{"id":37602,"date":"2025-11-04T14:58:08","date_gmt":"2025-11-04T14:58:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/37602\/"},"modified":"2025-11-04T14:58:08","modified_gmt":"2025-11-04T14:58:08","slug":"performance-shipping-secures-24-month-charter-at-30500-day","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/37602\/","title":{"rendered":"Performance Shipping Secures 24-Month Charter at $30,500\/Day"},"content":{"rendered":"<p>&#13;<br \/>\n    &#13;<br \/>\n&#13;<br \/>\n    &#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<\/p>\n<p>Performance Shipping (NASDAQ: PSHG) entered a 24-month time charter with SeaRiver Maritime (ExxonMobil) for the M\/T P. Long Beach, a 105,408 DWT LR2 Aframax, at a daily gross rate of US$30,500. The vessel is expected to deliver around mid-December 2025 after redelivery from its prior charter. The contract raises the company\u2019s minimum secured revenue backlog by about US$21.35 million and increases fleetwide secured backlog to approximately US$257 million (minimum basis as of Oct 1, 2025). The charter raises fixed coverage to ~52% for 2026 and ~41% for 2027, and the company says it lowers cash-flow breakeven for open days.<\/p>\n<p>Performance Shipping (NASDAQ: PSHG) ha stipulato un charter time di 24 mesi con SeaRiver Maritime (ExxonMobil) per la M\/T P. Long Beach, una LR2 Aframax da 105.408 DWT, a una tariffa lorda giornaliera di US$30.500. Si prevede che la nave consegni verso la met\u00e0 di dicembre 2025 dopo la ridelivery dal charter precedente. Il contratto aumenta l&#8217;obbligazione minima di entrate garantite della societ\u00e0 di circa US$21,35 milioni e porta l&#8217;arretrato di backlog garantito a livello di flotta a circa US$257 milioni (base minima al 1 ottobre 2025). Il charter incrementa la copertura fissa a ~52% per il 2026 e ~41% per il 2027, e la societ\u00e0 afferma che riduce il breakeven di cassa per i giorni aperti.<\/p>\n<p>Performance Shipping (NASDAQ: PSHG) entr\u00f3 en un charter time de 24 meses con SeaRiver Maritime (ExxonMobil) para el M\/T P. Long Beach, una LR2 Aframax de 105.408 DWT, a una tarifa bruta diaria de US$30.500. Se espera que la nave entregue alrededor de mediados de diciembre de 2025 tras la redelivery de su charter anterior. El contrato eleva aproximadamente la cartera de ingresos asegurados m\u00ednimos de la empresa en US$21,35 millones y aumenta la cartera de backlog asegurado a nivel de flota a aproximadamente US$257 millones (base m\u00ednima a 1 de oct de 2025). El charter eleva la cobertura fija a ~52% para 2026 y ~41% para 2027, y la compa\u00f1\u00eda dice que reduce el umbral de flujo de caja para los d\u00edas de apertura.<\/p>\n<p>Performance Shipping (NASDAQ: PSHG)\ub294 SeaRiver Maritime(ExxonMobil)\uacfc 24\uac1c\uc6d4 \uae30\uac04\uc758 \ud0c0\uc784 charter\ub97c \uccb4\uacb0\ud588\uc73c\uba70, M\/T P. Long Beach, 105,408 DWT LR2 Aframax,\uc758 \uc77c\uc77c \ucd1d \uc694\uc728\uc740 US$30,500\uc774\ub2e4. \uc774 \uc120\ubc15\uc740 \uc774\uc804 \ucc28\ud130\uc5d0\uc11c \uc7ac\uc778\ub3c4\ub41c \ud6c4 2025\ub144 12\uc6d4 \uc911\uc21c\uacbd \uc778\ub3c4\ub420 \uac83\uc73c\ub85c \uc608\uc0c1\ub41c\ub2e4. \uc774 \uacc4\uc57d\uc740 \ud68c\uc0ac\uc758 \ucd5c\uc18c \ud655\ubcf4 \ub9e4\ucd9c \uc794\uace0\ub97c \uc57d US$21.35\ubc31\ub9cc\uc73c\ub85c \ub298\ub9ac\uace0, \uc120\ub300 \uc804\uccb4\uc758 \ud655\ubcf4\ub41c \uc794\uace0\ub97c \ub300\ub7b5 US$257\ubc31\ub9cc\uc73c\ub85c \uc99d\uac00\uc2dc\ud0a8\ub2e4(2025\ub144 10\uc6d4 1\uc77c \uae30\uc900\uc758 \ucd5c\uc18c\uce58). \uc774 \ucc28\ud130\ub294 2026\ub144 \uc57d 52%, 2027\ub144 \uc57d 41%\uc758 \uace0\uc815 \ucee4\ubc84\ub9ac\uc9c0\ub97c \uc99d\uac00\uc2dc\ud0a4\uba70, \ud68c\uc0ac\ub294 \uc5f4\ub9b0 \ub0a0\uc758 \ud604\uae08 \ud750\ub984 \uc190\uc775\ubd84\uae30\uc810\uc774 \ub0ae\uc544\uc9c4\ub2e4\uace0 \ub9d0\ud55c\ub2e4.