{"id":356537,"date":"2026-06-11T17:52:16","date_gmt":"2026-06-11T17:52:16","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/356537\/"},"modified":"2026-06-11T17:52:16","modified_gmt":"2026-06-11T17:52:16","slug":"formal-application-for-bernal-heights-safeway-redevelopment-san-francisco","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/356537\/","title":{"rendered":"Formal Application For Bernal Heights Safeway Redevelopment, San Francisco"},"content":{"rendered":"<p>Formal plans have been filed for the Bernal Heights Safeway redevelopment at <a href=\"https:\/\/sfyimby.com\/category\/3350-mission-street\" rel=\"nofollow noopener\" target=\"_blank\">3350 Mission Street<\/a> in the <a href=\"https:\/\/sfyimby.com\/neighborhoods\/bernal-heights\" rel=\"nofollow noopener\" target=\"_blank\">Bernal Heights<\/a> neighborhood of <a href=\"https:\/\/sfyimby.com\/neighborhoods\/san-francisco\" rel=\"nofollow noopener\" target=\"_blank\">San Francisco<\/a>. The project is one of several high-profile projects to bring high-density housing above grocery stores across the Bay Area. <a href=\"https:\/\/sfyimby.com\/category\/align-real-estate\" rel=\"nofollow noopener\" target=\"_blank\">Align Real Estate<\/a> is the project developer, filing on behalf of the property owner, <a href=\"https:\/\/sfyimby.com\/category\/albertsons-companies\" rel=\"nofollow noopener\" target=\"_blank\">Albertsons Companies<\/a>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-46665\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/06\/3350-Mission-Street-pedestrian-perspective-rendering-by-Perry-Architects-scaled.jpg\" alt=\"3350 Mission Street pedestrian perspective, rendering by Perry Architects\" width=\"2560\" height=\"1597\"  \/><\/p>\n<p class=\"wp-caption-text\">3350 Mission Street pedestrian perspective, rendering by Perry Architects<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-46663\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/06\/3350-Mission-Street-birds-eye-view-rendering-by-Perry-Architects-scaled.jpg\" alt=\"3350 Mission Street birds-eye view, rendering by Perry Architects\" width=\"2560\" height=\"1597\"  \/><\/p>\n<p class=\"wp-caption-text\">3350 Mission Street birds-eye view, rendering by Perry Architects<\/p>\n<p>The roughly 90-foot-tall structure is expected to yield around 479,000 square feet, including 274,200 square feet of housing, 55,000 square feet of commercial space for the ground-level Safeway, and 149,600 square feet for the 291-car garage. Additional parking will be provided for 286 bicycles. Residential amenities will include a fitness center and community room. The podium-style complex will feature an irregularly shaped loop forming three separate podium-top courtyards. Additional open space will be available with a rooftop balcony overlooking Mission Street.<\/p>\n<p>The complex will include 379 units, comprising 65 studios, 185 one-bedrooms, 89 two-bedrooms, and 40 three-bedrooms. Of the 376 units, 76 will be deed-restricted as affordable units, allowing the application to invoke the State Density Bonus law and Senate Bill 330 to streamline the approval process and increase residential capacity.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-46669\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/06\/3350-Mission-Street-rendering-by-Perry-Architects-scaled.jpg\" alt=\"3350 Mission Street, rendering by Perry Architects\" width=\"2560\" height=\"1593\"  \/><\/p>\n<p class=\"wp-caption-text\">3350 Mission Street, rendering by Perry Architects<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-46667\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/06\/3350-Mission-Street-site-plan-illustration-by-Perry-Architects-scaled.jpg\" alt=\"3350 Mission Street site plan, illustration by Perry Architects\" width=\"2560\" height=\"1661\"  \/><\/p>\n<p class=\"wp-caption-text\">3350 Mission Street site plan, illustration by Perry Architects<\/p>\n<p><a href=\"https:\/\/sfyimby.com\/category\/perry-architects\" rel=\"nofollow noopener\" target=\"_blank\">Perry Architects<\/a> is responsible for the design, and C2 Collaborative is the landscape architect. Updated illustrations show a few minor tweaks to the original design shared last November, including wider windows, a double-height transparent entrance for the grocery store, and a dark black metal wrap to visually establish the ground floor. The exterior will be clad with white and wood-look solid phenolic resin panels.