Intersection Closed for Roundabout Construction on Commerce/Milford Border
(RCOC, June 12, 2026)
Commerce Township, Milford, MI – The Road Commission for Oakland County (RCOC) has closed the Wixom Road/Wixom Trail/Sleeth Road/Duck Lake Road intersection on the border of Commerce Township and Milford Township for the construction of its 45th roundabout.
The intersection will remain closed until late summer.
Roundabouts remain a key way for RCOC to reduce traffic fatalities on its roads. RCOC has the largest concentration of roundabouts of any county in Michigan.
The approximately $2.2 million project will be funded by RCOC.
The detour route for the intersection during construction will be Glengary Road to Benstein Road to Sleeth Road to North Commerce Road to East Commerce Road and vice versa.
The work includes:
Conversion of the existing two signalized intersections into a single, modern roundabout.
Reconstruction of approximately 0.4 miles of road with asphalt paving and new curbs and gutters.
Installation of Americans with Disabilities Act (ADA)-compliant pedestrian crosswalk on the east leg of the roundabout.
Improvements to storm sewers and drainage.
Installation of intersection lighting.
The contractor for the project is Angelo Iafrate Construction of Warren. This intersection carries approximately 12,000 vehicles daily.
For more information on the project, visit the “Wixom Trail/Duck Lake Road/Sleeth Road Roundabout” page in the “Road Projects” section of the RCOC website, www.rcocweb.org (direct link: https://rcocweb.org/727/Wixom-RoadWixom-TrailDuck-Lake-RoadSleet.







Save this post to PDF
Print this post