SEEK A WIDE RANGE OF INPUTS

“Bring in the primary goals from the community and the users, and integrate the big moves that will be carried throughout the duration of the project.”
—Matt Post, AIA, Associate Principal, OZ Architecture

“Try to have a diverse team in your design studio—people who are parents, people who are single, different genders, races, ethnicity, a variety of birthplaces—to support the experience of the residents.”
—Ben Kasdan, FAIA, LEED AP, NCARB, Design Director, KTGY 

“Don’t focus exclusively on the building alone early in the project. Think about the site, and coordinate with your civil and MEP team to make sure all the utilities you’re going to need are in place.”
—Lorne Bourdo, AIA, Principal | Project Manager, OZ Architecture

“The most important part of our job is to listen—to students, faculty, administrators—and to recognize that students have the ability to make informed decisions about their housing preferences.”
—Sara G. Stein, AIA, Principal, Page

THROW AWAY THE COOKIE CUTTER

“Balancing standardization with what makes sense for a specific student housing project is really important. We’re in a period where there’s growing innovation in typology, and we need to be designing spaces that support how students really live, not some cookie-cutter solution.”
—Ian Dickensen, AIA, Associate Principal, Sasaki

“The planning process is so important today. Ten years ago you weren’t ordering equipment and materials two years out, or worrying about whether the electric utility could give you enough power.”
—Mike Grever, General Manager of Commercial, The Weitz Company

“In designing for first-year students, make the living spaces a bit uncomfortable, so that you push them out into lounges. We don’t want to lock 18-year-olds behind closed doors.”
—James Sink, AIA, DBIA, LEED AP, Higher Education Practice Leader, HMC Architects

“It’s important to test systems in the field. One window manufacturer told us one thing about their windows’ air tightness but in the field they didn’t work quite that well. Work with your contractor to make sure those details come together and prove that the product works.”
—Lynn McBride, AIA, LEED AP BD+C, Partner, Mithun