{"id":195791,"date":"2026-02-27T02:05:43","date_gmt":"2026-02-27T02:05:43","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/195791\/"},"modified":"2026-02-27T02:05:43","modified_gmt":"2026-02-27T02:05:43","slug":"bidding-set-to-open-for-sacramentos-i-street-bridge-replacement-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/195791\/","title":{"rendered":"Bidding set to open for Sacramento\u2019s I Street Bridge replacement"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">The City of Sacramento is gearing up for the next phase of the<a href=\"https:\/\/www.cityofsacramento.gov\/public-works\/engineering\/projects\/i-street-bridge-replacement-project\" rel=\"nofollow noopener\" target=\"_blank\" data-ylk=\"slk:I Street Bridge Replacement Project;elm:context_link;itc:0;sec:content-canvas\" class=\"link \"> I Street Bridge Replacement Project<\/a>, with bids from contractors set to be accepted starting March 25.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">According to city officials, the project is moving into the formal advertising phase. Contractors interested in submitting proposals can review <a href=\"https:\/\/vendors.planetbids.com\/portal\/15300\/bo\/bo-search\" rel=\"nofollow noopener\" target=\"_blank\" data-ylk=\"slk:bid information on PlanetBids;elm:context_link;itc:0;sec:content-canvas\" class=\"link \">bid information on PlanetBids<\/a>, the city\u2019s online procurement platform.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Once bids are received, the city anticipates awarding a contract in late April or early May, assuming proposals are within the project budget.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Construction on site could begin in late May or June after the selected contractor mobilizes.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The project involves building a new bridge upstream of the existing <a href=\"https:\/\/www.cityofsacramento.gov\/public-works\/engineering\/projects\/i-street-bridge-replacement-project\" rel=\"nofollow noopener\" target=\"_blank\" data-ylk=\"slk:I Street Bridge;elm:context_link;itc:0;sec:content-canvas\" class=\"link \">I Street Bridge<\/a> to serve vehicles, bicycles, transit, and pedestrians.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The current bridge, which is more than 110 years old, has narrow lanes and limited accessibility and will continue to carry rail traffic.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">After the new bridge opens, expected to take about four years of construction, the existing bridge\u2019s upper deck may be converted for pedestrian and bicycle use as a separate project led by West Sacramento.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Officials note that public engagement has been extensive throughout the planning and design phases. Construction-phase outreach will begin once bids are received and contract awards are confirmed.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The project is designed to improve mobility, support economic development, and provide better access to Sacramento\u2019s Railyards and West Sacramento\u2019s waterfront.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Estimated construction and delivery costs for the new bridge range from $260 million to $320 million. Funding comes from a combination of local city contributions, federal matching funds, and programs, including the Highway Bridge Replacement funding, the SB1 Local Partnership Program, and the federal Bridge Investment Program.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">For more information, including project updates, renderings, and public engagement materials, visit the City of Sacramento\u2019s project website <a href=\"https:\/\/www.cityofsacramento.gov\/public-works\/engineering\/projects\/i-street-bridge-replacement-project\" rel=\"nofollow noopener\" target=\"_blank\" data-ylk=\"slk:here;elm:context_link;itc:0;sec:content-canvas\" class=\"link \">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"The City of Sacramento is gearing up for the next phase of the I Street Bridge Replacement Project,&hellip;\n","protected":false},"author":2,"featured_media":83358,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32],"tags":[91362,4962,121,123,122,2958],"class_list":["post-195791","post","type-post","status-publish","format-standard","has-post-thumbnail","category-sacramento","tag-bridge-replacement-project","tag-city-of-sacramento","tag-sacramento","tag-sacramento-headlines","tag-sacramento-news","tag-west-sacramento"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/195791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=195791"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/195791\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/83358"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=195791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=195791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=195791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}