{"id":309643,"date":"2026-05-11T00:54:19","date_gmt":"2026-05-11T00:54:19","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/309643\/"},"modified":"2026-05-11T00:54:19","modified_gmt":"2026-05-11T00:54:19","slug":"road-work-slows-traffic-on-san-franciscos-19th-avenue-but-drivers-say-its-worth-it","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/309643\/","title":{"rendered":"Road work slows traffic on San Francisco&#8217;s 19th Avenue &#8212; but drivers say it&#8217;s worth it"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">A major construction project is causing delays this weekend along one of San Francisco&#8217;s busiest corridors but drivers say the inconvenience may finally be worth it.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Caltrans crews are repaving southbound 19th Avenue in the Sunset District from Lincoln Avenue to Sloat Boulevard.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The work has reduced traffic to a single lane, with detours in place and backups, stretching for miles at times. The work has been loud, dusty and kind of smelly, but many neighbors say the long-overdue repairs are welcome.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;We needed 19th Avenue done &#8212; oh my God &#8212; for so long,&#8221; said Sunset resident Denis Francis.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Only one southbound lane is open through the construction zone, and drivers say delays are significant.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">MORE: <a href=\"https:\/\/www.yahoo.com\/news\/articles\/2nd-weekend-repaving-closes-lanes-153344647.html\" data-ylk=\"elm:link;elmt:article_link;slk:2nd weekend of repaving work closes lanes on southbound 19th Ave in SF;itc:0;sec:content-canvas;outcm:mb_qualified_link;_E:mb_qualified_link;ct:story;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;context_link&quot;,&quot;yModuleName&quot;:&quot;content-canvas&quot;,&quot;yLinkText&quot;:&quot;2nd weekend of repaving work closes lanes on southbound 19th Ave in SF&quot;}\" class=\"link  yahoo-link\" rel=\"nofollow noopener\" target=\"_blank\">2nd weekend of repaving work closes lanes on southbound 19th Ave in SF<\/a><\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;It&#8217;s pretty bad. It was like 30 minutes,&#8221; said motorist Joel Cardenas.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Caltrans has set up a detour through Golden Gate Park, but even that route is congested. A test drive through the detour showed delays of about 20 minutes.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The current work follows a previous phase from two weekends ago, when northbound lanes were repaved and potholes filled.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;It was a bumpy ride. So after all this is done, it will be a really smooth ride,&#8221; said Caltrans spokesperson Matt O&#8217;Donnell.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The construction comes during a critical weekend for some local vendors. Flower sellers along 19th Avenue say Mother&#8217;s Day traffic &#8212; usually their busiest time of year &#8212; has been disrupted.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">MORE: <a href=\"https:\/\/www.yahoo.com\/news\/articles\/sfs-19th-avenue-reopens-weekend-153554651.html\" data-ylk=\"elm:link;elmt:article_link;slk:SF&#039;s 19th Avenue reopens after weekend repaving work, but more closures ahead;itc:0;sec:content-canvas;outcm:mb_qualified_link;_E:mb_qualified_link;ct:story;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;context_link&quot;,&quot;yModuleName&quot;:&quot;content-canvas&quot;,&quot;yLinkText&quot;:&quot;SF&#039;s 19th Avenue reopens after weekend repaving work, but more closures ahead&quot;}\" class=\"link  yahoo-link\" rel=\"nofollow noopener\" target=\"_blank\">SF&#8217;s 19th Avenue reopens after weekend repaving work, but more closures ahead<\/a><\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;It&#8217;s the busiest weekend of the year,&#8221; said Derek Rodriguez, who works at Brothers Papadopoulos Flowers. &#8220;Some people aren&#8217;t sure where to park. Getting across the street has been a challenge.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Caltrans says additional crossing guards are helping pedestrians navigate the area safely.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Officials say the project will continue over Memorial Day weekend, when crews plan to repave 19th Avenue from Sloat Boulevard to Holloway Avenue in both directions.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Detours will remain in place as the work continues.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">For many commuters, the temporary frustration is a fair tradeoff.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;Every morning I go to work, the car&#8217;s bouncing all over the place,&#8221; Francis said. &#8220;This is fantastic &#8212; long overdue.&#8221;<\/p>\n<p><a data-ylk=\"ct:story;elm:img;itc:0;\" class=\"stretched-box\" href=\"https:\/\/abc7news.com\/abc-news-live-local-watch\/11513295\/\" rel=\"noopener noreferrer nofollow\" target=\"_blank\"><img alt=\"\" loading=\"lazy\" width=\"960\" height=\"540\" decoding=\"async\" data-nimg=\"1\" class=\"rounded-lg\" style=\"color:transparent\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/10\/131c44567cfd550c1c93df1368fb6896.jpeg\"\/><\/a><\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">If you&#8217;re on the ABC7 News app, <a href=\"https:\/\/abc7news.com\/abc-news-live-local-watch\/11513295\/\" rel=\"nofollow noopener\" target=\"_blank\" data-ylk=\"elm:link;elmt:article_link;slk:click here to watch live;itc:0;sec:content-canvas\" data-yga=\"{&quot;yLinkElement&quot;:&quot;context_link&quot;,&quot;yModuleName&quot;:&quot;content-canvas&quot;,&quot;yLinkText&quot;:&quot;click here to watch live&quot;}\" class=\"link \">click here to watch live<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"A major construction project is causing delays this weekend along one of San Francisco&#8217;s busiest corridors but drivers&hellip;\n","protected":false},"author":2,"featured_media":309644,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[121028,3315,129985,110003,129986,101,103,102,104,106,105,77395],"class_list":["post-309643","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-francisco","tag-19th-avenue","tag-caltrans","tag-denis-francis","tag-lincoln-avenue","tag-memorial-day-weekend","tag-san-francisco","tag-san-francisco-headlines","tag-san-francisco-news","tag-sf","tag-sf-headlines","tag-sf-news","tag-southbound-lane"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/309643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=309643"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/309643\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/309644"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=309643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=309643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=309643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}