<\/p>\n<p>Performance Shipping (NASDAQ : PSHG) a conclu un charter de temps de 24 mois avec SeaRiver Maritime (ExxonMobil) pour le M\/T P. Long Beach, un LR2 Aframax de 105 408 DWT, \u00e0 un taux brut journalier de US$30 500. Le navire devrait livrer vers la mi-d\u00e9cembre 2025 apr\u00e8s la redelivery de son charter pr\u00e9c\u00e9dent. Le contrat porte l&#8217;arri\u00e9r\u00e9 de revenus s\u00e9curis\u00e9s minimum de la soci\u00e9t\u00e9 d&#8217;environ US$21,35 millions et augmente l&#8217;arri\u00e9r\u00e9 de backlog s\u00e9curis\u00e9 \u00e0 l&#8217;\u00e9chelle de la flotte \u00e0 environ US$257 millions (base minimum au 1 octobre 2025). Le charter porte la couverture fixe \u00e0 environ 52% pour 2026 et 41% pour 2027, et la soci\u00e9t\u00e9 indique qu&#8217;il r\u00e9duit le seuil de flux de tr\u00e9sorerie pour les jours non utilis\u00e9s.<\/p>\n<p>Performance Shipping (NASDAQ: PSHG) hat mit SeaRiver Maritime (ExxonMobil) einen 24-monatigen Zeit-Charter f\u00fcr die M\/T P. Long Beach abgeschlossen, eine LR2 Aframax mit 105.408 DWT, zu einem t\u00e4glichen Bruttorate von US$30.500. Das Schiff wird voraussichtlich Mitte Dezember 2025 nach der R\u00fccklieferung aus dem vorherigen Charter \u00fcbergeben. Der Vertrag erh\u00f6ht den minimal gesicherten Umsatz-Backlog des Unternehmens um ca. US$21,35 Mio. und erh\u00f6ht den gesam\u00adten fleetweiten gesicherten Backlog auf ca. US$257 Mio. (Mindestbasis Stand 1. Okt. 2025). Der Charter erh\u00f6ht die feste Abdeckung auf ca. 52% f\u00fcr 2026 und ca. 41% f\u00fcr 2027, und das Unternehmen sagt, er senke den Cash-Flow-Breakeven f\u00fcr offene Tage.<\/p>\n<p>Performance Shipping (NASDAQ: PSHG) \u0623\u0628\u0631\u0645\u062a \u0639\u0642\u062f \u0625\u064a\u062c\u0627\u0631 \u0632\u0645\u0646\u064a \u0644\u0645\u062f\u0629 24 \u0634\u0647\u0631\u064b\u0627 \u0645\u0639 SeaRiver Maritime (ExxonMobil) \u0644\u0644\u0633\u0641\u064a\u0646\u0629 M\/T P. Long Beach\u060c \u0648\u0647\u064a LR2 Aframax \u0628\u0648\u0632\u0646 105,408 DWT\u060c \u0628\u0633\u0639\u0631 \u064a\u0648\u0645\u064a \u0625\u062c\u0645\u0627\u0644\u064a \u0642\u062f\u0631\u0647 US$30,500. \u0645\u0646 \u0627\u0644\u0645\u062a\u0648\u0642\u0639 \u0623\u0646 \u062a\u0633\u0644\u0645 \u0627\u0644\u0633\u0641\u064a\u0646\u0629 \u062d\u0648\u0627\u0644\u064a \u0645\u0646\u062a\u0635\u0641 \u062f\u064a\u0633\u0645\u0628\u0631 2025 \u0628\u0639\u062f \u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646 \u0627\u0644\u0639\u0642\u062f \u0627\u0644\u0633\u0627\u0628\u0642. \u064a\u0632\u064a\u062f \u0627\u0644\u0639\u0642\u062f \u0631\u0635\u064a\u062f \u0627\u0644\u0625\u064a\u0631\u0627\u062f\u0627\u062a \u0627\u0644\u0645\u0624\u0645\u0646\u0629 \u0627\u0644\u0623\u062f\u0646\u0649 \u0644\u0644\u0634\u0631\u0643\u0629 \u0628\u0646\u062d\u0648 US$21.35 \u0645\u0644\u064a\u0648\u0646 \u0648\u064a\u0631\u0641\u0639 \u0627\u0644\u0631\u0635\u064a\u062f \u0627\u0644\u0625\u062c\u0645\u0627\u0644\u064a \u0627\u0644\u0645\u0624\u0645\u0651\u0646 \u0644\u0644\u0623\u0633\u0637\u0648\u0644 \u0625\u0644\u0649 \u0645\u0627 \u064a\u0642\u0631\u0628 \u0645\u0646 US$257 \u0645\u0644\u064a\u0648\u0646 (\u0639\u0644\u0649 \u0623\u0633\u0627\u0633 \u0627\u0644\u062d\u062f \u0627\u0644\u0623\u062f\u0646\u0649 \u0627\u0639\u062a\u0628\u0627\u0631\u0627\u064b \u0645\u0646 1 \u0623\u0643\u062a\u0648\u0628\u0631 2025). \u064a\u0631\u0641\u0639 \u0627\u0644\u0639\u0642\u062f \u0627\u0644\u062a\u063a\u0637\u064a\u0629 \u0627\u0644\u062b\u0627\u0628\u062a\u0629 \u0625\u0644\u0649 \u0646\u062d\u0648 52% \u0644\u0633\u0646\u0629 2026 \u0648\u0646\u062d\u0648 41% \u0644\u0633\u0646\u0629 2027\u060c \u0648\u062a\u0642\u0648\u0644 \u0627\u0644\u0634\u0631\u0643\u0629 \u0625\u0646\u0647 \u064a\u062e\u0641\u0636 \u0646\u0642\u0637\u0629 \u0627\u0644\u062a\u0639\u0627\u062f\u0644 \u0627\u0644\u0646\u0642\u062f\u064a \u0644\u0644\u062b\u063a\u0631\u0627\u062a \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629.<\/p>\n<p>Positive<\/p>\n<p>          &#13;<br \/>\n            &#13;<br \/>\n                    US$21.35 million added to secured revenue backlog&#13;<br \/>\n            &#13;<br \/>\n                    Fleet backlog increased to approximately US$257 million&#13;<br \/>\n            &#13;<br \/>\n                    Two-year charter at US$30,500\/day&#13;<br \/>\n            &#13;<br \/>\n                    Fixed charter coverage ~52% for 2026&#13;<br \/>\n            &#13;<br \/>\n                    Fixed charter coverage ~41% for 2027&#13;<br \/>\n            &#13;<\/p>\n<p>Negative<\/p>\n<p>          &#13;<br \/>\n            &#13;<br \/>\n                    Coverage figures pending Suezmax employment&#13;<br \/>\n            &#13;<br \/>\n                    Vessel delivery timing expected only around mid-December 2025&#13;<br \/>\n            &#13;<br \/>\n                    Remaining ~48% of 2026 days exposed to spot market&#13;<br \/>\n            &#13;<\/p>\n<p>      &#13;<\/p>\n<p>&#13;<br \/>\n          Insights  &#13;\n        <\/p>\n<p>&#13;<br \/>\n    &#13;<\/p>\n<p class=\"tldr\">Recharter with ExxonMobil raises secured revenue and fixed coverage, a clear near-term positive for cash flow stability.<\/p>\n<p>Performance Shipping Inc. signed a 24-month time charter for the M\/T P. Long Beach at $30,500 per day, starting around mid-December 2025. The deal adds about $21.35 million to the company\u2019s minimum secured revenue backlog and helps raise fleetwide secured backlog to approximately $257 million as of October 1, 2025.<\/p>\n<p>The business mechanism is straightforward: locking a multi-year contract with a major energy firm converts spot exposure into contracted revenue and improves near-term cash visibility. The announcement also states fixed charter coverage increases to about 52% for 2026 and 41% for 2027, which, if realized, should lower volatility in operating cash flow and reduce the company\u2019s cash flow breakeven for open days.<\/p>\n<p>Key dependencies include actual delivery timing (expected around mid-December 2025) and the minimum charter duration. Watch for redelivery timing and any subsequent employment updates for the recently acquired Suezmax tankers, as those will affect the stated 52% and 41% coverage figures. Monitor near-term fleet employment notices and realized daily hire receipts over the next 1\u201312 months.