{"id":247422,"date":"2026-04-01T22:35:09","date_gmt":"2026-04-01T22:35:09","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/247422\/"},"modified":"2026-04-01T22:35:09","modified_gmt":"2026-04-01T22:35:09","slug":"newly-remodeled-millikan-building-still-had-no-ac-during-march-heatwave-teachers-say-long-beach-post-news-2","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/247422\/","title":{"rendered":"Newly remodeled Millikan building still had no AC during March heatwave, teachers say \u2022 Long Beach Post News"},"content":{"rendered":"<p>In record-breaking March heat recently, fans were the soundtrack of a newly renovated Millikan High School building \u2014 teachers\u2019 makeshift solution to a nonfunctional heating and cooling system.<\/p>\n<p>When about two dozen Millikan teachers moved into the newly upgraded English Language Arts building in January \u2014 part of a $79 million project including construction across three buildings \u2014 \u201cWe believed we\u2019d come back to air conditioning,\u201d one teacher told the Long Beach Post. Instead, classrooms were equipped with space heaters, which the teacher took as \u201cevidence that we don\u2019t actually have air conditioning,\u201d she said. \u201cThat became the truth,\u201d she added.<\/p>\n<p>For years, urgency has been mounting for the district to install air conditioning in its schools. A decade ago, Long Beach voters approved a bond measure dedicating $1.5 billion to school repair and safety, including updating heating, ventilation and air conditioning systems. In 2022, after a heat wave and an increasing number of poor air quality days, <a href=\"https:\/\/www.lbschoolbonds.net\/news\/news-details\/~board\/bond-site-news\/post\/lbusds-hvac-timeline-expedited\" rel=\"nofollow noopener\" target=\"_blank\">LBUSD expedited the timeline for HVAC projects<\/a> and announced nearly all schools would have air conditioning by the end of 2027. <a href=\"https:\/\/www.lbschoolbonds.net\/news\/news-details\/~board\/bond-site-news\/post\/enhancing-hvac-systems-in-school-upgrades\" rel=\"nofollow noopener\" target=\"_blank\">Millikan, Poly and Sato<\/a> are the only high schools still awaiting new HVAC systems, according to the district\u2019s site tracking bond measures. Some say it still isn\u2019t happening fast enough.<\/p>\n<p>Four Millikan teachers assigned to the English Language Arts building spoke with the Long Beach Post and requested they not be named over fears of retaliation. They voiced frustration that they were placed \u201cback in these classrooms obviously way too early,\u201d one said, citing the lack of adequate cooling in particular.<\/p>\n<p>Teachers told the Post that they measured classroom temperatures in the 90s earlier in March, which they said affects student behavior. \u201cKids want to sleep because they\u2019re tired, they\u2019re hot,\u201d one teacher said. \u201cThey\u2019re checked out, heads down.\u201d<\/p>\n<p>Classrooms recently received water coolers to mitigate the heat, but it wasn\u2019t enough to keep students cool, said teachers, many of whom have purchased their own fans. One teacher said she bought eight; at a recent open house, when outdoor temperatures reached a high of 91 degrees, she had five running at once. Also at the open house, parents of Millikan students remarked on the temperature and questioned the point of all the construction if the classrooms were still blistering.<\/p>\n<p>A spokesperson for the district said the HVAC system has been fully installed and will be up and running once Southern California Edison completes the final step of providing permanent power to the campus, work that is scheduled to be completed over the district\u2019s spring break in April. The building \u201cis safe for instruction,\u201d the LBUSD spokesperson said.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"621\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/04\/1775082909_457_new-millikan-building-2-img-4040-071912-cnmwqfwr-971084-h6sTg6OH-1024x621.jpg\" alt=\"\" class=\"wp-image-182804\"  \/>A box fan in the window of the newly renovated 2000 Building at Millikan High School in Long Beach. Photo by Kate Raphael.<\/p>\n<p>Teachers said they\u2019re concerned that even once the HVAC is working the building will not be well insulated because the old single-pane windows were not replaced.<\/p>\n<p>They remain frustrated about other aspects of the renovation, too. The new building currently has no elevator. The LBUSD spokesperson said the first floor is compliant with the Americans with Disabilities Act and that the elevator installation was intentionally sequenced later to allow continued access for ongoing work. One teacher said students on crutches or with accessibility needs who have classes on the upper floor must go to the library to take their classes. \u201cThe school has been, and will continue accommodating ADA needs,\u201d an LBUSD spokesperson said.<\/p>\n<p>A district spokesperson said this and other modernization projects focus on fire and life safety, accessibility and structural integrity. Other improvements are considered \u201cnice-to-have\u201d items and are completed based on available funding and project scope, she said. As a result, some items like lockers and older equipment remain in place if they do not pose safety or compliance issues.<\/p>\n<p>Some teachers praised the new technology upgrades, including mounted projectors and speakers built into the ceiling. \u201cThis is the first time in 20 years I haven\u2019t had extension cords running in every direction,\u201d one teacher said.<\/p>\n<p>Yet teachers also surfaced complaints about cosmetic issues and unfinished projects: mismatched tiles, holes in the walls and ceilings, vestigial heaters filled with snack wrappers and trash, closet doors that won\u2019t latch and a film of construction dust coating surfaces throughout the building.<\/p>\n<p>Many of these complaints are familiar, said a teacher at Lakewood High School, <a href=\"https:\/\/lakewood.lbschools.net\/our-school\/schools-history\" rel=\"nofollow noopener\" target=\"_blank\">Millikan\u2019s \u201carchitectural twin,\u201d<\/a> which was renovated years ago. While Lakewood\u2019s HVAC was largely operational when teachers moved back into their classrooms, \u201cit took a while for them to work out the bugs,\u201d the teacher said. Some facilities, like the aquatic center and football field, are beautiful, he said. But classrooms didn\u2019t get the facelift he might have hoped for: it didn\u2019t \u201ceven look like we had gotten a renovation,\u201d he said.<\/p>\n","protected":false},"excerpt":{"rendered":"In record-breaking March heat recently, fans were the soundtrack of a newly renovated Millikan High School building \u2014&hellip;\n","protected":false},"author":2,"featured_media":247071,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[131,133,132],"class_list":["post-247422","post","type-post","status-publish","format-standard","has-post-thumbnail","category-long-beach","tag-long-beach","tag-long-beach-headlines","tag-long-beach-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/247422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=247422"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/247422\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/247071"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=247422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=247422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=247422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}