{"id":433818,"date":"2026-08-15T14:24:39","date_gmt":"2026-08-15T14:24:39","guid":{"rendered":"https:\/\/www.newsbeep.com\/us-ca\/433818\/"},"modified":"2026-08-15T14:24:39","modified_gmt":"2026-08-15T14:24:39","slug":"ground-mounted-california-solar-plant-hits-101-expected-output","status":"publish","type":"post","link":"https:\/\/www.newsbeep.com\/us-ca\/433818\/","title":{"rendered":"Ground-mounted California solar plant hits 101% expected output"},"content":{"rendered":"<p class=\"wp-block-paragraph\">ForeFront Power has brought a new solar system online at a water treatment plant in Fresno, California. The project uses Erthos\u2019 Earth Mount Solar technology to cut construction costs and increase power density.<\/p>\n<p class=\"wp-block-paragraph\">The system entered commercial operation in late March 2026. It has since produced 862 megawatt-hours of electricity for the City of Fresno.<\/p>\n<p class=\"wp-block-paragraph\">The installation sits at the Northeast Surface Water Treatment Plant. It forms part of a larger renewable energy program covering three Fresno water facilities.<\/p>\n<p>Solar skips traditional steel<\/p>\n<p class=\"wp-block-paragraph\">Erthos\u2019 system takes a different approach to ground-mounted solar construction. Its photovoltaic modules sit directly on the ground instead of using conventional steel racking.<\/p>\n<p class=\"wp-block-paragraph\">That design removes much of the steel procurement and installation work found in traditional solar projects. ForeFront Power also avoided costly civil upgrades at the Fresno site.<\/p>\n<p class=\"wp-block-paragraph\">Those savings helped make the project financially viable during a period of high labor and material costs. ForeFront Power can then offer Fresno electricity at a fixed rate through a 20-year power purchase agreement.<\/p>\n<p class=\"wp-block-paragraph\">The system also packs more generation into each acre. Erthos says its layout eliminates conventional row spacing between solar modules.<\/p>\n<p class=\"wp-block-paragraph\">The panels can also follow terrain with slopes reaching 15 percent. That feature helped the system adapt to the site\u2019s existing topography without requiring major changes to the land.<\/p>\n<p>Early output beats expectations<\/p>\n<p class=\"wp-block-paragraph\">Performance has given the project an encouraging start. The solar array has generated energy at an average of 101 percent of its expected output.<\/p>\n<p class=\"wp-block-paragraph\">ForeFront Power expects the broader Fresno portfolio to deliver major savings for local ratepayers. The three projects total 27 megawatts of DC capacity.<\/p>\n<p class=\"wp-block-paragraph\">The portfolio should save more than $122 million in electricity costs through 2045. Those installations combine solar generation with smart <a href=\"https:\/\/interestingengineering.com\/energy\/sodium-ion-battery-crystal-grains\" id=\"https:\/\/interestingengineering.com\/energy\/sodium-ion-battery-crystal-grains\" target=\"_blank\" rel=\"dofollow noopener\">battery<\/a> storage.<\/p>\n<p class=\"wp-block-paragraph\">Erinne Davis, a senior project manager at ForeFront Power, said the site suited Erthos\u2019 approach. The technology helped the team avoid expensive construction work that could have stalled the project.<\/p>\n<p class=\"wp-block-paragraph\">She said those avoided costs helped the Fresno installation move forward. They also allowed the project to offer electricity at a lower rate than the local utility.<\/p>\n<p>Robots handle solar cleaning<\/p>\n<p class=\"wp-block-paragraph\">The Fresno system also uses an autonomous robot for routine panel cleaning. Erthos maintains the array under an energy services agreement with ForeFront Power.<\/p>\n<p class=\"wp-block-paragraph\">The ErthBot uses a dry nylon brush to clean the photovoltaic modules. Each unit can service more than 3.5 megawatts of solar capacity.<\/p>\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/interestingengineering.com\/ai-robotics\/samsungs-humanoid-robot-with-lower-costs\" id=\"https:\/\/interestingengineering.com\/ai-robotics\/samsungs-humanoid-robot-with-lower-costs\" target=\"_blank\" rel=\"dofollow noopener\">robot<\/a> operates at night when cleaning is needed. After completing its route, it returns to a charging dock for its next deployment.<\/p>\n<p class=\"wp-block-paragraph\">That automated maintenance approach reduces the labor needed to keep a large solar array operating efficiently. It also allows cleaning crews to avoid repeated manual work across the expansive array.<\/p>\n<p class=\"wp-block-paragraph\">Erthos will handle the robot\u2019s operation and maintenance throughout the agreement. The companies will also track the system\u2019s performance as it continues operating.<\/p>\n<p class=\"wp-block-paragraph\">For Fresno, the project offers more than new renewable generation. It shows how changing the physical design of solar farms can reduce construction costs.<\/p>\n<p class=\"wp-block-paragraph\">That approach could prove useful for other public facilities facing high construction expenses. For large energy users, lower installation costs can improve the economics of switching to <a href=\"https:\/\/interestingengineering.com\/energy\/china-record-topcon-solar-cell-efficiency\" id=\"https:\/\/interestingengineering.com\/energy\/china-record-topcon-solar-cell-efficiency\" target=\"_blank\" rel=\"dofollow noopener\">solar<\/a> power.<\/p>\n","protected":false},"excerpt":{"rendered":"ForeFront Power has brought a new solar system online at a water treatment plant in Fresno, California. The&hellip;\n","protected":false},"author":2,"featured_media":433819,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[7,172258,172259,172260,112,114,113,13880,50047,8460,172261],"class_list":["post-433818","post","type-post","status-publish","format-standard","has-post-thumbnail","category-fresno","tag-california","tag-earth-mount-solar","tag-erthos","tag-forefront-power","tag-fresno","tag-fresno-headlines","tag-fresno-news","tag-renewable-energy","tag-solar-panels","tag-solar-power","tag-solar-technology"],"_links":{"self":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/433818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/comments?post=433818"}],"version-history":[{"count":0,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/posts\/433818\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media\/433819"}],"wp:attachment":[{"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/media?parent=433818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/categories?post=433818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsbeep.com\/us-ca\/wp-json\/wp\/v2\/tags?post=433818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}