{"id":203835,"date":"2026-03-04T12:39:31","date_gmt":"2026-03-04T12:39:31","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/203835\/"},"modified":"2026-03-04T12:39:31","modified_gmt":"2026-03-04T12:39:31","slug":"high-speed-rail-says-it-could-save-2b-on-central-valley-route","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/203835\/","title":{"rendered":"High-Speed Rail says it could save $2B on Central Valley route"},"content":{"rendered":"<p>If things go according to the California High-Speed Rail Authority\u2019s plans, the agency says it could save an extra $2 billion on its initial Central Valley route through Fresno.<\/p>\n<p>A draft of the agency\u2019s <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/hsr.ca.gov\/wp-content\/uploads\/2026\/02\/2026-HSR-Draft-Business-Plan-02282026.pdf\">2026 business plan<\/a> released over the weekend says the savings would bring that route\u2019s total estimated cost to $34.76 billion, down from the $36.75 billion cost the rail authority projected <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.fresnobee.com\/news\/local\/high-speed-rail\/article311748729.html\">last August<\/a> and from the $51 billion it says the route would cost without its savings plan. The rail authority says it\u2019s possible to finish the route\u2019s construction by 2032.<\/p>\n<p>But to stay on schedule and realize the possible savings, the agency says it will need the state government to grant it more power over land and money. It\u2019ll also need to access money faster through partnerships with the private sector \u2014 not just on an annual basis from the state.<\/p>\n<p>The agency did not respond to questions by The Fresno Bee\u2019s deadline for this story. But in a <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/hsr.ca.gov\/2026\/02\/28\/news-release-high-speed-rail-authority-issues-draft-2026-business-plan-for-public-review-and-comment\/\">news release<\/a>, Tom Richards, the rail authority\u2019s board chair and a Fresno businessman, said the draft business plan \u201csets out the path forward.\u201d<\/p>\n<p>In its own <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/lao.ca.gov\/handouts\/transportation\/2026\/Oversight-of-the-CA-High-Speed-Rail-Project-030226.pdf\">report released Monday<\/a>, the California Legislative Analyst\u2019s Office (LAO) cast doubt on the project\u2019s savings potential, noting its plan depends on changes to the law that the agency has yet to fully explain.<\/p>\n<p>The project has grown controversial since California voters in 2008 approved <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/vigarchive.sos.ca.gov\/2008\/general\/analysis\/prop1a-analysis.htm#:~:text=would%20be%20about-,%2445%20billion,-.%20While%20the%20authority\">$9.95 billion in bonds<\/a> for a train that would connect the state\u2019s major metro areas at a total cost of about $45 billion. Today, after years of delays and cost increases, state law requires that the rail authority focus on completing the Central Valley segment first \u2014 a 171-mile Merced-to-Bakersfield line that is expected to lose money with low ridership.<\/p>\n<p>Since taking lead of the rail authority in 2024, CEO Ian Choudri has proposed redesigns for Central Valley construction and floated state legislation to quicken the construction timeline, cut costs and move the project toward Los Angeles and San Francisco. He recently went on voluntary leave following his arrest after a domestic disturbance at his home, though he was not charged with a crime.<\/p>\n<p>Among other policies, the rail authority has said it wants a faster way to get through eminent domain cases in court, relocate utilities and obtain permits. It also wants changes to a state law that requires the rail authority to focus its spending on the Central Valley \u2014 a law Choudri says could keep the project from landing private investors who want to build more profitable routes.<\/p>\n<p>The agency is also now pitching some new high-speed rail financing strategies for the future, including the use of surplus dollars from California\u2019s General Fund and also tax dollars captured from <a target=\"_blank\" rel=\"Follow nofollow noopener\" href=\"https:\/\/www.fresnobee.com\/news\/local\/article314760724.html\">local sales and property value increases<\/a> near its stations.<\/p>\n<p>                                                                                                                                                                                                              <img class=\"responsive-image\" width=\"1140\" height=\"641\"  alt=\"A rendering shows a high-speed rail train from the front.\" title=\"CAHSR_Train_View_01_Day.png\"  loading=\"lazy\"\/>                                                                                                                A rendering shows a high-speed rail train from the front.                                                                                                                                                                        California High-Speed Rail Authority                                                                                        Where do possible Central Valley cost savings come from?<\/p>\n<p>The cost savings the rail authority is planning would mostly come from the Merced and Bakersfield extensions. The agency expects it could reduce the cost of the Bakersfield extension, which would be built south from the Shafter area, by $1.8 billion.