{"id":792546,"date":"2026-10-05T09:58:18","date_gmt":"2026-10-05T09:58:18","guid":{"rendered":"https:\/\/www.newsbeep.com\/uk\/792546\/"},"modified":"2026-10-05T09:58:18","modified_gmt":"2026-10-05T09:58:18","slug":"carmody-groarkes-design-museum-gent-opens-to-the-public","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/uk\/792546\/","title":{"rendered":"Carmody Groarke\u2019s Design Museum Gent opens to the public"},"content":{"rendered":"<p class=\"p1\">Carmody Groarke\u2019s extension of the Design Museum Gent, first revealed in 2019, opened its doors to the public this weekend (Saturday 3 October). The London-based practice collaborated with local practice <a href=\"https:\/\/www.architectsjournal.co.uk\/buildings\/atama-riffs-off-brutalist-language-in-rework-of-1970s-former-town-hall\" rel=\"nofollow noopener\" target=\"_blank\">ATAMA<\/a> (formerly TRANS architectuur|stedenbouw) and Belgian heritage specialist <a href=\"https:\/\/www.re-st.be\/\" rel=\"nofollow noopener\" target=\"_blank\">RE-ST<\/a>.<\/p>\n<p>The 2,200m2 wing building sits on an unused 372m\u00b2 piece of land next to the museum on Drabstraat, completing the fourth side of the museum\u2019s courtyard.<\/p>\n<p>Design Museum Gent, Flanders\u2019 only museum of design and Belgium\u2019s largest, sits in the city\u2019s historical heart and occupies three buildings: Hotel de Coninck, an 18th-century town mansion; a wing built in 1992; and Huis Leten with a 16th-century core housing the museum\u2019s offices. The new wing unites this existing complex of buildings.<\/p>\n<p>The development also refurbished existing spaces \u2013 with interiors carefully restored \u2013 and includes a new caf\u00e9 within Huis Leten, as well as 210m2 of additional exhibition space.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-842361\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/10\/21_Carmody-Groarke_Design_Museum_Ghent_@Johan_Dehlin_251125-scaled.jpg\" alt=\"\" width=\"2560\" height=\"2048\"  \/><\/p>\n<p>The new wing is split into six zones. Its white-brick form \u2013 constructed from a lime-cured brick \u2013 looks towards the historic city centre and is divided into four pitch forms, opening views of Ghent\u2019s white-stone landmarks including its UNESCO-listed Belfry.<\/p>\n<p>At the centre of the building is a sculptural timber stair inspired by the grand stair of Hotel de Coninck.<\/p>\n<p>Alongside galleries and collection facilities, the renewed museum has spaces for debates, workshops, lectures, education, co-creation and hospitality. At the entrance is a 3D-printed aluminium gate, designed by Antwerp-based studio Unfold, which takes the form of a curtain.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-842363\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/10\/33_Carmody_Groarke_Design_Museum_Ghent_2_@Johan_Dehlin_260923-scaled.jpg\" alt=\"\" width=\"2560\" height=\"2048\"  \/><\/p>\n<p>The two-stage \u2018Baumeister\u2019 competition for the project was run by the Flemish Government Architect in 2019 as part of its biannual open call for teams to complete a range of major public schemes. <a href=\"https:\/\/www.architectsjournal.co.uk\/news\/carmody-groarke-wins-contest-to-extend-ghents-design-museum\" rel=\"nofollow noopener\" target=\"_blank\">Carmody Groarke<\/a> was chosen ahead of designs by four other firms, including fellow UK outfit Assemble.<\/p>\n<p>By June 2021, the winning scheme had <a href=\"https:\/\/www.architectsjournal.co.uk\/news\/carmody-groarke-reveals-refined-designs-of-ghent-design-museum-extension\" rel=\"nofollow noopener\" target=\"_blank\">evolved<\/a>\u00a0to include a cross-laminated timber structure and a prototype low-carbon facing brick: the <a href=\"https:\/\/www.architectsjournal.co.uk\/specification\/in-practice-how-carmody-groarke-developed-a-low-carbon-brick\" rel=\"nofollow noopener\" target=\"_blank\">Gent Waste Brick<\/a>. The project\u2019s total budget was \u20ac15 million.