<\/p>\n<p>          &#13;<br \/>\n        &#13;<\/p>\n<p>&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n    &#13;<br \/>\n    &#13;<br \/>\n    &#13;<br \/>\n&#13;<br \/>\n    &#13;<br \/>\n      11\/04\/2025 &#8211; 09:27 AM&#13;<br \/>\n    &#13;<br \/>\n&#13;<\/p>\n<p>ATHENS, Greece, Nov.  04, 2025  (GLOBE NEWSWIRE) &#8212; November 4, 2025 \u2013 Performance Shipping Inc. (NASDAQ: <a href=\"https:\/\/www.stocktitan.net\/overview\/PSHG\" title=\"View PSHG stock overview\" class=\"symbol-link\" rel=\"nofollow noopener\" target=\"_blank\">PSHG<\/a>) (\u201cwe\u201d or the \u201cCompany\u201d), a global shipping company specializing in the ownership of tanker vessels, today announced that it has entered into a time charter contract with SeaRiver Maritime, a wholly owned subsidiary of ExxonMobil Corporation (\u201cSeaRiver\u201d or the \u201cCharterer\u201d), for its M\/T P. Long Beach (the \u201cvessel\u201d), a 105,408 DWT LR2 Aframax tanker, built in 2013.<\/p>\n<p>Under the terms of the agreement, the vessel will be chartered for a period of 24 months, plus or minus 30 days at the Charterer\u2019s option, at a daily gross charter rate of US$30,500. The vessel will be delivered to SeaRiver upon redelivery from her previous charterer, expected to be around mid-December 2025.<\/p>\n<p>This new charter increases the Company\u2019s fleetwide secured revenue backlog by approximately US$21.35 million for the minimum duration of the charter, further enhancing the Company\u2019s total revenue.<\/p>\n<p>Commenting on this charter, Andreas Michalopoulos, the Company\u2019s Chief Executive Officer, stated:<\/p>\n<p>\u201cWe are pleased to announce that one of our two Aframax tankers, currently operating under medium-term charters expiring in December, has been rechartered well ahead of schedule at an attractive charter rate. This new time charter highlights our long-standing and mutually beneficial partnership with ExxonMobil Corporation, a leading energy major with whom we have conducted repeat business, reaffirming the Charterer\u2019s continued confidence in the quality, safety, and reliability of our fleet operations.<\/p>\n<p>\u201cConcluded in a seasonally strong market environment, this charter reflects both the favorable market dynamics and a positive outlook for our sector. It enables us to further optimize our fleet deployment strategy, increasing our fleet-wide total secured revenue backlog to approximately US$257 million, based on the minimum duration of each charter as of October 1, 2025. This contract also increases our fixed charter coverage to approximately 52% for 2026 and 41% for 2027, pending secured employment for our recently acquired Suezmax tankers, and lowers our cash flow <a href=\"https:\/\/www.stocktitan.net\/articles\/operating-leverage-quick-primer\" title=\"Read: Operating Leverage: Quick Primer for Stock Investors\" class=\"article-link\" rel=\"noopener nofollow\" target=\"_blank\">breakeven<\/a> rate for open days.\u201d<\/p>\n<p>About the Company<\/p>\n<p>Performance Shipping Inc. is a global provider of shipping transportation services through its ownership of tanker vessels. The Company employs its fleet on spot voyages, through pool arrangements, and on time charters.<\/p>\n<p>Cautionary Statement Regarding Forward-Looking Statements<\/p>\n<p>Matters discussed in this press release may constitute forward-looking statements. The Private Securities Litigation Reform Act of 1995 provides safe harbor protections for forward-looking statements in order to encourage companies to provide prospective information about their business. Forward-looking statements include, but are not limited to, statements concerning plans, objectives, goals, strategies, future events or performance, and underlying assumptions and other statements, which are other than statements of historical facts, including with respect to charter employment