{"id":32802,"date":"2025-11-01T01:17:10","date_gmt":"2025-11-01T01:17:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/32802\/"},"modified":"2025-11-01T01:17:10","modified_gmt":"2025-11-01T01:17:10","slug":"then-and-now-how-a-groundbreaking-in-long-beach-sparked-40-years-of-rail-growth","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/32802\/","title":{"rendered":"Then and now: How a groundbreaking in Long Beach\u202f\u202fsparked 40 years of rail growth\u202f"},"content":{"rendered":"<p>On a sunny, typically 72-degree Thursday in Long Beach in 1985 \u2014 Oct. 31, to be exact \u2014 dozens of civic leaders gathered just west of the 710 freeway for a groundbreaking. Shovels were turning dirt that day to start work on the Blue Line, the 22-mile light rail project between downtown L.A. and downtown Long Beach.\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p><img data-recalc-dims=\"1\" fetchpriority=\"high\" decoding=\"async\" width=\"780\" height=\"768\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/Blue-Line-people-.png\" alt=\"\" class=\"wp-image-145540\"  \/>Mayor Tom Bradley and County Supervisor Kenneth Hahn (third and fifth from left to right) during the Blue Line groundbreaking.<\/p>\n<p>At the site of the Blue Line\u2019s future rail maintenance yard, then County Supervisor Kenneth Hahn declared, \u201cLet\u2019s build, build, build to the year 2000.\u201d His point was that this was just the first of many transit projects to come that would finally give area residents an alternative to sitting in the traffic that had come to define life in Southern California.\u202f\u202fAfter the streetcars stopped running in the early 1960s, there was no rail transit in Southern California even as the region\u2019s population grew and traffic got worse.\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" width=\"780\" height=\"614\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/Blue-Line-1.webp\" alt=\"\" class=\"wp-image-145522\" style=\"width:810px;height:auto\"  \/>The groundbreaking of the Blue Line (now A Line) took place on October 31, 1985. The Line opened to the public on July, 1990; <\/p>\n<p>As it turns out, Hahn was correct and\u2026incorrect. The building that began in 1985 continued until 2000 and then never really let up. As soon as one rail project was completed over the past 40 years, another would begin. The recently opened A Line extension between Azusa and Pomona increased the Metro Rail system to 118 miles. Soon, four more miles will be added: the highly anticipated first section of the D Line Extension to the Miracle Mile and western Beverly Hills.\u202f\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>Our Board will also soon select a route (known as the Locally Preferred Alternative in industry jargon) for an extension from Redondo Beach to Torrance. Like all the rail lines that came prior, there has been a robust civic debate about the route.\u202f\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>Of course, there has never been 100 percent agreement about the building of our rail system. The votes for the four sales tax measures approved by voters that have helped fund our rail expansion were not unanimous (the most recent, 2016\u2019s Measure M, received the most support with 71 percent approval). Virtually every project \u2014 or components of projects \u2014 faced some degree of opposition.\u202f\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>Which brings us to this point of emphasis: while Metro may not have everyone\u2019s support for every project, we strive to A) build projects that will serve the mobility needs of as many people as possible, and B) mitigate as many concerns by residents and businesses as possible.\u202f\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>David Mieger, Senior Executive Officer in Mobility Corridor Planning, who has been at Metro since 1991, reflects on this approach. \u201cWe can\u2019t just show a design and say, \u2018This is what we are going to do,\u201d he says. \u201cWe have to work to build support, so the community sees it as their project. That means \u2013 listening \u2013 and sometimes rethinking how we build it.\u201d\u202f\u202f\u202f\u00a0<\/p>\n<p>Below are some examples of concerns about some projects over the decades and what we\u2019ve worked with communities to move forward:\u202f\u202f\u202f\u00a0<\/p>\n<p><a href=\"https:\/\/www.metro.net\/projects\/westside\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">D Line Extension<\/a>\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>The concern: Excavating subway tunnels in an area with underground methane gas and earthquake faults would be dangerous to build and operate.\u202f\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>How we addressed it: Metro conducted additional analysis on potential alignments in Beverly Hills and Century City, performed site investigations to confirm soil conditions, and prepared a tunnel safety report that was reviewed by the Metro Tunnel Advisory Panel, an independent group of experts. As a result, the Final Environmental Impact Report, published in March 2012, included a refined route to safely travel below Century City and Beverly Hills High School. <a href=\"https:\/\/www.metro.net\/about\/la-metro-officially-completes-five-years-of-tunneling-adding-nine-miles-on-d-line-subway-extension-project-between-downtown-west-la\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Tunneling section 2 of the project was completed<\/a> safely in late 2023 in one of the densest and most geologically challenging urban corridors in the L.A. region and nation.