{"id":397242,"date":"2026-07-14T00:04:22","date_gmt":"2026-07-14T00:04:22","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/397242\/"},"modified":"2026-07-14T00:04:22","modified_gmt":"2026-07-14T00:04:22","slug":"eyes-on-the-street-progress-on-chandler-center-running-bike-lanes","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/397242\/","title":{"rendered":"Eyes on the Street: Progress on Chandler Center-Running Bike Lanes"},"content":{"rendered":"<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.losangelesbicycleattorney.com\/\"><img loading=\"lazy\" decoding=\"async\" width=\"9479\" height=\"1171\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/04\/CohenLawPartners-LongBeachizeAd-RiderCity-1.jpg\" alt=\"LongBeachize_Ad_Concepts\" class=\"wp-image-142050\"  \/><\/a>This article supported by Los Angeles Bicycle Attorney as part of a general sponsorship package. All opinions in the article are that of the author, and do not necessarily reflect those of LABA. Click on the ad for more information.<\/p>\n<p class=\"wp-block-paragraph\">The city of L.A. is spending $7 million to reconfigure about three miles of existing bike lanes on Chandler Boulevard. <\/p>\n<p class=\"wp-block-paragraph\">The <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/03\/09\/bike-updates-griffith-park-chandler-blvd-terra-bella-st-and-westside-plans\">Chandler Bicycle Connection project<\/a> extends from near the North Hollywood Metro B and G Line Station west to near Coldwater Canyon Avenue \u2013 all along the bus rapid transit G Line. The city is moving existing basic right-side bike lanes to instead run on the left side of the street \u2013 along the median. The left-side (center-running) configuration is designed to minimize removal of parking spaces for cars.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/ChandlerBikewaymap2021LADOT.jpg\"><img loading=\"lazy\" decoding=\"async\" height=\"449\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/ChandlerBikewaymap2021LADOT.jpg\" alt=\"\" class=\"wp-image-227144\"  \/><\/a>LADOT map of Chandler Bicycle Connection project \u2013 from <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/ladotlivablestreets-cms.org\/uploads\/732b933270ff4d4ea978c75cb9fcfdbb.pdf\">2021 presentation<\/a><\/p>\n<p class=\"wp-block-paragraph\">The <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/bsky.app\/profile\/lintonjoe.bsky.social\/post\/3mbrid5rw2k2y\">project scope<\/a> includes \u201cremoving concrete median islands; reconstructing street pavements, curb and gutter, and curb ramps to current accessibility standards; modifying existing traffic signal modifications [sic]; and installing concrete transit platforms.\u201d Even with all that concrete curb work underway, bicyclists will only get plastic protection: \u201cClass IV [protected] bike lanes with raised rubber defenders [basically\u00a0<a href=\"https:\/\/www.instagram.com\/p\/DVJRShaAd6_\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">armadillos<\/a>] and K-71 bollards [soft-hit white plastic bollards].\u201d<\/p>\n<p class=\"wp-block-paragraph\">City Councilmember Adrin Nazarian recently <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.instagram.com\/p\/DaqgEjPjIh6\/?img_index=1\">shared a couple of photos of newly protected Chandler bike lanes<\/a>. Streetsblog checked out the under construction facility yesterday.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_10.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"853\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_10.jpeg\" alt=\"\" class=\"wp-image-227146\"  \/><\/a>The Chandler Boulevard bikeway project is currently under construction, with plenty of \u201cbike lane closed\u201d and \u201cbike detour\u201d signs posted throughout<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_02.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"655\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_02.jpeg\" alt=\"\" class=\"wp-image-227147\"  \/><\/a>For most of the project the former right-side bike lanes have already been scraped away, and the new left-side bike lanes have been striped. Plastic bollards were not installed yet.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_06.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"764\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_06.jpeg\" alt=\"\" class=\"wp-image-227153\"  \/><\/a>Much of the pavement condition on this three-mile stretch of Chandler is not very good. The relocated bike lanes are now along the landscaped median where G Line buses run; this location has plenty of damaged and uneven stretches. Some of the bike lane pavement is uneven due to root damage from adjacent trees in the median.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_03.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"611\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_03.jpeg\" alt=\"\" class=\"wp-image-227148\"  \/><\/a>Chandler bike lane striping is not complete at various car-left-turn pockets. Visible in the center\/left of the above photo, the city did fairly expensive new curb\/gutter\/drainage work at this location.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_05.