and our revenue backlog. The words \u201cbelieve,&#8221; \u201canticipate,&#8221; \u201cintends,&#8221; \u201cestimate,&#8221; \u201cforecast,&#8221; \u201cproject,&#8221; \u201cplan,&#8221; \u201cpotential,&#8221; \u201cwill,&#8221; \u201cmay,&#8221; \u201cshould,&#8221; \u201cexpect,&#8221; \u201ctargets,&#8221; \u201clikely,&#8221; \u201cwould,&#8221; \u201ccould,&#8221; \u201cseeks,&#8221; \u201ccontinue,&#8221; \u201cpossible,&#8221; \u201cmight,&#8221; \u201cpending\u201d and similar expressions, terms or phrases may identify forward-looking statements.<\/p>\n<p>The forward-looking statements in this press release are based upon various assumptions, many of which are based, in turn, upon further assumptions, including, without limitation, our management\u2019s examination of historical operating trends, data contained in our records and other data available from third parties. Although we believe that these assumptions were reasonable when made, because these assumptions are inherently subject to significant uncertainties and contingencies which are difficult or impossible to predict and are beyond our control, we cannot assure you that we will achieve or accomplish these expectations, beliefs, or projections.<\/p>\n<p>In addition to these important factors, other important factors that, in our view, could cause actual results to differ materially from those discussed in the forward-looking statements include, but are not limited to: the strength of world economies, fluctuations in currencies and interest rates, general market conditions, including fluctuations in charter rates and vessel values, changes in demand in the tanker shipping industry, changes in the supply of vessels, changes in worldwide oil production and consumption and storage, changes in our operating expenses, including bunker prices, crew costs, drydocking and insurance costs, our future operating or financial results, availability of financing and refinancing including with respect to vessels we agree to acquire, changes in governmental rules and regulations or actions taken by regulatory authorities, potential liability from pending or future litigation, general domestic and international political conditions, the length and severity of epidemics and pandemics, including COVID-19, and their impact on the demand for seaborne transportation of petroleum and other types of products, general domestic and international political conditions or events, including \u201ctrade wars\u201d, armed conflicts including the war in Ukraine and the war between Israel and Hamas, the imposition of new international sanctions, acts by terrorists or acts of piracy on ocean-going vessels, potential disruption of shipping routes due to accidents, labor disputes or political events, vessel breakdowns and instances of off-hires and other important factors. Please see our filings with the US Securities and Exchange Commission for a more complete discussion of these and other risks and uncertainties.<\/p>\n<p> <img decoding=\"async\" alt=\"\" class=\"__GNW8366DE3E__IMG\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/ti\"\/> <br \/><img decoding=\"async\" alt=\"\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2025\/11\/Performance-Shipping-Inc-.png\" referrerpolicy=\"no-referrer-when-downgrade\"\/>Corporate Contact:<br \/>\nAndreas Michalopoulos<br \/>\nChief Executive Officer, Director and Secretary<br \/>\nTelephone: +30-216-600-2400<br \/>\nEmail: amichalopoulos@pshipping.com<br \/>\nWebsite: www.pshipping.com <\/p>\n<p>Investor and Media Relations:<br \/>\nEdward Nebb<br \/>\nComm-Counsellors, LLC<br \/>\nTelephone: + 1-203-972-8350<br \/>\nEmail: enebb@optonline.net<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n    &#13;<br \/>\n      &#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n  &#13;<br \/>\n&#13;<\/p>\n<p>&#13;<br \/>\n    FAQ  &#13;\n  <\/p>\n<p>&#13;<br \/>\n  &#13;<br \/>\n  &#13;<\/p>\n<p>        What are the terms of Performance Shipping&#8217;s PSHG charter for M\/T P. Long Beach?