\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"520\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/48140554936_e54abd147b_h.jpg\" alt=\"\" class=\"wp-image-145539\"  \/>An image of the D Line Extension groundbreaking.<\/p>\n<p>\u201cOn this project, we had to exhaust all the possibilities [the community] wanted us to consider and review all the alternatives,\u201d Mieger recalls. \u201cWe worked on seismic and tunnel safety, did research into the oil wells and underground gas deposits, and established the science that demonstrated that tunneling could be done safely.\u201d\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p><a href=\"https:\/\/www.metro.net\/projects\/orangeline\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">G Line (Orange Line) Busway<\/a>\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>This project is a unique chapter in Metro\u2019s transit history. Stretching 18 miles along an old rail corridor across the San Fernando Valley, it began as a concept for heavy rail in the early 1990s, and light rail was considered as an option. However, after state legislation and a voter-approved measure, Metro shifted course and developed Los Angeles\u2019 first Bus Rapid Transit [BRT] that was based heavily on a bus rapid transit system in Curitiba, Brazil.\u202f\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>The concern: Residents living near the project worried about noise, safety at crossings, and the visual impacts of a busway cutting across the Valley. Some community groups argued Metro should expand the existing Rapid Bus service instead of building a new dedicated bus corridor.\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>Mieger recalls that the area included an Orthodox Jewish community with many synagogues on the right-of-way, concerned that pushing crosswalk buttons would interfere with walking to temple on the Sabbath. \u201cOn that day, they aren\u2019t allowed to touch mechanical equipment, and pushing buttons on the crosswalks was going to block their ability to worship,\u201d he says. \u202f\u202f\u202f\u00a0<\/p>\n<p>How we addressed it: After further environmental review, Metro moved forward with the BRT project. Crosswalks were redesigned to activate automatically, and safety lights and warning signs were installed at intersections. Other measures included the addition of sound walls, paving with rubberized asphalt to reduce noise, and planting 5,000 trees and more than 800,000 pieces of vegetation along the route.\u202f\u202f\u202f\u00a0<\/p>\n<p>\u201cIt was the right switch, and we were able to address the opposition -creating something that matched the community\u2019s needs,\u201d says Mieger. The G Line opened in 2005, and we are now upgrading the corridor with crossing gates and a couple of bridges over intersections to make it even safer. \u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p><a href=\"https:\/\/libraryarchives.metro.net\/dpgtl\/employeenews\/mymetro\/20070531-groundbreaking-ramona-high-school-reconfiguration.pdf\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">E Line (formerly Gold Line) Eastside Extension<\/a>\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>The concern: The proposed route required land from Ramona High School in East L.A., raising strong objections from the school district and community members.\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>How we addressed it: Metro reached an agreement with the Los Angeles Unified School District to help fund and support a full reconfiguration of Ramona High School. The $47 million project \u2013 including $32 million in Metro contributions \u2013 ensured the school could continue serving students while Metro secured the land needed to build Indiana Station. The six-mile light rail extension opened in 2009 and continues to serve thousands of daily riders in East L.A.\u202f\u202f\u202f\u00a0<\/p>\n<p><a href=\"https:\/\/www.metro.net\/projects\/crenshaw_corridor\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">K Line (formerly Crenshaw\/LAX Transit Project)<\/a>\u202f\u202f\u202f\u00a0<\/p>\n<p>The concern: Disruptions for local businesses during construction and fears that rising rents would displace minority-owned businesses and families that had long resided along the project\u2019s route.\u202f\u202f\u202f\u00a0<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"519\" data-id=\"145532\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/k-line-A.jpeg\" alt=\"\" class=\"wp-image-145532\"  \/><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"520\" data-id=\"145531\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/k-line-0.jpeg\" alt=\"\" class=\"wp-image-145531\"  \/><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"520\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/k-Line_Opening-1246-2.jpg\" alt=\"\" class=\"wp-image-145523\"  \/><\/p>\n<p>How we addressed it: Metro worked closely with the community on the project design and Leimert Park saw key revitalization efforts. \u201cWe also implemented programs for local businesses,\u201d says Mieger. These included the Business Interruption Fund (BIF), which provides financial assistance to small \u201cmom and pop\u201d shops, and Eat, Shop Play,\u202fa program that offered marketing support during construction. \u201cIt was a unique community here and we wanted the businesses to not just survive but to thrive,\u201d Mieger adds. Metro also supported housing development through the proposed <a href=\"https:\/\/www.wattcap.com\/properties\/featured\/crenshaw-crossing\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">Crenshaw Crossing<\/a> joint development next to Expo\/Crenshaw Station \u2013 with 401 residential units (81 of them affordable), a community room available for neighborhood organizations, green areas, and a long-awaited supermarket. \u201cThe community wanted one, so we included it as a part of our transit station\u2026We have to be more than just transit planners. We must build support in the community,\u201d Mieger adds. \u202f\u202f\u202f\u00a0<\/p>\n<p>A story of learning and listening\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>Every rail or busway project brings excitement \u2013 and naturally, questions, fears and concerns from the communities nearby. On some projects litigation is filed. However, work always continues to refine and address concerns with designs and mitigations that have proved to be successful on similar, completed projects.