<\/p>\n<p>The bricks were produced in collaboration with BC Materials, Local Works Studio, as well as the practice and ATAMA.\u00a0They were made using mineral construction waste sourced from municipal and local building waste streams, all within 8km of the site. Ingredients include pulverised concrete, porcelain and glass, together with material recovered during the museum\u2019s transformation.\u00a0Rather than being kiln-fired, they are cured using hydrated lime.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-842367\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/10\/Circulation_10_Carmody_Groarke_Design_Museum_Ghent_2_@Johan_Dehlin_260923-scaled.jpg\" alt=\"\" width=\"2560\" height=\"2048\"  \/><\/p>\n<p class=\"wp-caption-text\">Circulation<\/p>\n<p class=\"inline_image_source\" style=\"font-size:12px; max-width: 2570px;\">Source: Johan Dehlin<\/p>\n<p>The new wing\u2019s timber superstructure is wrapped in hemp insulation and clad in 82,000 Gent Waste Bricks, which in turn informed its architecture through deep window reveals, projecting copings, sills and pronounced roof edges to protect the soft material from weathering. Their dimensions also match those of the Hotel de Coninck.<\/p>\n<p>In 2020, the project\u2019s backer won funding from Circular Flanders and OVAM (Public Waste Agency of Flanders) to develop and carry out research into the facing brick.<\/p>\n<p>The prototype bricks significantly reduced carbon emissions during both the production process and the bricks\u2019 entire lifetime. The bricks were then lab-tested to verify compliance with requirements such as frost resistance and strength.<\/p>\n<p>A full-size mock-up of various samples of the test bricks, timber structure and zinc roof, was on display at the museum\u2019s historic courtyard until 2022.<\/p>\n<p>DE40, a panel of 40 Ghent residents, contributed to discussions around accessibility, programming and the museum\u2019s civic identity.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-842376\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/10\/Entrance-gate-by-Unfold_12_Carmody_Groarke_Design_Museum_Ghent_2_@Johan_Dehlin_260923-scaled.jpg\" alt=\"\" width=\"2560\" height=\"2048\"  \/><\/p>\n<p class=\"wp-caption-text\">Entrance gate by Unfold<\/p>\n<p class=\"inline_image_source\" style=\"font-size:12px; max-width: 2570px;\">Source: Johan Dehlin<\/p>\n<p>Architect\u2019s view<\/p>\n<p>Sustainability has been a key driver from the outset, our guiding principle being that the most effective way to reduce carbon in construction is through the combined approach of retention, adaptation and strategic extension of existing building fabric. For the Design Museum Gent, this has simultaneously meant safeguarding historically and culturally significant buildings and providing the institution with a flexible, future-proof home.<\/p>\n<p>In Hotel De Connick and Huis Leten, the museum\u2019s two oldest wings, careful restoration and refurbishment have extended the buildings\u2019 lifespan. In the 1992 wing, the gallery has been optimised and repurposed. A draughty floor void running from basement to roof has been infilled at every level with CLT slabs, creating significantly more usable space and allowing more efficient and flexible environmental conditioning. In the new wing, sustainability was a core consideration in both construction and purpose. This commitment to low-carbon design is expressed in the new wing\u2019s mass timber frame and its fa\u00e7ade, clad in Gent Waste Bricks: a bespoke, low-carbon material developed through an extensive research and development project using local municipal waste.