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"1024\" width=\"941\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_05.jpeg\" alt=\"\" class=\"wp-image-227156\"  \/><\/a>The Chandler project has refurbished curbs and gutters and has resurfaced patches of asphalt in several locations along the reconfigured bikeway. Some of this curb work is to resolve <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/www.google.com\/maps\/@34.1686504,-118.4043001,3a,75y,222.66h,83.16t\/data=!3m7!1e1!3m5!1s92BT61Phf0sDnJojG1pYvQ!2e0!6shttps:%2F%2Fstreetviewpixels-pa.googleapis.com%2Fv1%2Fthumbnail%3Fcb_client%3Dmaps_sv.tactile%26w%3D900%26h%3D600%26pitch%3D6.842376775434801%26panoid%3D92BT61Phf0sDnJojG1pYvQ%26yaw%3D222.66472312644436!7i16384!8i8192!5m1!1e2?entry=ttu&amp;g_ep=EgoyMDI2MDcwOC4wIKXMDSoASAFQAw%3D%3D\">drainage issues<\/a>, but it is disappointing that almost none of the concrete curbs installed actually protect cyclists.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/03\/ChandlerBikewaydiagram2024vid.jpg\"><img loading=\"lazy\" decoding=\"async\" height=\"604\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/ChandlerBikewaydiagram2024vid.jpg\" alt=\"\" class=\"wp-image-224633\"  \/><\/a>Additional green paint and intersection treatments are apparently on the way at intersections. Some will be like the above LADOT plan for Chandler \u2013 via\u00a0<a href=\"https:\/\/www.youtube.com\/watch?v=8TDdFjefVaA\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">2024 L.A. City video<\/a><\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_11.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"723\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_11.jpeg\" alt=\"\" class=\"wp-image-227149\"  \/><\/a>The eastbound side of three long blocks of the project (from Colfax Avenue to Tujunga Avenue) appears pretty much complete. For this short stretch, the bike lanes transition to the conventional (safer and more useful) right-side parking-protected bike lanes.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_12.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"711\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_12.jpeg\" alt=\"\" class=\"wp-image-227150\"  \/><\/a>More or less completed protected bike lane near Tujunga Avenue. Along North Hollywood Park, where eastbound Chandler widens to 60+ feet, the protected bike lanes run between diagonal parking (where the city added new concrete wheel stops) and the park.<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_08.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"686\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_08.jpeg\" alt=\"\" class=\"wp-image-227154\"  \/><\/a>One additional block of eastbound right-side protected bike lane appears complete \u2013 west of Coldwater Canyon Avenue, where there is no parking and no sidewalk<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_09.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"606\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_09.jpeg\" alt=\"\" class=\"wp-image-227155\"  \/><\/a>West of Coldwater, Chandler lacks sidewalks, so some pedestrians walk in the street<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_13.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"640\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_13.jpeg\" alt=\"\" class=\"wp-image-227151\"  \/><\/a>For the Chandler project at North Hollywood Station, the city is installing what appears to be a concrete bus boarding island<\/p>\n<p><a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/wp-content\/uploads\/sites\/13\/2026\/07\/Chandler2026Jul12_14.jpeg\"><img loading=\"lazy\" decoding=\"async\" height=\"783\" width=\"1024\" src=\"https:\/\/www.newsbeep.com\/us-ca\/wp-content\/uploads\/2026\/07\/Chandler2026Jul12_14.jpeg\" alt=\"\" class=\"wp-image-227152\"  \/><\/a>Additional photo of Chandler Bicycle Connection construction at NoHo Station<\/p>\n<p class=\"wp-block-paragraph\">Find plenty of additional Chandler project details at <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/la.streetsblog.org\/2026\/03\/09\/bike-updates-griffith-park-chandler-blvd-terra-bella-st-and-westside-plans\">SBLA coverage of the March 2026 groundbreaking<\/a>, <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/bsky.app\/profile\/lintonjoe.bsky.social\/post\/3mbrhh2w7lc2y\">SBLA Editor Joe Linton\u2019s Bluesky thread on the January 2026 contract approval<\/a>, and the <a rel=\"noopener noreferrer nofollow\" target=\"_blank\" href=\"https:\/\/ladotlivablestreets.org\/projects\/Chandler-Bicycle-Connection\">Department of Transportation (LADOT) project webpage<\/a>.<\/p>\n<p>          <script async src=\"\/\/www.instagram.com\/embed.js\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"This article supported by Los Angeles Bicycle Attorney as part of a general sponsorship package. All opinions in&hellip;\n","protected":false},"author":2,"featured_media":397243,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[48,52,51,47,50,49],"class_list":["post-397242","post","type-post","status-publish","format-standard","has-post-thumbnail","category-los-angeles","tag-la","tag-la-headlines","tag-la-news","tag-los-angeles","tag-los-angeles-headlines","tag-los-angeles-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/397242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=397242"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/397242\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/397243"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=397242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=397242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=397242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}