{"id":370930,"date":"2026-06-23T01:28:10","date_gmt":"2026-06-23T01:28:10","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/370930\/"},"modified":"2026-06-23T01:28:10","modified_gmt":"2026-06-23T01:28:10","slug":"san-diego-city-council-considers-public-power","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/370930\/","title":{"rendered":"San Diego City Council considers public power"},"content":{"rendered":"<p>SAN DIEGO (KGTV) \u2013 Imagine paying your energy bill not to San Diego Gas and Electric, but to a utility run by the City of San Diego.\u00a0<\/p>\n<p>City leaders are trying to figure out if that&#8217;s possible.<\/p>\n<p>Right now, this is just an idea. The City said it has a responsibility to keep electrical costs low for residents. That&#8217;s what they&#8217;re trying to figure out. <\/p>\n<p>They&#8217;ve hired a company to study that, but there&#8217;s still a lot of uncertainty.<\/p>\n<p>\u201cThese assets are tangible and realistic,\u201d Isaiah Glasoe, Program Director for Public Power San Diego, said.<\/p>\n<p>Tangible assets are one thing; having the funding, planning, and resilience to handle unpredictability is another.<\/p>\n<p>This Phase Two study examines <a class=\"Link\" href=\"https:\/\/sandiego.hylandcloud.com\/211agendaonlinecouncil\/Documents\/ViewDocument\/Staff%20Report%20for%20-%20%20().pdf?meetingId=7055&amp;documentType=Agenda&amp;itemId=261991&amp;publishId=1110184&amp;isSection=false\" rel=\"nofollow noopener\" target=\"_blank\">the realistic financial opportunities and the headaches <\/a>that come with the City of San Diego&#8217;s attempt to run its own electric utility company.<\/p>\n<p>According to a <a class=\"Link\" href=\"https:\/\/sandiego.hylandcloud.com\/211agendaonlinecouncil\/Documents\/ViewDocument\/Item%20200%20-%20San%20Diego%20Public%20Power%20Feasibility%20Study%20Presentation%20-%20City%20Coun.pdf?meetingId=7055&amp;documentType=Agenda&amp;itemId=261991&amp;publishId=1110186&amp;isSection=false\" rel=\"nofollow noopener\" target=\"_blank\">city staff report<\/a>, it could cost the city somewhere between $2.4 billion and $7.6 billion for all of the transmission, distribution, and substations from SDG&amp;E to accomplish this possibility.<\/p>\n<p>The report says that while it&#8217;s possible for the city to undertake such a task, there are a lot of unknowns, and it would take a long time.<\/p>\n<p>A <a class=\"Link\" href=\"https:\/\/sandiego.hylandcloud.com\/211agendaonlinecouncil\/Documents\/ViewDocument\/San%20Diego%20Public%20Power%20Feasibility%20II%20Report.pdf?meetingId=7055&amp;documentType=Agenda&amp;itemId=261991&amp;publishId=1110185&amp;isSection=false\" rel=\"nofollow noopener\" target=\"_blank\">contracted report shows<\/a> that residents could potentially see up to $500 per year in savings, but that would be years down the road.<\/p>\n<p>Glasoe said the study\u2019s findings are exciting to see.<\/p>\n<p>\u201cThis study studied public power in the most conservative way possible.\u00a0Um,\u00a0one of the specific numbers is the revenue growth rate of SDG&amp;E,\u201d Glasoe said. \u201cThis study assumed a 4% revenue growth rate, and SDG&amp;E just applied for an 8.6% rate increase this year in 2028,\u00a0which shows that\u00a0even in the most conservative models,\u00a0we still save money by switching to public power.\u201d\u00a0<\/p>\n<p>SDG&amp;E doesn\u2019t feel the same.<\/p>\n<p>A spokesperson told ABC 10News in a statement:<\/p>\n<p>\u201cThe city&#8217;s flawed study omits major risks to safety and reliability and understates the costs of seizing the electric grid that was previously estimated to be at least $9.3 billion based on a more limited scope than what is being considered here,\u201d Anthony Wagner, an SDG&amp;E spokesperson, said. \u201cIn fact, as noted by Mayor Gloria, the study fails to utilize the correct methodology required by state regulators, which will raise costs and impact feasibility. Our customers and local taxpayers deserve accurate assessments.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"SAN DIEGO (KGTV) \u2013 Imagine paying your energy bill not to San Diego Gas and Electric, but to&hellip;\n","protected":false},"author":2,"featured_media":370931,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28],"tags":[1610,3683,52394,4840,74,76,75,5094],"class_list":["post-370930","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-diego","tag-city-council","tag-city-of-san-diego","tag-electric","tag-power","tag-san-diego","tag-san-diego-headlines","tag-san-diego-news","tag-sdge"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/370930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=370930"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/370930\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/370931"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=370930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=370930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=370930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}