{"id":406866,"date":"2026-07-21T18:45:26","date_gmt":"2026-07-21T18:45:26","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/406866\/"},"modified":"2026-07-21T18:45:26","modified_gmt":"2026-07-21T18:45:26","slug":"glwa-announces-81m-plan-to-improve-water-main-along-14-mile-in-oakland-county","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/406866\/","title":{"rendered":"GLWA announces $81M plan to improve water main along 14 Mile in Oakland County"},"content":{"rendered":"<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">OAKLAND COUNTY, Mich. \u2013 The Great Lakes Water Authority (GLWA) announced its plan to improve the water main along 14 Mile Road in Oakland County.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">There have been four major breaks in the last seven years in the water main along <a href=\"https:\/\/www.clickondetroit.com\/news\/local\/2026\/03\/09\/crews-working-to-restore-water-main-break-in-oakland-county\/\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.clickondetroit.com\/news\/local\/2026\/03\/09\/crews-working-to-restore-water-main-break-in-oakland-county\/\">14 Mile Road<\/a>, causing major disruption for the surrounding communities.<\/p>\n<p>Pictured is the pipe replacement section on the 14 Mile Road water main replacement and monitoring project. (GLWA)<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">On July 21, GLWA announced its $81 million investment to improve the water main that\u2019s been causing headaches for many Oakland County residents.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">\u201cThe repeated water main breaks along the 14 Mile corridor made it clear that we need a more comprehensive approach to ensuring the level of service our communities need and deserve,\u201d said Suzanne R. Coffey, P.E., Chief Executive Officer, GLWA. \u201cThis investment reflects our commitment to replacing aging infrastructure, strengthening system operation, and deploying advanced monitoring technology so we can identify problems earlier and potentially reduce future disruptions.\u201d<\/p>\n<p>Project phases<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">The work along 14 Mile Road will be in two phases. Here\u2019s a breakdown:<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">Phase One<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">GLWA crews are expected to replace three miles of 48-inch prestressed concrete cylinder pipe (PCCP) with a 54-inch steel pipe. This will be located along 14 Mile Road from just west of Haggerty Road to just east of Farmington Road.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">Construction for phase one begins mid-November and will run until early 2028.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">Phase Two<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">During phase two of the project, GLWA crews are expected to inspect three miles of the 54-inch PCCP along 14 Mile Road from just east of Farmington Road to GLWA\u2019s Franklin Pump Station. Crews will also renew pipe segments during inspection and install an Acoustic Fiber Optic Monitoring System within the entire three-mile segment of PCCP.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">Phase two will begin once phase one is complete. <\/p>\n<p>The project timeline for the 14 Mile Road water main replacement and monitoring project (GLWA)14 Mile traffic<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">GLWA said traffic will be impacted along 14 Mile Road in the construction area. Details on the traffic plan have not yet been announced. <\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">There will be a series of public open houses to keep impacted communities informed about the project. GLWA will release details on the open houses soon. <\/p>\n<p>Water impact<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">According to GLWA, there should be little to no impact on water service during construction. Water will be in service for household and business use during construction.<\/p>\n<p class=\"Box-_wrDxHtU__Box-sc-10sa3ie-0 Text-nO2aZ44r__TextBase-sc-s2hv5x-0 jJNfBD fSvavs article-text\">You can watch GLWA\u2019s announcement on July 21 in the video below<\/p>\n<p>Copyright 2026 by WDIV ClickOnDetroit &#8211; All rights reserved.<\/p>\n","protected":false},"excerpt":{"rendered":"OAKLAND COUNTY, Mich. \u2013 The Great Lakes Water Authority (GLWA) announced its plan to improve the water main&hellip;\n","protected":false},"author":2,"featured_media":406867,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[10975,143,904,145,144],"class_list":["post-406866","post","type-post","status-publish","format-standard","has-post-thumbnail","category-oakland","tag-farmington-hills","tag-oakland","tag-oakland-county","tag-oakland-headlines","tag-oakland-news"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/406866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=406866"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/406866\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/406867"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=406866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=406866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=406866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}