{"id":432276,"date":"2026-08-14T00:52:08","date_gmt":"2026-08-14T00:52:08","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/432276\/"},"modified":"2026-08-14T00:52:08","modified_gmt":"2026-08-14T00:52:08","slug":"tesla-plans-a-massive-124-stall-charging-hub-in-the-middle-of-sf","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/432276\/","title":{"rendered":"Tesla Plans a Massive 124-Stall Charging Hub in the Middle of SF"},"content":{"rendered":"<p>Tesla is making a major bet on demand from urban EV owners by planning an unusually <a target=\"_self\" class=\"\" href=\"https:\/\/www.businessinsider.com\/tesla-supercharger-map\" data-track-click=\"{&quot;element_name&quot;:&quot;body_link&quot;,&quot;event&quot;:&quot;tout_click&quot;,&quot;index&quot;:&quot;bi_value_unassigned&quot;,&quot;product_field&quot;:&quot;bi_value_unassigned&quot;}\" rel=\"nofollow noopener\">large charging hub<\/a> in San Francisco.<\/p>\n<p>Plans filed with the city show that Tesla is planning for 124 V4 <a target=\"_self\" class=\"\" href=\"https:\/\/www.businessinsider.com\/tesla-supercharger-lines-single-file-charging-evs-2026-5\" data-track-click=\"{&quot;element_name&quot;:&quot;body_link&quot;,&quot;event&quot;:&quot;tout_click&quot;,&quot;index&quot;:&quot;bi_value_unassigned&quot;,&quot;product_field&quot;:&quot;bi_value_unassigned&quot;}\" rel=\"nofollow noopener\">Supercharger stalls<\/a> at 75 Waterloo Street, a triangular vehicle storage lot near the intersection of Alemany Boulevard and Bayshore Boulevard, alongside Highway 101.<\/p>\n<p>The proposed station would be among Tesla&#8217;s largest globally, and a rare project of that scale inside a major city. By comparison, Tesla&#8217;s planned V4 Supercharger at 25 Mason Street, near Market Street in the city, would have 35 stalls. That permit application was submitted on May 18.<\/p>\n<p>                    <img xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"lazy-image \" encoding=\"UTF-8\" width=\"1\" height=\"1\" data-content-type=\"image\/png\" srcs=\"{&quot;https:\/\/i.insider.com\/6a7e3fdfe3df4d0cbe685ce8&quot;:{&quot;contentType&quot;:&quot;image\/png&quot;,&quot;aspectRatioW&quot;:1646,&quot;aspectRatioH&quot;:1100}}\" alt=\"Architectural site plan for a Tesla Supercharger layout with parking stalls, equipment labels, streets, and title block.\"\/><\/p>\n<p>                            Tesla&#8217;s 124-stall Supercharger hub plan, as seen in the company&#8217;s permit application to the city of San Francisco.\u00a0<\/p>\n<p>                    Official Tesla Filings<\/p>\n<p>Tesla&#8217;s biggest charging hubs are typically built along heavily traveled interstate corridors, where land is cheaper and demand surges during road-trip season. The hub sits at the crucial location where the 101 meets Interstate 280, which leads to the Peninsula, <a target=\"_self\" class=\"\" href=\"https:\/\/www.businessinsider.com\/silicon-valley-therapists-tech-workers-neuroses-2026-8\" data-track-click=\"{&quot;element_name&quot;:&quot;body_link&quot;,&quot;event&quot;:&quot;tout_click&quot;,&quot;index&quot;:&quot;bi_value_unassigned&quot;,&quot;product_field&quot;:&quot;bi_value_unassigned&quot;}\" rel=\"nofollow noopener\">Silicon Valley<\/a>, and <a target=\"_self\" class=\"\" href=\"https:\/\/www.businessinsider.com\/tesla-robotaxi-airport-permits-sfo-sjc-oak-2025-9\" data-track-click=\"{&quot;element_name&quot;:&quot;body_link&quot;,&quot;event&quot;:&quot;tout_click&quot;,&quot;index&quot;:&quot;bi_value_unassigned&quot;,&quot;product_field&quot;:&quot;bi_value_unassigned&quot;}\" rel=\"nofollow noopener\">San Francisco International Airport<\/a>. It&#8217;s also not far from Bernal Heights and the Bayview, which have significant residential populations.<\/p>\n<p>Some of Tesla&#8217;s largest charging locations include a 200-stall station in Yeehaw Junction, Florida, and a 164-stall station in Kern County, California. While the latter became fully operational in November 2025, the largest hub in Florida has yet to open.<\/p>\n<p>Based on maps submitted to the city, the 124 stalls would use a conventional parking configuration rather than the pull-through stalls Tesla has introduced at some newer locations.<\/p>\n<p>                    <img xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"lazy-image \" encoding=\"UTF-8\" width=\"1\" height=\"1\" data-content-type=\"image\/png\" srcs=\"{&quot;https:\/\/i.insider.com\/6a7e3fa5e3df4d0cbe685ce6&quot;:{&quot;contentType&quot;:&quot;image\/png&quot;,&quot;aspectRatioW&quot;:1858,&quot;aspectRatioH&quot;:956}}\" alt=\"Architectural sheet showing four building elevations and a floor plan with annotated materials, canopy, doors, and lighting.\"\/><\/p>\n<p>                            The plans include a roughly 416-square-foot &#8220;micro-amenity&#8221; building.\u00a0<\/p>\n<p>                    Official Tesla Filings<\/p>\n<p>The plans indicate the station would operate around the clock and include a roughly 416-square-foot &#8220;micro-amenity&#8221; building. Sketches show that the building contains two gender-neutral, accessible restrooms with diaper-changing stations, water fountains, and vending machines, as well as space for storage, cleaning equipment, and the site&#8217;s security and IT systems. The vending area would offer coffee, hot drinks, and snacks.<\/p>\n<p>The plans do not appear to include solar canopies or Tesla Megapack batteries, features used at some of the company&#8217;s other large charging hubs. Solar canopies are typically used to lower peak-demand costs and keep chargers operating during some outages.<\/p>\n<p>The latest version of the application was submitted on July 29, but the project still needs to go through the city&#8217;s permitting process. No construction or opening date has been announced.<\/p>\n<p>Tesla did not respond to a request for comment.<\/p>\n","protected":false},"excerpt":{"rendered":"Tesla is making a major bet on demand from urban EV owners by planning an unusually large charging&hellip;\n","protected":false},"author":2,"featured_media":432277,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[4188,130949,171716,553,171719,168449,171717,171715,171712,171718,101,103,102,104,106,105,171714,15437,171711,1090,171713],"class_list":["post-432276","post","type-post","status-publish","format-standard","has-post-thumbnail","category-san-francisco","tag-building","tag-city-show","tag-crucial-location","tag-florida","tag-hot-drink","tag-hub","tag-interstate-corridor","tag-permit-application","tag-prime-san-francisco-crossroad","tag-rare-project","tag-san-francisco","tag-san-francisco-headlines","tag-san-francisco-news","tag-sf","tag-sf-headlines","tag-sf-news","tag-solar-canopy","tag-station","tag-supercharger-plan","tag-tesla","tag-v4-supercharger-stall"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/432276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=432276"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/432276\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/432277"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=432276"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=432276"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=432276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}