{"id":369607,"date":"2026-06-22T00:09:35","date_gmt":"2026-06-22T00:09:35","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/369607\/"},"modified":"2026-06-22T00:09:35","modified_gmt":"2026-06-22T00:09:35","slug":"gates-city-of-oakland-ca","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/369607\/","title":{"rendered":"Gates | City of Oakland, CA"},"content":{"rendered":"<p>Gates measuring over 3.5&#8242; in height in a front yard require Zoning Approval and must be at least 60% transparent.\u00a0Please review our Small Project Design Review Checklist (<a href=\"https:\/\/www.oaklandca.gov\/files\/assets\/city\/v\/1\/planning-amp-building\/documents\/sp\/design-standards\/small-project.1-2-unit-review-criteria-fillable-form.pdf\" target=\"_self\" title=\"Small-Project.1-2-Unit-Review-Criteria-Fillable-Form.pdf\" class=\"document ext-pdf\" rel=\"nofollow noopener\">1-2 family dwellings(PDF,\u00a0111KB)<\/a> | <a href=\"https:\/\/www.oaklandca.gov\/files\/assets\/city\/v\/1\/planning-amp-building\/documents\/sp\/design-standards\/small-project.3unit-review-criteria-fillable-form.pdf\" target=\"_self\" title=\"Small-Project.3Unit-Review-Criteria-FIllable-Form.pdf\" class=\"document ext-pdf\" rel=\"nofollow noopener\">3+ dwellings(PDF,\u00a0112KB)<\/a> | <a href=\"https:\/\/www.oaklandca.gov\/files\/assets\/city\/v\/1\/planning-amp-building\/documents\/sp\/design-standards\/small-project.nonres-review-criteria-fillable-form.pdf\" target=\"_self\" title=\"Small-Project.NonRes-Review-Criteria-Fillable-Form.pdf\" class=\"document ext-pdf\" rel=\"nofollow noopener\">commercial(PDF,\u00a084KB)<\/a>) for design guidelines specific to your project.<\/p>\n<p>One entry gate, trellis or other entry structure may be permitted in the front yard, as long as the maximum height and width does not exceed 10&#8242;.<\/p>\n<p>Please note that gates may not be constructed in the public right-of-way. You must provide a site plan showing the proposed location of your gate relative to the verified property lines and other built structures.<\/p>\n<p>Wood and metal gates over 7&#8242; also require a\u00a0Building Permit.\u00a0Gates will need an electrical permit if it has a powered gate operator. The gate can&#8217;t block any required stair, ramp, or door landings. Also, if the gate is on an egress path, it needs to be openable without a key, meet accessibility requirements, and will need panic hardware if the occupant load is high enough to require that.<\/p>\n<p>In commercial zones, gates higher than 8&#8242; but lower than 10&#8242; will be subject to Small Project Design Review.\u00a0<\/p>\n<p>In industrial zones, gates higher than 8&#8242; but lower than 12&#8242; will be subject to Small Project Design Review.<\/p>\n<p>EXEMPTIONS FROM DESIGN REVIEW\u00a0<\/p>\n<p>If your project falls under any of the criteria listed below, you may apply for exemption from Design Review for faster, simpler project review. Learn more about projects that are eligible on our\u00a0.<\/p>\n<p>&#13;<br \/>\nResidential gates measuring up to 10&#8242; tall and 10&#8242; wide in the front yard&#13;<br \/>\nResidential gates measuring up to 8&#8242; tall in a side yard or backyard&#13;<br \/>\nGates in commercial and industrial zones that are 8&#8242; or less&#13;<\/p>\n","protected":false},"excerpt":{"rendered":"Gates measuring over 3.5&#8242; in height in a front yard require Zoning Approval and must be at least&hellip;\n","protected":false},"author":2,"featured_media":369608,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[143,145,144],"class_list":["post-369607","post","type-post","status-publish","format-standard","has-post-thumbnail","category-oakland","tag-oakland","tag-oakland-headlines","tag-oakland-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/369607","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=369607"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/369607\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/369608"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=369607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=369607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=369607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}