<\/p>\n<p>The Bernal Heights proposal is part of a six-project portfolio, led by Align Real Estate and Albertsons, to build over 4,000 apartments across the Bay Area. Of the six plans, five would produce a replacement Safeway store, and one in <a href=\"https:\/\/sfyimby.com\/neighborhoods\/oakland\" rel=\"nofollow noopener\" target=\"_blank\">Oakland<\/a> would not replace the existing store, which is owned by Albertsons but occupied by <a href=\"https:\/\/sfyimby.com\/category\/trader-joes-company\" rel=\"nofollow noopener\" target=\"_blank\">Trader Joe\u2019s<\/a>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-46668\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/06\/3350-Mission-Street-site-plan-image-via-plan-set.jpg\" alt=\"3350 Mission Street site plan, image via plan set\" width=\"2306\" height=\"1800\"  \/><\/p>\n<p class=\"wp-caption-text\">3350 Mission Street site plan, image via plan set<\/p>\n<p>The 2.15-acre property is located between Mission Street and San Jose Avenue, with a narrow access point extending to 29th Street near 3300 Mission Street. Future residents would be a two-minute walk from the Muni Light Rail station serviced by the J Church line, or an eight-minute bus ride from the 24th Street BART Station.<\/p>\n<p>Construction is estimated to cost around $170 million, a figure not inclusive of all development costs. The timeline for groundbreaking has not yet been shared.<\/p>\n<p> <a href=\"http:\/\/eepurl.com\/hdjqhz\" rel=\"nofollow noopener\" target=\"_blank\">Subscribe<\/a> to YIMBY\u2019s daily e-mail<\/p>\n<p><a href=\"https:\/\/google.com\/preferences\/source?q=https%3A%2F%2Fsfyimby.com\" target=\"_blank\" rel=\"noopener noreferrer nofollow\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/04\/google_preferred_source_badge.png\" width=\"245\" height=\"40\" alt=\"Make YIMBY preferred on Google\"\/><\/a><\/p>\n<p><a href=\"https:\/\/instagram.com\/yimbygram\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Follow<\/a> YIMBYgram for real-time photo updates<br \/><a href=\"https:\/\/www.facebook.com\/YIMBYFB\" rel=\"nofollow noopener\" target=\"_blank\">Like<\/a>\u00a0YIMBY on Facebook<br \/><a href=\"https:\/\/twitter.com\/yimbytweets\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Follow<\/a> YIMBY\u2019s Twitter for the latest in YIMBYnews<\/p>\n<p><a href=\"https:\/\/sfyimby.com\/category\/3350-mission-street\" rel=\"category tag nofollow noopener\" target=\"_blank\">3350 Mission Street<\/a> <a href=\"https:\/\/sfyimby.com\/category\/albertsons-companies\" rel=\"category tag nofollow noopener\" target=\"_blank\">Albertsons Companies<\/a> <a href=\"https:\/\/sfyimby.com\/category\/c2-collaborative\" rel=\"category tag nofollow noopener\" target=\"_blank\">C2 Collaborative<\/a> <a href=\"https:\/\/sfyimby.com\/category\/perry-architects\" rel=\"category tag nofollow noopener\" target=\"_blank\">Perry Architects<\/a><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><script async src=\"\/\/www.instagram.com\/embed.js\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"Formal plans have been filed for the Bernal Heights Safeway redevelopment at 3350 Mission Street in the Bernal&hellip;\n","protected":false},"author":2,"featured_media":356538,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[101,103,102,104,106,105],"class_list":["post-356537","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-francisco","tag-san-francisco","tag-san-francisco-headlines","tag-san-francisco-news","tag-sf","tag-sf-headlines","tag-sf-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/356537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=356537"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/356537\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/356538"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=356537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=356537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=356537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}