Common station"},"content":{"rendered":"<p>Elizabeth line passengers will be able to board trains at Old Oak Common without the usual step up from the platform, after the government approved a redesign that lowers the tracks serving the station\u2019s four Elizabeth line platforms.<\/p>\n<p><a href=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/09\/Old-Oak-Platforms.jpg\" class=\"lightbox\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-large wp-image-92904 leaderimagetop\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/09\/Old-Oak-Platforms.jpg\" alt=\"\" width=\"1800\" height=\"1200\" data-eio=\"p\"\/><\/a>Old Oak Common surface platforms concept image (c) HS2<\/p>\n<p>Conventionally, national rail platforms are set to a standard height above the rails of 915mm, to allow for a wide range of trains to be able to use them \u2013 from passenger to freight to engineering. That was a legacy of how the railways evolved over the centuries, with different companies building to different standards \u2013 so 915mm was chosen as a middle compromise. However, it usually means a vertical gap for passengers at many stations.<\/p>\n<p><a href=\"https:\/\/www.ianvisits.co.uk\/articles\/wp-content\/uploads\/sites\/2\/2026\/09\/ingatestone-station-06.jpg\" class=\"lightbox\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-92903\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" width=\"605\" height=\"404\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/09\/ingatestone-station-06-1024x683.jpg\"\/><\/a>A typical station gap \u2013 at Ingatestone station (c) ianVisits<\/p>\n<p>In 2018, when the Elizabeth line was under construction, it received a <a href=\"https:\/\/www.gov.uk\/government\/publications\/rail-interoperability-exemptions-and-decisions\/rail-interoperability-exemptions-and-decisions?utm_source=chatgpt.com\" rel=\"nofollow noopener\" target=\"_blank\">special exemption<\/a> from the rules for its new central London stations to ensure step-free access at the platform doors. This restricted the railway\u2019s flexibility to serve other trains, but since that was never expected anyway, it was deemed a sensible decision.<\/p>\n<p>However, we come to Old Oak Common station.<\/p>\n<p>Here, the national rail platforms are \u2013 or were \u2013 being built to the UK national standard, but that would mean Elizabeth line trains would need a manual ramp to offer step-free access to passengers. While that\u2019s routine at many stations, the sheer volume of passengers expected to change to and from the Elizabeth line at <a href=\"https:\/\/www.ianvisits.co.uk\/articles\/tag\/old-oak-common-station\/\" rel=\"nofollow noopener\" target=\"_blank\">Old Oak Common<\/a> would require many ramps and staff, and trains would need more time at the platform, slowing down the service.<\/p>\n<p><a href=\"https:\/\/www.ianvisits.co.uk\/articles\/wp-content\/uploads\/sites\/2\/2024\/02\/london-overground-london-bridge-test-05.jpg\" class=\"lightbox\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-70518 size-large\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" width=\"605\" height=\"336\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/09\/london-overground-london-bridge-test-05-1024x569.jpg\"\/><\/a>Typical platform ramp (c) ianVisits<\/p>\n<p>Transport for London (TfL) raised this issue a few years ago when it became apparent that Old Oak Common would be the <a href=\"https:\/\/www.ianvisits.co.uk\/articles\/tag\/hs2\/\" rel=\"nofollow noopener\" target=\"_blank\">HS2 terminus<\/a> and therefore much busier than originally planned. TfL says Elizabeth line passengers are expected to make up around 90 per cent of interchanges at Old Oak Common, so enabling step-free access was a significant passenger issue that needed resolving. Talks have been underway since then to find a solution, and <a href=\"https:\/\/www.ianvisits.co.uk\/articles\/inside-old-oak-common-as-londons-new-14-platform-station-takes-shape-91856\/\" rel=\"nofollow noopener\" target=\"_blank\">at a site visit<\/a> in August, an HS2 spokesperson confirmed to ianVisits they had found one but were awaiting final sign-off.<\/p>\n<p>That solution is not to raise the platform, but to lower the railway.<\/p>\n<p>Raising the platforms would have meant redesigning all the other station infrastructure, such as lifts, stairs and escalators. But by lowering the railway track, they can build all the platforms and associated equipment to the same specification.<\/p>\n<p>The track at Platforms 5 to 8 will be lowered, and the station will use a solid concrete slab track through the station rather than ballast.<\/p>\n<p>These changes mean the station can offer fully step-free access for Elizabeth line trains at those platforms.<\/p>\n<p>Although in practice the station signs would presume that <a href=\"https:\/\/www.ianvisits.co.uk\/articles\/tag\/crossrail-elizabeth-line\/\" rel=\"nofollow noopener\" target=\"_blank\">Elizabeth line trains<\/a> would call at platforms 5-8 and national rail services would use platforms 1-4, the station was designed so any train could use any platform.<\/p>\n<p>The change doesn\u2019t fully alter that, and an HS2 spokesperson confirmed to ianVisits that the new Elizabeth line tracks and platforms will be designed to allow compatible passenger and freight services to use the relief line platforms when required.<\/p>\n<p>However, if those trains stop at the station, passengers will have to step up to the platform (or down to the train), rather than the other way round as is common at most other stations. Because platform ramps are designed for a gap where the train is higher than the platform, passenger assistance will be provided if GWR or Heathrow Express trains have to use the Elizabeth line platforms.<\/p>\n<p>But those should be rare, such as when engineering work means a national rail platform is out of use. The wider benefit is that thousands of passengers swapping between HS2 and the Elizabeth line will have fully step-free access between the platform and the train.<\/p>\n<p>Andy Lord, London\u2019s Transport Commissioner, said: \u201cElizabeth line passengers are expected to account for around 90 per cent of interchanges at Old Oak Common, so level boarding is vital for the safety and accessibility of our customers.<\/p>\n<p>\u201cThe platforms will also be step-free from the street, benefitting local residents as well as those travelling through the station, and supporting the growth in homes planned in the area.<\/p>\n<p>\u201cThe solution that has been achieved highlights the importance of collaboration in the rail industry and with stakeholders, and it is fantastic news that Old Oak Common will join the Elizabeth line\u2019s 41 stations that provide step-free access.\u201d<\/p>\n<p>The decision follows technical and accessibility work by HS2, Network Rail, TfL and the Department for Transport, with input from train operators and accessibility groups.<\/p>\n","protected":false},"excerpt":{"rendered":"Elizabeth line passengers will be able to board trains at Old Oak Common without the usual step up&hellip;\n","protected":false},"author":2,"featured_media":786745,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[84,59,56,54,55],"class_list":["post-786744","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-business","tag-gb","tag-uk","tag-united-kingdom","tag-unitedkingdom"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/786744","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/comments?post=786744"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/786744\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media\/786745"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media?parent=786744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/categories?post=786744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/tags?post=786744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}