<\/p>\n<p>Social and civic responsibility is deeply embedded in the museum\u2019s vision for expansion. The new wing is designed as a series of highly flexible spaces that support the institution\u2019s evolving role in the city. Significant improvements to circulation and accessibility allow it to operate as a welcoming, free-to-enter third space, hosting lectures, workshops, temporary exhibitions, education initiatives and hospitality as part of a newly expanded public programme. DE40 \u2013 a citizens\u2019 panel of 40 residents \u2013 contributed to discussions and consultations on accessibility, programming and civic identity, which were instrumental in shaping the museum\u2019s relationship to the city, both institutionally and physically.<\/p>\n<p>Carmody Groarke<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-842396\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/10\/08-HERO-SHOT-Bricks_RomaninNoceto_LowResolution_60.webp\" alt=\"\" width=\"1800\" height=\"1201\"  \/><\/p>\n<p class=\"wp-caption-text\">Gent Waste Bricks<\/p>\n<p class=\"inline_image_source\" style=\"font-size:12px; max-width: 1810px;\">Source: Romanin Noceto<\/p>\n<p>Client\u2019s view<\/p>\n<p>This expansion and renovation are not about creating more museum, but about creating more than a museum: a community sense-making museum with real social relevance, right at the heart of a diverse and complex society.<\/p>\n<p>Katrien Laporte, director, Design Museum Gent<\/p>\n<p class=\"picture\">\u00a0<img decoding=\"async\" class=\"wp-image-842561\" src=\"https:\/\/www.newsbeep.com\/uk\/wp-content\/uploads\/2026\/10\/DesignMuseumGent-CGA-plan-Ground-Floor-1to125-Rev-B-scaled.webp\" alt=\"\" width=\"660\"  \/><\/p>\n<p>Project data<\/p>\n<p>Location Ghent, Belgium<br \/>Start on site May 2023<br \/>Completion date October 2026<br \/>Gross internal floor area 8,632m2 (new wing: 2,135m2)<br \/>Construction cost Undisclosed<br \/>Architect Carmody Groarke, ATAMA, RE-ST<br \/>Client Sogent (delegated contracting authority commissioned by the City of Ghent), Design Museum Gent<br \/>Structural engineer Ney &amp; Partners<br \/>MEP consultant Boydens Engineering<br \/>Services engineer SWECO<br \/>Quantity surveyor ATAMA<br \/>Acoustic consultant Daidalos Peutz<br \/>Planning consultant Endeavor<br \/>Project manager Sogent<br \/>CDM co-ordinator AB Solid<br \/>Main contractor Artes<br \/>CAD software used Revit, AutoCAD<\/p>\n<p>Environmental performance data<\/p>\n<p>Airtightness at 50Pa 6 m3\/h.m2<br \/>Overall area-weighted U-value External walls: 0.15 W\/m2K, roof: 0.10 W\/m2K, ground bearing floor: 0.15 W\/m2K, external windows and doors: 1.40 W\/m2K<br \/>Predicted design life 60 years<br \/>Embodied carbon 243.14 kgCO2eq\/m2\u00a0(structural elements only)<\/p>\n<p><a href=\"https:\/\/www.architectsjournal.co.uk\/news-fa034173\/2018-predictions-will-the-profession-continue-to-be-marginalised\/\" tabindex=\"-1\" rel=\"nofollow noopener\" target=\"_blank\">2018 predictions: Will the profession continue to be marginalised?<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"Carmody Groarke\u2019s extension of the Design Museum Gent, first revealed in 2019, opened its doors to the public&hellip;\n","protected":false},"author":2,"featured_media":792547,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[6225,6485,6486,53932,1120,96,27010,8946,1291,56,54,55,260888],"class_list":["post-792546","post","type-post","status-publish","format-standard","has-post-thumbnail","category-arts-and-design","tag-arts","tag-arts-and-design","tag-artsanddesign","tag-carmody-groarke","tag-design","tag-entertainment","tag-extension","tag-ghent","tag-museum","tag-uk","tag-united-kingdom","tag-unitedkingdom","tag-waste-brick"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/792546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/comments?post=792546"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/posts\/792546\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media\/792547"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/media?parent=792546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/categories?post=792546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/uk\/wp-json\/wp\/v2\/tags?post=792546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}