<\/p>\n<p>It expects savings of $759 million for the Merced extension, which would be built north from Madera County.<\/p>\n<p>The draft business plan does not detail how these savings would be achieved. But the rail authority over the past year has said it plans to downsize the Central Valley station designs to cut costs, though future construction could increase their size if ridership levels require it.<\/p>\n<p>The agency has also pitched delaying the Merced extension so it can first build to Gilroy, and more recently pitched changing the Merced station location from the city\u2019s downtown to an unincorporated area to the city\u2019s southeast. The agency says the new proposed location would save $1 billion.<\/p>\n<p>                                                                                                                                                                                                              <img class=\"responsive-image\" width=\"1140\" height=\"789\"  alt=\"A table in the California High-Speed Rail Authority\u2019s draft 2026 business plan shows where the agency\u2019s potential cost savings in the Central Valley would be made.\" title=\"2026 HSRA draft business plan\"  loading=\"lazy\"\/>                                                                                                                A table in the California High-Speed Rail Authority\u2019s draft 2026 business plan shows where the agency\u2019s potential cost savings in the Central Valley would be made.                                                                                                                                                                        2026 HSRA draft business plan                                                                                        CA Legislative Analyst\u2019s Office casts doubt on high-speed rail savings plan<\/p>\n<p>Monday\u2019s report from the LAO says the rail authority\u2019s cost estimates make \u201cassumptions that might not be realistic.\u201d<\/p>\n<p>That report analyzed the cost savings projected in the rail authority\u2019s previous August update and said the Central Valley segment, as of its August update, still faced a $2 billion funding gap.<\/p>\n<p>The new $2 billion in potential savings seen in the rail authority\u2019s Saturday report could clear that gap, but the LAO also noted achieving the savings will not be easy.<\/p>\n<p>The LAO\u2019s report notes the rail authority has itself indicated its legislative proposals \u201care necessary for it to achieve its proposed schedule and cost estimate.\u201d<\/p>\n<p>\u201cThe implications for these estimates if the Legislature were not to approve the proposed statutory changes are unclear,\u201d the LAO report says.<\/p>\n<p>The LAO report also says some savings will rely on redesigns that the rail authority \u201cmay not be able to implement unilaterally.\u201d<\/p>\n<p>\u201cStaying on budget may be difficult, particularly given the history of the project, its size and complexity,\u201d the LAO report says.<\/p>\n<p class=\"summary gray\">This story was originally published March 2, 2026 at 6:40 PM.<\/p>\n<p>        Related Stories from  Fresno Bee<\/p>\n<p>                <a href=\"https:\/\/www.fresnobee.com\/profile\/279093999\/\" rel=\"nofollow noopener\" target=\"_blank\"><br \/>\n                        <img decoding=\"async\" class=\"author-thumb\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/02\/6743EEF5-FFCA-4EF4-A26A-CF3830F06743.JPG\" width=\"400\" height=\"400\" alt=\"Profile Image of Erik Galicia\" loading=\"lazy\"\/><br \/>\n                    <\/a><\/p>\n<p>                <a class=\"author-name\" href=\"https:\/\/www.fresnobee.com\/profile\/279093999\/\" rel=\"nofollow noopener\" target=\"_blank\">Erik Galicia<\/a><\/p>\n<p>                    The Fresno Bee<\/p>\n<p>            Erik is a graduate of the Missouri School of Journalism, where he helped launch an effort to better meet the news needs of Spanish-speaking immigrants. Before that, he served as editor-in-chief of his community college student newspaper, Riverside City College Viewpoints, where he covered the impacts of the Salton Sea\u2019s decline on its adjacent farm worker communities in the Southern California desert. Erik\u2019s work is supported through the California Local News Fellowship program.\n            <\/p>\n","protected":false},"excerpt":{"rendered":"If things go according to the California High-Speed Rail Authority\u2019s plans, the agency says it could save an&hellip;\n","protected":false},"author":2,"featured_media":203836,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[52317,94442,5694,112,114,113,94443],"class_list":["post-203835","post","type-post","status-publish","format-standard","has-post-thumbnail","category-fresno","tag-california-high-speed-rail","tag-central-valley-route","tag-eminent-domain","tag-fresno","tag-fresno-headlines","tag-fresno-news","tag-project-savings"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/203835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=203835"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/203835\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/203836"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=203835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=203835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=203835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}