\u202f In other cases, new and unique solutions are found.\u202f\u202f\u00a0<\/p>\n<p>Over the years, neighbors have questioned how close rail lines would run to homes, whether street crossings would affect traffic and safety, how construction will impact parking, how loud noise and vibrations would be from trains and signals, and what happens when old rail corridors are revived and once-empty spaces are taken over by transit. \u202f\u202f\u202f\u00a0<\/p>\n<p>Metro has consistently worked to address these concerns and to find thoughtful solutions. \u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>That work has meant listening closely and evolving along the way. \u201cInstead of talking to the community, we\u2019re talking with the community,\u201d says Mieger.\u202f\u202f\u00a0<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"439\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/community-meeting.jpg\" alt=\"\" class=\"wp-image-145530\"  \/>Metro representatives explained a project during a meeting with the community. <\/p>\n<p>Every neighborhood is unique and has its own vision for how transit fits into daily life. Mieger says community engagement today feels more personal than ever. \u201cIt\u2019s not an abstract community that\u2019s faceless,\u201d he says. \u201cPeople come to our Board meetings and share their comments. We see them, and if we do something they don\u2019t like, they call us. \u202f\u202f\u00a0<\/p>\n<p>This ongoing dialogue has led to real changes in how projects are built. Metro has conducted additional alignment analyses, geotechnical studies and tunnel safety reports; completing supplemental environmental work and revised studies when needed. Safety improvements have been added at street crossings, while mitigation measures address construction impacts such as noise, vibration and loss of parking.\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>As part of that work, frequent community meetings and open houses continue through the construction phase\u2013 even during the pandemic, when we moved them online \u2014 have been central to this process. They give residents a space to raise questions, share input, and shape the projects being built around them. Metro has also supported neighborhoods through programs that help offset construction impacts: our Eat Shop Play offers marketing assistance while our Business Interruption Fund helps small businesses make up for lost revenue. \u202f\u202f\u202f\u00a0<\/p>\n<p>\u201cEvery community is different,\u201d Mieger says. \u201cYou have to figure out what is important to them and how to build the project in a way that supports those goals. It\u2019s not about how many people we carry on the trains. It\u2019s how this helps the community thrive when the transit project is complete.\u201d\u202f\u202f\u202f\u00a0<\/p>\n<p>That\u2019s why the groundbreaking in 1985 was about more than steel and concrete \u2013 it was about a community choosing a new future that included high-capacity, fast mass transit. That same spirit guides us today. Each meeting, each tough conversation reflects our commitment to listen and make projects better. Rail is never built overnight, and never without debate.\u202f\u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>Over four decades, we\u2019ve seen what\u2019s possible when we keep building together \u2013with about 5.7 million boardings every month that give people a real alternative to driving and creating more traffic.\u202fAs we look at Torrance, to Beverly Hills, to the Sepulveda Corridor and East L.A. and beyond, we carry forward the same promise: a more connected, accessible and hopeful future for Angelenos. \u202f\u202f\u202f\u202f\u00a0<\/p>\n<p>Like this:<\/p>\n<p>Like Loading&#8230;<\/p>\n<p><a class=\"sd-link-color\"\/><\/p>\n<p>\n\tRelated\n<\/p>\n<p>\tDiscover more from The Source<\/p>\n<p class=\"has-text-align-center\" style=\"margin-top:10px;margin-bottom:10px;font-size:15px\">Subscribe to get the latest posts sent to your email.<\/p>\n","protected":false},"excerpt":{"rendered":"On a sunny, typically 72-degree Thursday in Long Beach in 1985 \u2014 Oct. 31, to be exact \u2014&hellip;\n","protected":false},"author":2,"featured_media":32803,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[131,133,132],"class_list":["post-32802","post","type-post","status-publish","format-standard","has-post-thumbnail","category-long-beach","tag-long-beach","tag-long-beach-headlines","tag-long-beach-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/32802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=32802"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/32802\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/32803"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=32802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=32802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=32802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}