<\/p>\n<p>&#13;<br \/>\n          A 24-month time charter at US$30,500\/day with delivery expected around mid-December 2025.&#13;\n        <\/p>\n<p>    &#13;<br \/>\n  &#13;<\/p>\n<p>        How much does the P. Long Beach charter add to PSHG&#8217;s secured backlog?<\/p>\n<p>&#13;<br \/>\n          It increases the minimum secured revenue backlog by approximately US$21.35 million.&#13;\n        <\/p>\n<p>    &#13;<br \/>\n  &#13;<\/p>\n<p>        What is PSHG&#8217;s fleetwide secured backlog after the new charter?<\/p>\n<p>&#13;<br \/>\n          The company reports a fleetwide secured backlog of approximately US$257 million on a minimum-duration basis as of Oct 1, 2025.&#13;\n        <\/p>\n<p>    &#13;<br \/>\n  &#13;<\/p>\n<p>        How does the new charter affect PSHG&#8217;s 2026 and 2027 coverage?<\/p>\n<p>&#13;<br \/>\n          The contract raises fixed charter coverage to about 52% for 2026 and 41% for 2027.&#13;\n        <\/p>\n<p>    &#13;<br \/>\n  &#13;<\/p>\n<p>        When will the M\/T P. Long Beach start the new PSHG charter with SeaRiver?<\/p>\n<p>&#13;<br \/>\n          The vessel is to be delivered to SeaRiver upon redelivery from its previous charter, expected around mid-December 2025.&#13;\n        <\/p>\n<p>    &#13;<br \/>\n  &#13;<\/p>\n<p>        Does the PSHG announcement mention counterparty details for the charter?<\/p>\n<p>&#13;<br \/>\n          Yes; the charterer is SeaRiver Maritime, a wholly owned subsidiary of ExxonMobil Corporation.&#13;\n        <\/p>\n<p>    &#13;<br \/>\n  &#13;<br \/>\n&#13;<br \/>\n&#13;<br \/>\n    &#13;<br \/>\n&#13;<\/p>\n","protected":false},"excerpt":{"rendered":"&#13; &#13; &#13; &#13; &#13; &#13; &#13; &#13; Performance Shipping (NASDAQ: PSHG) entered a 24-month time charter with&hellip;\n","protected":false},"author":2,"featured_media":37603,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[26167,26169,26175,26168,26174,26172,26171,18308,131,133,132,26173,26165,26163,26161,26160,26162,26164,26176,26166,26170],"class_list":["post-37602","post","type-post","status-publish","format-standard","has-post-thumbnail","category-long-beach","tag-26167","tag-24-months","tag-41-2027-coverage","tag-500-per-day","tag-52-2026-coverage","tag-aframax-tanker","tag-backlog-us257-million","tag-exxonmobil","tag-long-beach","tag-long-beach-headlines","tag-long-beach-news","tag-lr2","tag-m-t-p-long-beach","tag-nasdaq-pshg","tag-performance-shipping","tag-performance-shipping-inc","tag-pshg","tag-seariver-maritime","tag-tanker-shipping","tag-time-charter","tag-us21-35-million"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/37602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=37602"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/37602\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/37603"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=37602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=37602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=37602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}